Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC | ₹10.0 L | L1 | Accepted-AOC Lowest quoted |
| 2 | L2₹10.4 L+₹39,185 (3.91%)Rejected-Finance | ₹10.4 L+₹39,185 (3.91%) | L2 | Rejected-Finance L2 rejected |
| 3 | L3₹10.5 L+₹49,639 (4.96%)Rejected-Finance NIL | ₹10.5 L+₹49,639 (4.96%) | L3 | Rejected-Finance L3 rejected |
| 4 | L4₹10.5 L+₹53,737 (5.37%)Rejected-Finance | ₹10.5 L+₹53,737 (5.37%) | L4 | Rejected-Finance L4 rejected |
| 5 | L5₹10.8 L+₹82,685 (8.26%)Rejected-Finance | ₹10.8 L+₹82,685 (8.26%) | L5 | Rejected-Finance L5 rejected |
Tender Value
₹12.0 L
EMD Value
₹30,023
Closing Date
9 Jan 2025, 3:00 pmClosed
Assistant Executive Engineer
Water Supply Project Sub Division Kerala Water Authority Vatakara
DEPOSIT-Public tap Disconnection- Disconnection of unwanted public taps in various places of vatakara municipality- Pipeline Work
2024_KWA_720525_1
AEEWSP13/2024-25
Open Tender
Civil Works - Water Works
Item Wise
90 days
Vatakara Muncipality
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹30,023
Yes
12 Mar 2025
30 Dec 2024
10 Jan 2025
30 Dec 2024
9 Jan 2025
30 Dec 2024
Amount
Permenant Disconnection of Public Tap
100.51.1: Disconnecting water connection from service mains along earthern road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting if any, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.
100.51.2:Disconnecting water connection from service mains along Concrete road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.
100.51.3:Disconnecting water connection from service mains along Asphalt road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.
100.59.2:Refilling the trenches with a wet mix of close graded granular materials (Stone aggregate - 25mm nominal size - 17.5%, Stone aggregate - 10mm nominal size - 17.5%, Crushed Stone - 2.36mm to 12.5mm - 25%, Stone chippings / screenings - 4.75mm nominal size - 20%, Stone chippings / screenings - 150 micron nominal size - 20%), mixing properly after adding sufficient quantity of water, refilling in layers not exceeding 150mm, compacting properly at Optimum Moisture Content with Surface Plate Vibrator and disposing the excavated material etc. complete, including traffic control, providing caution boards and as per direction of Engineer-in-charge for road restoration works in pipeline leak sites.
100.59.3:Restoring the road surfaces by providing and laying factory made cold bitumen-aggregate pot-hole repair mix in two layers of 25mm thick (total 50mm thick), by cleaning the surface with brooms etc. to remove dust/debris/water etc, placing the premix, compacting properly with hand-rammer etc. complete, including traffic control, providing caution boards and as per direction of Engineer-in-charge for road restoration works in pipeline leak sites.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
MADHUSOODHANAN O (BID ID -2052176)
Abc (BID ID -2055125)
JYOTHIBASU V (BID ID -2049972)
nil (BID ID -2054872)
Bidder Name
JYOTHIBASU V
MADHUSOODHANAN O
AMEERSHA.P
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .