Loading…
Loading…
Tender Value
₹28.7 L
EMD Value
₹28,800
Closing Date
20 Jul 2026, 4:00 pmClosed
EE OFFICE - PRODDATUR
TECHNICAL OFFICE O.O EXECUTIVE ENGINEER R and B DIVISION PRODDATUR
Annual Maintenance of Major District Roads pertaining to R and B Section Jammalamadugu for the year 2026 2027 in YSR Kadapa District
958702
14/TO/2025-2026
OPEN - NCB
Road Work
YSR
3 documents required · 3 mandatory
₹1,018
₹28,800
11 Jul 2026
6 Jul 2026
6 Jul 2026
Providing, Laying, Spreading and compacting graded HBD crushed stone aggregate to Wet Mix macadem specification ( 5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.
Providing B.T. patch work for pot holes using 40mm HBD metal with required quantity of 9.5-11.2mm size HBG key chips and 42 Kgs of 80/100 grade bitumen per one cum of work for filling the pot holes including removal of loose material in the pot holes trimming the edges to provide form vertical faces cleaning applying tack coat filling the pot holes compacting and finishing including cost and conveyance of materials, T&P charges and all labour charges for all operations etc., complete for finished item of work as directed by the Engineer-in-charge
Providing B.T. patch work for pot holes using 9.5-11.2mm HBD Metal with required quantity of 80/100 grade bitumen at 72 Kgs / 1 cum of work for filling the pot holes including removal of loose material in the pot holes, trimming the edges to provide form vertical faces, cleaning, applying tack coat, filling the pot holes compacting with power Road roller of 8 to 10 T and finishing including cost and conveyance of materials T&P charges and all labour charges for all operations etc., complete for finished item of work as directed by the Engineer-in-charge
Clearing of Juliflora (Prosafies) jungle including uprooting and removing for juliflora stumps and as directed by the departmental officers during execution of work
White washing two coats with white cement to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental charges such as scaffolding, lift charges etc., and coverheads and contractors profit complete for finished item of work
Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., complete for finished item of work as per MoRT&H specification 301 (5th Revision) and as directed by the Engineer-in-Charge
Forming shoulders with borrowed useful seclected earth having MDD of not less than 1.75 gms/cc from outside road boundary by mechnical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with vibratory road roller @ OMC to meet requirement of table 300-2 of MORT&H including all hire and operational charges of T&P , complete for finished item of work as per MORT&H specification 305 (5th revision)
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
BOQ_14.xlsx
TENDER_DOCUMENT • 0.01 MB
DTS_14.docx
TENDER_DOCUMENT • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .