| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAccepted-Finance | ₹11.7 L | L1 | Accepted-Finance L1 |
| Sl No | Description | Qty | Unit | S SUNDARESAN L1 |
|---|---|---|---|---|
| 1.00POND | ||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 10 | hour | 326.02 ₹3,260.2 Lowest |
| 1.00 | OD151176/2025-2026:BAILING OUT WATER BY ENGAGING COOLIE - Bailing out water by engaging coolie where ever necessary where pumping with engine and pump set not possible | 6 | Day | 1,021.04 ₹6,126.24 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 18.72 | cum | 7,484.77 ₹1,40,129.86 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 18.72 | cum | 8,714.25 ₹1,63,148.19 Lowest |
| 1.00 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 17.34 | cum | 9,209.44 ₹1,59,728.53 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 173.45 | sqm | 364.35 ₹63,195.78 Lowest |
| 1.01 | 11.20.2:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Medium shade pigment using 50% white cement 50 % Grey cement | 230.03 | sqm | 1,372.47 ₹3,15,712.02 Lowest |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 630 | kg | 168.35 ₹1,06,060.5 Lowest |
| 2.00WELL | ||||
Tender Value
₹12.7 L
EMD Value
₹31,774
Closing Date
22 Jun 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer Thiruvananthapuram District Panchayat
Buildings
2026_LSGD_854509_1
4a(2)/EE/LSGD/TVM/2026-27
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thiruvananthapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹31,774
Yes
7 Jul 2026
15 Jun 2026
24 Jun 2026
15 Jun 2026
22 Jun 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1POND | |||||
| 1.001 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | - | - |
| 1.002 | OD151176/2025-2026:BAILING OUT WATER BY ENGAGING COOLIE - Bailing out water by engaging coolie where ever necessary where pumping with engine and pump set not possible | - | Day | - | - |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.004 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.006 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 0.2 | sqm | - | - |
| 1.007 | 11.20.2:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Medium shade pigment using 50% white cement 50 % Grey cement | 0.8 | sqm | - | - |
| 1.008 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | - | kg | - | - |
| 2WELL | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1444611.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1444611.xls
BOQ • 0.31 MB
officeSBD.pdf
Tender Documents • 2.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .