| 1 | L1₹75.8 LAccepted-AOC ALOOR THAYALTHOTTY HOUSE MULIYAR | ₹75.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹76.2 L+₹35,618.98 (0.47%)Rejected-AOC | ₹76.2 L+₹35,618.98 (0.47%) | L2 | Rejected-AOC L2 |
| 3 | L3₹76.7 L+₹90,477.80 (1.19%)Rejected-AOC UMAIRA MANZIL KANNUR PO KASARAGOD | ₹76.7 L+₹90,477.80 (1.19%) | L3 | Rejected-AOC L3 |
| 4 | L4₹77.7 L+₹1.8 L (2.39%)Rejected-Finance | ₹77.7 L+₹1.8 L (2.39%) | L4 | Rejected-Finance L4 |
| 5 | L5₹78.1 L+₹2.3 L (3.00%)Rejected-Finance | ₹78.1 L+₹2.3 L (3.00%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | MUKESH VARKEY L8 | MANZOOR KUNHAMOO L3 | m aboobacker L7 | ABDULLA A T L1 | M/s Issac and Son Ventures Pvt. Ltd. L2 | HARIHARAN K L5 | ANEESH KUMAR C N L4 | MOHAMMED ARSHAD P A L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00APPENDIX A : RECONSTRUCTION OF VCB | |||||||||||
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 231.07 | cum | 1,352.64 ₹3,12,561.29 | 1,228.34 ₹2,83,838.67 | 1,294.14 ₹2,99,043.4 | 1,213.86 ₹2,80,492.7 Lowest | 1,219.57 ₹2,81,812.14 | 1,250.28 ₹2,88,908.45 | 1,243 ₹2,87,226.23 | 1,271.48 ₹2,93,807.24 |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 25.52 | cum | 2,190.19 ₹55,904.6 | 1,988.93 ₹50,767.44 | 2,095.48 ₹53,487.13 | 1,965.49 ₹50,169.13 Lowest | 1,974.72 ₹50,404.73 | 2,024.44 ₹51,673.83 | 2,012 ₹51,356.3 | 2,058.78 ₹52,550.36 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 11.92 | cum | 3,195.23 ₹38,080.75 | 2,901.61 ₹34,581.39 | 3,057.06 ₹36,434.04 | 2,867.41 ₹34,173.79 Lowest | 2,880.89 ₹34,334.45 | 2,953.43 ₹35,198.98 | 2,936 ₹34,991.25 | 3,003.51 ₹35,795.83 |
| 1.00 | 60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. | 12 | metre | 1,250.98 ₹15,011.76 | 1,136.02 ₹13,632.24 | 1,196.88 ₹14,362.56 | 1,122.64 ₹13,471.68 Lowest | 1,127.91 ₹13,534.92 | 1,156.31 ₹13,875.72 | 1,149 ₹13,788 | 1,175.92 ₹14,111.04 |
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 160 | hour | 397.33 ₹63,572.8 | 360.82 ₹57,731.2 | 380.15 ₹60,824 | 356.57 ₹57,051.2 Lowest | 358.24 ₹57,318.4 | 367.27 ₹58,763.2 | 365 ₹58,400 | 373.49 ₹59,758.4 |
| 1.01 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 171.66 | cum | 224.18 ₹38,482.74 | 203.58 ₹34,946.54 | 214.49 ₹36,819.35 | 201.18 ₹34,534.56 Lowest | 202.13 ₹34,697.64 | 207.22 ₹35,571.39 | 206 ₹35,361.96 | 210.73 ₹36,173.91 |
| 1.01 | 2.9.3:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Hard rock (blasting prohibited) | 15.73 | cum | 1,373.41 ₹21,603.74 | 1,247.21 ₹19,618.61 | 1,314.02 ₹20,669.53 | 1,232.51 ₹19,387.38 Lowest | 1,238.3 ₹19,478.46 | 1,269.48 ₹19,968.92 | 1,262 ₹19,851.26 | 1,291.01 ₹20,307.59 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 183.81 | cum | 8,037.01 ₹14,77,266.73 | 7,298.47 ₹13,41,517.17 | 7,689.46 ₹14,13,384.26 | 7,212.46 ₹13,25,707.85 Lowest | 7,246.34 ₹13,31,935.26 | 7,428.8 ₹13,65,472.87 | 7,384 ₹13,57,238.27 | 7,554.79 ₹13,88,630.84 |
| 1.01 | 4.2.3:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 238.96 | cum | 10,230.42 ₹24,44,681.62 | 9,290.32 ₹22,20,033.45 | 9,788.02 ₹23,38,964.84 | 9,180.83 ₹21,93,869.5 Lowest | 9,223.96 ₹22,04,175.93 | 9,456.22 ₹22,59,677.24 | 9,400 ₹22,46,242.8 | 9,616.59 ₹22,97,999.58 |
Tender Value
₹91.4 L
EMD Value
₹50,000
Closing Date
26 Feb 2026, 6:00 pmClosed
Executive Engineer MI Division Kasaragod
Executive Engineer MI Division Kasaragod
K a s a r g o d D e v e l o p m e n t P a c k a g e - Reconstruction of VCB cum bridge at Alathadi- mukkood-RECONSTRUCTION OF VCB CUM BRIDGE AT ALATHADI -MUKKOOD IN KODOM BELUR GP-General Civil Work
2026_Irrig_837658_1
IRR/IA/TR/7108/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
545 days
Kodom Belur
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
18 Mar 2026
18 Feb 2026
28 Feb 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1APPENDIX A : RECONSTRUCTION OF VCB | |||||
| 1.001 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 1 | cum | - | - |
| 1.002 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1 | cum | - | - |
| 1.003 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1 | cum | - | - |
| 1.004 | 60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. | - | metre | - | - |
| 1.005 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | - | hour | - | - |
| 1.006 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - |
| 1.007 | 2.9.3:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Hard rock (blasting prohibited) | - | cum | - | - |
| 1.008 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.2 | cum | - | - |
| 1.009 | 4.2.3:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.8 | cum | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1410791.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
IntegrityPactandFormofTender.pdf
Tender Documents • 0.24 MB
preliminaryagreement.pdf
Tender Documents • 0.24 MB
affidavit.pdf
Tender Documents • 0.02 MB
epayment.pdf
Tender Documents • 0.06 MB
viewsbd.pdf
Tender Documents • 2.27 MB
BOQ_1410791.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .