Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹66.0 LAdmitted-Fee/PreQual/Technical/Finance CHHEND ROURKELA | KENDRAPARA | ODISHA | 754217 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹68.1 L+₹2.1 L (3.20%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹68.2 L
EMD Value
₹68,212
Closing Date
30 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER,L.I.DIVISION,ROURKELA
O/O EXECUTIVE ENGINEER,L.I.DIVISION,ROURKELA
Lift Irrigation Division,Raurkela Works
2026_OLIC_144120_1
EEOLICRKL-6/2026-27
Open Tender
Civil Works - Lift Irrigation Schemes
Percentage
120 days
ROURKELA
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹68,212
Yes
3 Nov 2026
23 Oct 2026
31 Oct 2026
23 Oct 2026
30 Oct 2026
23 Oct 2026
23 Oct 2026 - 27 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | JAMIRDIHI-I | - | - | - | - |
| 2 | Earth work on excavation of foundation in hard soil within 50m initial lead & 1.5 m initial lift including dressing and leveling the bed & depositing the excavated materials within above lead & lift. | 76.23 | 100 cum | 27,689.23 | ₹21,10,666.94 |
| 3 | Earthwork in excavation of foundation in hard soil such as Hard stiff clay, stiff black cotton, hard red earth, shales, moorum ordinary gravels etc within 50m.Initial lead and 1.5m. Initial lift including rough dressing and levelling the bed and depositing the excavated materials within initial lead at nearby the worksite for reuse including breaking clods and stacking rubble for spreading and leveling as the case may be etc complete as per direction of the Engineer-in-charge. | 1,121.94 | 100 cum | 12,840.99 | ₹1,44,06,820.32 |
| 4 | Filling in F&P with sand wall watered and rammed. | 15.03 | cum | 852.48 | ₹12,815.33 |
| 5 | C.C. (1:4:8) with 4cm size of h.g. metal. | 6.4 | cum | 6,611.77 | ₹42,308.72 |
| 6 | Fly Ash. Brick masonary in cm (1:6) in foundation and plinth 25cm x 12cm x 8cm size | 12.26 | cum | 6,105.65 | ₹74,830.85 |
| 7 | Filling in F&P with excavated materials. | 76.23 | 100 cum | 15,915.65 | ₹12,13,202.25 |
| 8 | Fly Ash Brick masonary in cm (1:6) in supper structure. | 7.8 | cum | 6,235.03 | ₹48,627 |
| 9 | 12mm thick cement plaster over brick works.(1:6) | 214.91 | Sqm | 206.58 | ₹44,395.07 |
| 10 | 20mm (¾") thick C.P. (1:6) over F&P works. | 9.16 | Sqm | 311.63 | ₹2,853.28 |
stage.html
html • 0.02 MB
finance_615134.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.70 MB
Tendernotice_2.pdf
PDF • 0.92 MB
BOQ_615134.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .