Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹1.9 CrAdmitted-Finance | ₹1.9 Cr | H1 | Admitted-Finance |
| 2 | H2₹1.9 CrAdmitted-Finance | ₹1.9 Cr | H2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S PERIASAMY H2 | SHAKTHIVEL G G H1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 1,479 | One Cubic Metre | 173 ₹2.6 L | 200 ₹3.0 L |
| 2.00 | Supplying and filling in foundation and basement with Crushed Stone dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 126 | One Cubic Metre | 406 ₹51,156 | 420 ₹52,920 |
| 3.00 | Cement Concrete M 7.5 --1:4:8 (one Cement Four M.Sand and Eight Aggregate) for Using 40mm HBG for foundation curing etc., complete complying with std.spe and as directed by the dept.officers | 126 | One Cubic Metre | 5,514 ₹6.9 L | 5,550 ₹7.0 L |
| 4.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500,Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 599 | One Quintal | 9,475 ₹56.8 L | 9,700 ₹58.1 L |
| 5.00 | Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for RETAINING SIDE WALL | 981 | One Cubic Metre | 12,080 ₹1.2 Cr | 12,100 ₹1.2 Cr |
Updated dates
Tender Value
₹2.2 Cr
EMD Value
₹2.2 L
Closing Date
24 Jan 2026, 3:00 pmClosed
The Commissioner, Tiruchirappalli City Corporation
Bharathidasan Road, Cantonment, Trichy - 620 001
Construction of Strom water channal Retaining Wall at Rettai Vaikkal From Sanjeevi Nagar Main Road-Near Miawaki to Balaji Nagar Cross Street Reach I in Ward No 15
2026_MAWS_642000_1
E8/14601/2025 SR NO.3
Open Tender
Civil Works
60 days
WARD 15
CONDITION
3 documents required · 3 mandatory
₹10,000
₹2.2 L
Main office, Tiruchirappalli City Corporation
16 Mar 2026
10 Jan 2026
24 Jan 2026
10 Jan 2026
24 Jan 2026
12 Jan 2026
12 Jan 2026
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Supplying and filling in foundation and basement with Crushed Stone dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.
Cement Concrete M 7.5 --1:4:8 (one Cement Four M.Sand and Eight Aggregate) for Using 40mm HBG for foundation curing etc., complete complying with std.spe and as directed by the dept.officers
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500,Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire)
Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for RETAINING SIDE WALL
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_768954.xls
BOQ • 0.29 MB
BidDoc224.pdf
Tender Documents • 0.62 MB
Download all tender documents and submit your bid