Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.3 LAccepted-AOC | ₹31.3 L Quoted ₹31.7 L | L1 | Accepted-AOC Being lowest bidder |
| 2 | L2₹32.6 L+₹92,552 (2.92%)Rejected-Finance NEW HARIGAON BEHIND BASE HOSP PO NIKAMUL TEZPUR ASSAM 784001 | SONITPUR | ASSAM | 784001 | ₹32.6 L+₹92,552 (2.92%) | L2 | Rejected-Finance Not being lowest bidder |
| 3 | L3₹32.9 L+₹1.2 L (3.70%)Rejected-Finance BAMPARBOTIA WARD P O P S TEZPUR DIST SONITPUR PIN 784001 | SONITPUR | ASSAM | 784001 | ₹32.9 L+₹1.2 L (3.70%) | L3 | Rejected-Finance Not being lowest bidder |
| 4 | L4₹33.8 L+₹2.1 L (6.56%)Rejected-Finance VILLAGE GOROIMARI PO SHALONIBAIR DIST SONITPUR ASSAM PIN 784104 | SONITPUR | ASSAM | 784104 | ₹33.8 L+₹2.1 L (6.56%) | L4 | Rejected-Finance Not being lowest bidder |
| 5 | L5₹35.9 L+₹4.2 L (13.3%)Rejected-Finance | ₹35.9 L+₹4.2 L (13.3%) | L5 | Rejected-Finance Not being lowest bidder |
| Sl No | Description | Qty | Unit | M/S Singh Furniture Mart L2 | Chinmay Traders L1 | MAHENDRA BARUAH L4 | M/S KAUSHICK CONSTRUCTION L5 | M/S SAIKIA ENTERPRISE L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down Chowkat or Frame with shutters (without taking off Shutter from the Frame) n exc. 1.50 Sqm complete all as specified and as directed. | 30 | Each | 30 ₹900 Lowest | 60 ₹1,800 | 210 ₹6,300 | 100 ₹3,000 | 247 ₹7,410 |
| 2.00 | Taking down Chowkat or Frame with shutters (without taking off Shutter from the Frame) exc. 1.50 Sqm but not exc. 4.00 Sqm Each, complete all as specified and as directed. | 25 | Each | 30 ₹750 Lowest | 80 ₹2,000 | 260 ₹6,500 | 220 ₹5,500 | 311 ₹7,775 |
| 3.00 | Taking down Shutters of any description, exc. 1.00 Sqm but not exc 2.00 Sqm Each and keep in Safe Custody for removing to store, complete all as specified and as directed. | 35 | Per Leaf | 40 ₹1,400 Lowest | 50 ₹1,750 | 80 ₹2,800 | 60 ₹2,100 | 79 ₹2,765 |
| 4.00 | Taking down Shutters of any description, not exc 1.00 Sqm Each, and keep in Safe Custody for removing to store, complete all as specified and as directed. | 30 | Per Leaf | 20 ₹600 Lowest | 35 ₹1,050 | 60 ₹1,800 | 100 ₹3,000 | 39 ₹1,170 |
| 5.00 | Taking down and Refixing Shutters of any description exc. 1.00 Sqm and not exc. 2.00 Sqm Each in the Same Opening after easing and adjusting complete all as specified and as directed. | 35 | Per Leaf | 190 ₹6,650 | 100 ₹3,500 Lowest | 310 ₹10,850 | 100 ₹3,500 Lowest | 173 ₹6,055 |
| 6.00 | Taking down and Refixing Shutters of any description n exc. 1.00 Sqm Each in the Same Opening after easing and adjusting complete all as specified and as directed. | 15 | Per Leaf | 180 ₹2,700 | 100 ₹1,500 Lowest | 120 ₹1,800 | 100 ₹1,500 Lowest | 121 ₹1,815 |
| 7.00 | S&F composite 100% solid wood plastic complete (single extended process) material with density not less than 780 kg/cum and plastic wood as in chowkhat complete all as per manufacturer instruction all as specified and directed. | 1.2 | Cum | 1,55,000 ₹1,86,000 | 13,000 ₹15,600 Lowest | 1,30,000 ₹1,56,000 | 1,30,000 ₹1,56,000 | 1,04,000 ₹1,24,800 |
| 8.00 | M&L Cement Concrete Type B0 (1:2:4) (12.5 mm graded crushed stone aggregate) in lintels upto 1.5m clear span, cills, steps; seismic and other similar bands,plinth courses, string courses, lacing courses, parapets and railings upto 60 cm in height, copings, kneelers, apex stones, bed plates, kerbs, water troughs and the like including
weathering, slightly rounded or chamfered angles and throating complete all as specified and directed. | 1 | Cum | 7,000 ₹7,000 | 5,000 ₹5,000 Lowest | 9,100 ₹9,100 | 6,000 ₹6,000 | 8,091 ₹8,091 |
| 9.00 | S&F Second Class Hardwood Plain, Solid, Straight Chowkats and Frames, Wrought, Framed rebated on the Solid, Rounded or Chamfered, put together with Glue, Pinned at Joints, complete all as specified and as directed. | 0.6 | Cum | 36,000 ₹21,600 | 50,000 ₹30,000 | 9,000 ₹5,400 Lowest | 80,000 ₹48,000 | 75,493 ₹45,295.8 |
| 10.00 | M&L 2nd class HW in scantling fixed clean swan in framed including fixing MS Cleats & nuts work/Unframed wk including fixing MS Cleats & nuts including dismantling, complete all as specified and directed. | 0.5 | Cum | 39,000 ₹19,500 Lowest | 60,000 ₹30,000 | 90,000 ₹45,000 | 80,000 ₹40,000 | 85,979 ₹42,989.5 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
24 Sept 2025, 6:00 pmClosed
GE South Tezpur
GE South Tezpur Mission Chariali
REPAIR/REPLACEMENT OF ROOF TREATMENT, WATER PROOFING, SUNKEN SLAB, TOILET SHAFT AND CERTAIN B/R REPAIRS AT ZONE -2, ZONE-3 AND ZONE-4 UNDER GE (S) TEZPUR
2025_MES_728091_1
9064
Open Tender
Civil Works
Item Rate
210 days
GE South Tezpur
as per NIT
4 documents required · 4 mandatory
₹500
GE South Tezpur
₹80,000
Yes
20 Nov 2025
27 Aug 2025
26 Sept 2025
27 Aug 2025
24 Sept 2025
11 Sept 2025
27 Aug 2025 - 4 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .