| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 CrAccepted-AOC | ₹16.5 Cr | L1 | Accepted-AOC First Lowest |
| 2 | L2₹17.7 CrRejected-AOC KANNUR | KERALA | 670001 | ₹17.7 Cr | L2 | Rejected-AOC Second Lowest |
Tender Value
₹15.4 Cr
EMD Value
₹5 L
Closing Date
20 Apr 2022, 3:00 pmClosed
Project Director
The Project Director, Kerala Road Fund Board, Project Management Unit, Ground Floor, BSNL Office Building at CGM(O), Doorsanchar Bhavan, PMG Junction Trivandrum-695033
Construction
2022_KRFB_472779_2
PWD/KR/TR/93834/2021_5_1/1
Open Tender
Civil Works - Bridges
545 days
Kozhikode
Please refer Tender documents.
7 documents required · 7 mandatory
₹19,518
Yes
₹5 L
Yes
21 Jul 2023
1 Apr 2022
23 Apr 2022
1 Apr 2022
20 Apr 2022
1 Apr 2022
Amount
Appendix A - Bridge Proper
2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.22:Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing.
12.25.3:Bored cast-in-situ M35 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-1200 mm
12.39:Providing and laying of PCC M15 leveling course 100 mm thick below the pile cap
12.38.D.2:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification R C C Grade M35 - Using Batching plant, Transit Mixer and Concrete pump
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.5.H.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m
OD21571/2021-2022:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications <br><br> RCC Grade M45 - Using concrete Mixer - Height upto 5m
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
14.3:High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications
14.1F.2.B:"Furnishing and Placing PSC Grade M45 Using Batching Plant, Transit Mixer, and Concrete Pump as per drawing and Technical Specification. For T-beam & slab including launching of precast girders by launching truss upto 40 m span - Height 5m to 10m
OD42426/2021-2022:Furnishing and Placing PSC Grade M45 Using Batching Plant in Superstructure as per drawing and technical specification, For Bowstring arch and Slab including form work
OD21563/2021-2022:Macolloy M460 76dia carbon steel wire including all charges etc. complete
OD43163/2021-2022:Supplying, fitting and fixing in position true to line and level POTPTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete as per drawing and approved Technical Specifications.
14.1E.2.1.B:"Furnishing and Placing PSC Grade M40 Using Batching Plant, Transit Mixer, and Concrete Pump as per drawing and Technical Specification. For solid/voided slab super-structure - Height 5m to 10m
14.1A.2.1.B:Furnishing and Placing Reinforced Cement Concrete Grade M20 Using Batching Plant, Transit Mixer, and Concrete Pump as per drawing and Technical Specification. For solid slab super-structure - Height 5m to 10m
14.11:Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification.
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
14.22:Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation
OD21569/2021-2022:Supplying and laying 160mm dia. 2.5Kg/cm2 PVC pipe and tying to reinforcement to keep in position including cost and conveyance of material etc. complete for conduit in foot path.
5.2.c:Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.30 - 0.35 kg per sqm on the prepared Cement Concrete pavementcleaned with mechanical broom.
5.15:Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen (VG - 30) meeting the requirements given in table 500-40, prepared by using a mastic cooker and laid to the required level and slope after cleaning the surface, including providing an antiskid surface with bitumen precoated fine grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into the surface when the temperature of surfaces is not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 516
OD21572/2021-2022:Providing drainage spout with 63mm pvc pipe 60cm long including all cost conveyance and labour charges etc complete
OD43150/2021-2022:Providing, Fixing and erecting 50 mm dia stainless steel hollow (Grade-304) pipe railing in 2 rows duly painted on Medium Weight Steel Channel ( ISMC series) 100 mm x 50 mm, 0.55 m above RCC crash barrier, 2 m centre to centre, complete as per approved drawings including painting over suitable primer .
13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
OD62370/2021-2022:Providing and erecting street light mounted on a steel circular hollow pole of standard specifications for street lighting of 6m height, bottom dia 135mm fixed on parapets with cement concrete fitted with LED lamp with illumination of 50 lux of standard make and fixed firmly in concrete foundation as per direction of Engineer in charge
Appendix B - Approach Road and Side Protection Works
3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
OD43821/2021-2022:Providing vibrated stone column 600mm dia at required depth and spacing with material of proper gradation to form dense column fully interlocked with surrounding ground etc all complete as per approved design and direction of engineer in charge
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
13.5.D.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M30 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.10:Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
3.16:Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
3.17:Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.3.2.a:Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with a bituminous binder (VG 30), transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction For Grading II - (19 mm nominal size)
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
3.13.5.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Marshy soil - Mechanical Means
OD21562/2021-2022:Putting up ring bund of 1.80m height, 1.50m width, using sand filled bags in two rows and filled with clay in between the sand filled gunny bags, including consolidation and well maintaining the ring bund till the completion of work and removal of ring bund after completion of the work, with all cost and conveyance of materials, labour charges etc. complete.
OD21567/2021-2022:Dry rubble masonry for retaining walls usinf blasted rubble size below 40 dm3 including wedging them tightly with chips including all cost and conveyance of materials, labour charges etc. complete
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
8.35:Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :-
8.4.4:Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 80 mm x 60 mm rectangular
8.4.2:Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 60 cm equilateral triangle
8.5:Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
8.6:Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 High Intensity Micro Prismatic (Type IV) grade sheeting fixed over aluminum sheeting, 2 mm thick/aluminum composite material sheeting 4 mm thick with an area exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on suitably designed GI pipe pole not less than 50mm NB , 2 Nos. confirming to IS 1239, firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
55.10.1:Providing and erecting retro-reflectorised Object Hazard Marker 300mm x 900mm Providing and erecting retro-reflectorised Object Hazard Marker sign with 07 years warranty, manufactured as per IRC 67 USING Type IV ASTM D 4956-09 micro prismatic retro reflective sheeting fixed over aluminium sheetig, 2 mm thick / aluminium composit material sheeting 4 mm thick with suitable back support frame and supported on a mild steel angle iron post 75mmx75mmx6mm, firmly fixed 30cm above ground level by means of properly designed foundation with M 15 grade cement concrete 30cmx30x45cm, 45cm below ground level including painting all non-reflective faces with epoxy paint 2 coats over epoxy primer as per approved drawing and clause 801.300 mm x 900 mm
55.16:Providing and fixing guard post Providing and fixing guard post of size 200mmx200mm, 1400mm long, 800mm above ground level and 600mm below GL. casted in M20 Grade concrete reinforced with 4 nos of 8mm dia longitudinal bars and 6mm dia stirrups @ 100mm c/c, firmly fixed in position by means of foundation of size 0.5mx0.5mx0.7m in M15 grade concrete below ground level including painting 2 coats on exposed surface with synthetic enamel paint in alternate white & black band 20cm wide
OD21568/2021-2022:Providing diamond retro reflectorised sheets pasted on glazed tiles of size 20x10cm including all charges etc. complete.
OD62372/2021-2022:Supply, Installation and Commissioning of Solar Powered blinker with one standard pole and one LED retrofit as per standard specification and directed by Engineer in Charge
Appendix C - C D Works
2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means
2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar.
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
8.1.A:Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC Using Concrete Mixer on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
8.20:Providing, Fixing and erecting 50 mm dia GI pipe railing in 3 rows duly painted on Tubular Steel Railing on Medium Weight Steel Channel ( ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings including painting over suitable primer .
55.23:Supplying and laying interlocking tile 80mm or nearest size thickness, minimum strength M30 including providing a layer of 6mm aggregate for 5cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc. complete.
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
Appendix D - Construction of Temporary Bridge
OD21564/2021-2022:Supplying coconut piles 6m to 9m long includinhg cost, conveyance, labour charges etc. complete.
OD21566/2021-2022:Driving down coconut piles for foundation including cost, coveyance of materials, labour charges etc. complete.
OD21573/2021-2022:Providing platform over pipes of size 15mm to 20mm. Dia errected and platform made up of 25 Nos. post of average 15m long and the platform consist 25mm, thick planks placed to 125mm and 75 mm irul wood joists placed tied at 60 cm intervals including all hire and labour chargesfor fixing and laying the platform, cost of nails, coir etc., includingremoval of entire platform after completion of the work.
OD21565/2021-2022:Supplying and fixing coconut 1/4 split for hand rail including all charges etc. complete
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
Bidder Name
PMR Construction Company
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx