Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Finance 22 12 SIJUA DHANBAD 828121 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828121 | +19.50% | ₹2.8 L | L1 | Admitted-Finance |
| 2 | L2₹2.9 L+₹8,137.05 (2.93%)Admitted-Finance 22 12 P O SIJUA DHANBAD 828121 DHANBAD 828121 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828121 | +23.00% | ₹2.9 L+₹8,137.05 (2.93%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical ALI NAGAR KABRI PATTI BHULI ROAD DHANBAD JHARKHAND | DHANBAD | DHANBAD | JHARKHAND | 826001 | - | - | - | Rejected-Technical Reject |
Tender Value
₹2.7 L
EMD Value
₹3,500
Closing Date
25 Jun 2026, 6:00 pmClosed
AREA MANAGER (ENM) KATRAS AREA
OFFICE OF THE GENERAL MANAGER BCCL KATRAS AREA IV ENM DEPT. Post-SIJUA PIN-828121 JHARKHAND
(1) COMPLETE REPAIRING/REWINDING OF 500KVA,6.6KV/550 VOLT MAKE MARSON CALCUTTA, SL.NO.1044 DISTRIBUTION TRANSFORMER OF SALANPUR COLLIERY OF KATRAS AREA..
2026_BCCL_360969_1
BCCL/KA/ENM/E-TEN/2026-27/34 DATE-10.06.2026
Open Tender
Electrical and Maintenance Works
Percentage
15 days
ASGKCC KATRAS AREA IV
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,500
3 Aug 2026
10 Jun 2026
26 Jun 2026
10 Jun 2026
25 Jun 2026
10 Jun 2026
10 Jun 2026 - 16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ITEM DESCRIPTION / HEADLING | |||||
| 1.01 | NEW COPPER WIRE REQUIRED OF REPLACEMENT OF PRIMARY AND SECONDARY COIL,48 KG. | - | KG | 1,000 | - |
| 1.02 | NEW COPPER STRIP REQUIRED FOR INTERNAL CONNECTIONS. | - | KG | 1,000 | - |
| 1.03 | COPPER STUD WITH BUSHING PRIMARY COMPLETE SET. | - | Nos | 3,500 | - |
| 1.04 | 'COPPER STUD WITH BUSHING SECONDARY COMPLETE SET. | - | Nos | 3,500 | - |
| 1.05 | INSULATION MATERIALS OF PRIMARY AND SECONDARY COIL TPC AND OTHER REQUIRED INSULATION AND TAPPING MATERIALS.(TOTAL COPPER X 1000 X 15 %) | - | Nos | 27,000 | - |
| 1.06 | CORK SHEET PRIMARY AND SECONDARY BUSHING SIDE. | - | Nos | 1,200 | - |
| 1.07 | ENERY CHARGE FOR HEATING BAKING OF CORE AND COILS | - | UNITS | 4.35 | - |
| 1.08 | REPAIRING OF TAP CHANGING SYSTEM | - | JOB | 3,500 | - |
| 1.09 | SOLDERING MATERIALS(RUPATON) WITH OXYGEN AND DA. | - | JOB | 2,500 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.38 MB
BOQ_373840.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .