Loading…
Loading…
Tender Value
₹4.2 L
EMD Value
₹8,311
Closing Date
29 Aug 2026, 4:00 pm5d left
Executive Engineer
Araksha Bhawan 3rd Floor Block DJ Sector II Salt Lake City
Day-to-day Electrical Maintenance of all types of Internal and External Electrical Installations along with routine Pump Operation and Electrical Maintenance Works of Police Establishments in Malda District for FY 2026-2027. (2nd Call)
2026_WBPHI_5019055_2
WBPHIDCL/EE-(HQ-I)/NIT- 31(e)/2026-2027
Open Tender
ELECTRICAL WORKS M/R
Percentage
Refer to NIT
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹8,311
Yes
18 Aug 2026
18 Aug 2026
31 Aug 2026
18 Aug 2026
29 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Electrical (maintenance works) and operation of pump- motor sets.
Note:All the item of SOR of PWD Electrical works w.e.f 1.11.2017 including up to date addenda , corrigenda and the approved non schedule item of works (including 18% GST & 1% labour cess)
( The work shall continue of the entire contract period as per the requirement & as directed by the Engineer in charge .The payment of the executed work shall be made on the basis of - (A) PWD schedule of rates (B) As per the ANNEXURE - 2023/2 for non-schedule items (C) List of rates proposed by PWD (Sub Committee) on 27/02/2026 for different electrical works.) | - | LOT | 70,000 | - |
| 2 | Day to day Operation of pump- motor sets and Emergent EI Maintenance works:
Supply of manpower for operation of pump motor sets and controlling valves in water supply line to provide uniterrupted water supply with minor electromechanical works and Maintenance of electrical installation as and when required, for a period of 274 days as per direction of EIC. At location
Electrician Cum Pump Operators (Skilled) :-
A) Malda Police Line
Shift Duration :-
(i) 06:00 AM to 02:00 PM
=> 1 no. Electrician-Cum-Pump Operator (Skilled) for Day Shift
(ii) 02:00 PM to 10:00 PM
=> 1 no. Electrician-Cum-Pump Operator (Skilled) for Evening Shift
Therefore, Operation Shift = (2x274x1 ) = 548 ** { Shift x Days x Man Power}
Total = 548 Shifts is to be provided by the agency ( Minimum tools and tackles should be provided by the agency.
( RATES ARE INCLUDING 10 % AGENCY PROFIT ,18% GST & 1% LABOUR CESS)
Basic rate is taken from Office of the Labour Commissioner,WB Dated 17/06/2025. | - | PerShiftPerElectricianCumPumpOperator | 630.58 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
Tendernotice_2.pdf
PDF • 0.41 MB
Tendernotice_3.pdf
PDF • 0.91 MB
BOQ_5090768.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].