| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC | ₹2.9 Cr | L1 | Accepted-AOC 1st Lowest Bidder |
| 2 | L2₹3.2 Cr+₹30.2 L (10.5%)Rejected-Finance AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | ₹3.2 Cr+₹30.2 L (10.5%) | L2 | Rejected-Finance 2nd Lowest Bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per decision of tender evaluation committee. |
| 4 | Rejected-Technical | - | - | Rejected-Technical As per decision of tender evaluation committee. |
| 5 | Rejected-Technical | - | - | Rejected-Technical As per decision of tender evaluation committee. |
Tender Value
₹2.7 Cr
EMD Value
₹2.7 L
Closing Date
26 Feb 2026, 4:00 pmClosed
Circle Officer
Circle Office Keonjhar
Repair and renovation of the old Circuit House in the premises of Circuit House in the District of Keonjhar as per Revenue and DM Deptt. Lr. No. 45495 dt. 02.12.2025 Buildings.
2026_EICCL_126011_1
CCEKC20.
Open Tender
Civil Works - Buildings
Percentage
210 days
Keonjhar
4 documents required · 4 mandatory
₹10,000
₹2.7 L
Yes
O/o CCEKC Keonjhar
1 Sept 2026
13 Feb 2026
27 Feb 2026
13 Feb 2026
26 Feb 2026
13 Feb 2026
13 Feb 2026 - 18 Feb 2026
18 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS (PART-I)
Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
a) Ground Floor | 211.15 | sqm | 5.12 | ₹1,081.09 |
| 2 | b) 1st Floor | 702.42 | sqm | 7.01 | ₹4,923.96 |
| 3 | Dismantling and removing old tiles flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris within 50m lead complete including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
a) Ground Floor | 436.12 | sqm | 144.25 | ₹62,910.31 |
| 4 | b) 1st Floor | 455.98 | sqm | 149.96 | ₹68,378.76 |
| 5 | Dismantling and removing R.C.C. Colums, Beams, Slab, staircase, landing, lintels including stacking the useful materials for reuse and removing the debris within 50m lead etc.as per direction of Engineer-in-charge. complete including cost, conveyance, taxes, cess, royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
a) Ground Floor | 4.56 | cum | 1,696.95 | ₹7,738.09 |
| 6 | b) 1st Floor | 2.78 | cum | 1,764.16 | ₹4,904.36 |
| 7 | Dismantling double Nuria tileroofing (Tiles only) including stacking the useful materials for reuse and removing the debris within 50m lead complete including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
a) 1st Floor | 665.81 | sqm | 254.94 | ₹1,69,741.6 |
| 8 | Dismantling Wood Work wrought framed and fixed in frames of trusses upto a height of 5 m above plinth level including T&P and scaffolding wherever necessary, sorting the dismantled materials, disposal of unserviceable materials and stacking the serviceable material with all lifts and lead of 1000 metres complete including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
a) 1st Floor | 58.37 | cum | 1,507.85 | ₹88,013.2 |
| 9 | Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris within 50m lead etc. complete including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
a) Ground Floor | 124.66 | sqm | 455.75 | ₹56,813.8 |
| 10 | b) 1st Floor | 53.15 | sqm | 473.8 | ₹25,182.47 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.51 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_581177.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .