Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91.0 LAdmitted-Finance NO 1 120 FIRST STREET SANIPOONDI VILLAGE TIRUVANNAMALAI TALUK DISTRICT TAMIL NADU 606 755 | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | 606755 | ₹91.0 L | L1 | Admitted-Finance |
| 2 | L2₹98.6 LAdmitted-Finance | ₹98.6 L | L2 | Admitted-Finance |
| 3 | L3₹1.0 CrAdmitted-Finance | ₹1.0 Cr | L3 | Admitted-Finance |
| 4 | L4₹1.0 CrAdmitted-Finance | ₹1.0 Cr | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Only two quarters GST returns are attached. GST returns for (October to December 2024 and July to September 2025) are not attached and ITR for Assessment year 2025-26 is not attached, hence bid is ineligible. |
| Sl No | Description | Qty | Unit | M/s MSK Construction L1 | M N NAIDU CONSTRUCTIONS L4 | V SURENDRA NAIDU L2 | B SIVA KUMAR L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Careful removal of roof concrete over the terrace of Mandapa’s of the temple. Including disposing the waste away from the monument, cost, conveyance, loading, unloading of all materials, labour charges, GST and all other applicable taxes etc., complete as directed by the site in charge. | 74.08 | Cu.m | 2,100 ₹1.6 L | 3,551 ₹2.6 L | 3,417 ₹2.5 L | 3,517 ₹2.6 L |
| 2.00 | Water tightening the terrace by providing brick jelly lime concrete (1:2:4) (1lime:2 Sand:4 brick aggregate of size 40mm) to an average depth of 30cm with proper camber including ramming, consolidating etc., complete as directed by the site in charge. | 74.08 | Cu.m | 10,743.44 ₹8.0 L | 20,595 ₹15.3 L | 19,818 ₹14.7 L | 20,401.5 ₹15.1 L |
| 3.00 | 20mm thick plastering the top with Lime mortar (1:2) including cost, conveyance, loading, unloading of all materials, labour charges, GST and other applicable taxes etc., complete as directed by the site in charge. | 246.79 | Sq.m | 600 ₹1.5 L | 3,641 ₹9.0 L | 3,503.7 ₹8.6 L | 3,606.75 ₹8.9 L |
| 4.00 | Applying some white/light stone gray colour to the gopuras after thoroughly scraping the surfaces without damaging plaster in two coats after applying the base coat white coat including cost of material, conveyance of all loading, unloading, transportation and stacking charges, labour charges, GST charges etc., complete as directed by the site in charge. | 4,097.88 | Sq.m | 250 ₹10.2 L | 901 ₹36.9 L | 861.6 ₹35.3 L | 892.5 ₹36.6 L |
| 5.00 | Scaffolding using BSL make double scaffolding set for attending restoration works and removing the same after completion of the work including cost, conveyance, loading, unloading of all materials, labour charges, GST and other applicable taxes etc., complete as directed by the site in charge. | 1,356.69 | Sq.m | 600 ₹8.1 L | 636 ₹8.6 L | 612 ₹8.3 L | 630 ₹8.5 L |
| 6.00 | Supply, making and fixing of 1st class teak wood panelled doors to the openings of talas in gopuras including supply of the wood, cutting in to required sizes, fixing, making, cost of aldrops, hinges, tower bolts and nuts and other essential materials etc., complete as directed by the site in charge. | 30.81 | Cu.m | 2,00,000 ₹61.6 L | 98,156 ₹30.2 L | 94,452 ₹29.1 L | 97,230 ₹30.0 L |
Tender Value
₹96.9 L
EMD Value
₹2.4 L
Closing Date
15 Jan 2026, 11:00 amClosed
SA, ASI, Amaravati Circle, Vijayawada
Aurobindo Plaza,6-134/1, Kanuru Main Road, Kanuru, Vijayawada -520007 (A.P.)
As per Tender document
2026_ASI_892303_1
50/NIT/2025-2026/Amaravati/ Kadapa sub Circle
Open Tender
Civil Works
60 days
Vontimitta, ysr kadapa
As per Tender document
3 documents required · 3 mandatory
₹0
₹2.4 L
Yes
23 Jan 2026
2 Jan 2026
16 Jan 2026
2 Jan 2026
15 Jan 2026
2 Jan 2026
Careful removal of roof concrete over the terrace of Mandapa’s of the temple. Including disposing the waste away from the monument, cost, conveyance, loading, unloading of all materials, labour charges, GST and all other applicable taxes etc., complete as directed by the site in charge.
Water tightening the terrace by providing brick jelly lime concrete (1:2:4) (1lime:2 Sand:4 brick aggregate of size 40mm) to an average depth of 30cm with proper camber including ramming, consolidating etc., complete as directed by the site in charge.
20mm thick plastering the top with Lime mortar (1:2) including cost, conveyance, loading, unloading of all materials, labour charges, GST and other applicable taxes etc., complete as directed by the site in charge.
Applying some white/light stone gray colour to the gopuras after thoroughly scraping the surfaces without damaging plaster in two coats after applying the base coat white coat including cost of material, conveyance of all loading, unloading, transportation and stacking charges, labour charges, GST charges etc., complete as directed by the site in charge.
Scaffolding using BSL make double scaffolding set for attending restoration works and removing the same after completion of the work including cost, conveyance, loading, unloading of all materials, labour charges, GST and other applicable taxes etc., complete as directed by the site in charge.
Supply, making and fixing of 1st class teak wood panelled doors to the openings of talas in gopuras including supply of the wood, cutting in to required sizes, fixing, making, cost of aldrops, hinges, tower bolts and nuts and other essential materials etc., complete as directed by the site in charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 15.43 MB
Cover01.pdf
Additional Documents • 7.13 MB
50SignedNIT.pdf
Additional Documents • 15.41 MB
BOQ_937890.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid