Tender Value
₹5.6 L
EMD Value
Exempted
Closing Date
4 Sept 2026, 12:00 pm7d left
Systems/Equipments (Version 2) - Industry Unit; To replace the reflector plate of the fibrizer and give a satisfactory trial; Buyer
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Cutting and removing the weak and damaged side plate of SRC and IRC and replacing it with the given new 08 10 mm plate and giving a leakproof satisfactor..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cutting and removing the weak and damaged bottom plate of SRC and IRC and replacing it with the given new 08 10 mm plate and giving a leakproof satisfact..
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; To make and errect the guide of SRC and IRC as per the given sample and give a satisfactory trial; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To make runner boxes of SRC and IRC and give satisfactory trials; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To do the work of fitting the liner of the given SS plate at the bottom of SRC and IRC and give a satisfactory trial; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To fabricate boots using 8 10 mm MS plates provided by SRC and IRC and to conduct a satisfactory trial; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Carry out strengthening work using the channels and angles provided by SRC and IRC and conduct a satisfactory trial; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; To fabricate the weak sloppy plates of the Donali suit fitted on Milo from the given MS plate as per the drawing and give a satisfactory trial; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the worn out TRPF cover fitted on the mill and making and fitting a new cover using the plate given as per the drawing sample and giving a satis..
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; To carry out the work of tipping the teeth of mill rollers and conduct a satisfactory trial; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To carry out the work of Chevron cutting as per requirement on mill rollers and give satisfactory trials; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Work involving the errectation of broken teeth on the mill s pressure chute repair of worn out teeth via hard facing and conducting a satisfactory tria..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; dismantling the old pressure chute errected on the mill completely replacing the corroded section repairing and welding the damaged parts of the SS plate ..
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Fabricate the juice tank for the mill house using the provided 6 8 mm plate and conduct a satisfactory trial run; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the bottom of the supply juice tank errecting a 12 mm plate in its place and conducting a satisfactory trial; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Manufacturing the bed for the S R C and I R C
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Remove the worn out TRPF headstock side plate errect a 6mm plate in its place and conduct a satisfactory trial; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Fabricating teeth for the hydraulic grab replacing old or damaged teeth with new ones and conducting a satisfactory trial run; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; a Dismantling old columns beam channels etc b Manufacturing and installing new columns beam channels etc; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the old corroded platform and replacing it with a new one; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Installing 16 inch 18 inch manholes with blinds; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to 20 HP; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded pipe lines up to 12 Inch and providing satisfactory leak proof trials; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded tees up to 12 Inch and providing satisfactory leak proof trials; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded nipples up to 12 Inch and providing satisfactory leak proof trials; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated cross member up to 12 Inch and providing satisfactory leak proof trials; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated band up to 12 Inch and providing satisfactory leak proof trials; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated flange up to 12 Inch and providing satisfactory leak proof trials; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak sloping reducer up to 12 Inch and providing a satisfactory leak proof trial; Buyer
9801690
GEM/2026/B/7957266
Two Packet Bid
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Rep
Saharanpur, Uttar Pradesh
Item wise evaluation
SERVICE
5 documents required · 5 mandatory
5 yrs
₹1.6 L
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| Systems/Equipments (Version 2) - Industry Unit; To replace the reflector plate of the fibrizer and give a satisfactory trial; Buyer | - | - | - |
| Repair | - | - | - |
| Maintenance | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Cutting and removing the weak and damaged side plate of SRC and IRC and replacing it with the given new 08 10 mm plate and giving a leakproof satisfactor.. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cutting and removing the weak and damaged bottom plate of SRC and IRC and replacing it with the given new 08 10 mm plate and giving a leakproof satisfact.. | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; To make and errect the guide of SRC and IRC as per the given sample and give a satisfactory trial; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To make runner boxes of SRC and IRC and give satisfactory trials; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To do the work of fitting the liner of the given SS plate at the bottom of SRC and IRC and give a satisfactory trial; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To fabricate boots using 8 10 mm MS plates provided by SRC and IRC and to conduct a satisfactory trial; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Carry out strengthening work using the channels and angles provided by SRC and IRC and conduct a satisfactory trial; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; To fabricate the weak sloppy plates of the Donali suit fitted on Milo from the given MS plate as per the drawing and give a satisfactory trial; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the worn out TRPF cover fitted on the mill and making and fitting a new cover using the plate given as per the drawing sample and giving a satis.. | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; To carry out the work of tipping the teeth of mill rollers and conduct a satisfactory trial; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To carry out the work of Chevron cutting as per requirement on mill rollers and give satisfactory trials; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Work involving the errectation of broken teeth on the mill s pressure chute repair of worn out teeth via hard facing and conducting a satisfactory tria.. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; dismantling the old pressure chute errected on the mill completely replacing the corroded section repairing and welding the damaged parts of the SS plate .. | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Fabricate the juice tank for the mill house using the provided 6 8 mm plate and conduct a satisfactory trial run; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the bottom of the supply juice tank errecting a 12 mm plate in its place and conducting a satisfactory trial; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Manufacturing the bed for the S R C and I R C | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Remove the worn out TRPF headstock side plate errect a 6mm plate in its place and conduct a satisfactory trial; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Fabricating teeth for the hydraulic grab replacing old or damaged teeth with new ones and conducting a satisfactory trial run; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; a Dismantling old columns beam channels etc b Manufacturing and installing new columns beam channels etc; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the old corroded platform and replacing it with a new one; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Installing 16 inch 18 inch manholes with blinds; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to 20 HP; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded pipe lines up to 12 Inch and providing satisfactory leak proof trials; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded tees up to 12 Inch and providing satisfactory leak proof trials; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded nipples up to 12 Inch and providing satisfactory leak proof trials; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated cross member up to 12 Inch and providing satisfactory leak proof trials; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated band up to 12 Inch and providing satisfactory leak proof trials; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated flange up to 12 Inch and providing satisfactory leak proof trials; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak sloping reducer up to 12 Inch and providing a satisfactory leak proof trial; Buyer | - | - | - |
GENERAL MANAGER, sarsawa, Saharanpur, (The Kisan Cooperative Sugar Factory Ltd.)
Exempted
Yes
24 Aug 2026
24 Aug 2026
4 Sept 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9801690.pdf
GEM_BID • 0.39 MB
1787581523.xlsx
GEM_OTHER • 0.01 MB
1787581587.pdf
GEM_OTHER • 3.27 MB
1787581593.pdf
GEM_OTHER • 3.27 MB
1787581598.pdf
GEM_OTHER • 3.27 MB
sanction_12538416-6e30-44e5-82871787582215415_karanrathi.ssw.pdf
GEM_OTHER • 3.27 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].