| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Quoted L1 rate |
| 2 | L2₹1.1 Cr+₹1.8 L (1.74%)Rejected-AOC | ₹1.1 Cr+₹1.8 L (1.74%) | L2 | Rejected-AOC Quoted L2 rate |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
27 Oct 2023, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Strengthening of 1 road in Vaiyampatti Block in Tiruchirapplli District under NABARD RIDF XXIX 2023-24 Package No.1
2023_RDTN_378314_1
DIPR/5562/TENDER/2023 Dated 12.10.2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.1 L
DRDA Tiruchirappalli
8 Nov 2023
14 Oct 2023
27 Oct 2023
14 Oct 2023
27 Oct 2023
14 Oct 2023
19 Oct 2023
Amount
Strengthening the road in Seegampatti to Pudhuvadipudhur in Nadupatti Panchayat. KM 0/0 - 2/0(Rcode R-257) Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A KM 0/0 - 2/0
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for side berms KM 0/0-2/0
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0 - 2/0
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it. KM 0/0 - 2/0
Providing and laying Tack coat over WMM/WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., KM 0/0 - 2/0
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., i charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 KM 0/0- 2/420
Supplying and fixing Name board Logo Board including painting and lettering as directed by the departmental officers etc., complete
Cautionary Sign Board
60 Cm Equilateral Triangle Cautionary SignBoard
60 Cm Circle Mandatory Sign
Chevron Sign 90 Cm Octogon (Curves)
Reflector (Near Culvert & Trees) - Star Sign Sticker
Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete
Supplying and fixing Kilometer Metre stones including painting and lettering as directed by the departmental officers etc., complete
Road Marker/ Road Stud With Lens Reflector
Road marking by providing and layimg of hot thermoplastic compound 2.5mm thick including reflectorising glass beads at 250gms per sqm area, thickness of 2.5mm exclusinve of surface applied galss beads as per IRC:35. The finished surface to be level, uniform free from streaks.
Construction of Causeway @ Ch 1030 Earth work excavation and deposting on bank with initial lead and lift in all clauses of soil except hard rock requiring blasting as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8-using 40mm iss hbgs including cost and conveyance of all materials and labour charges etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
CC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site excluding cost and labour charges for laying mixing concrete curing compacting for labour with centering arrangement all includingcharges etc., completefor Bed Block
CC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site excluding cost and labour charges for laying mixing concrete curing compacting for labour with centering arrangement all includingcharges etc., completefor Bed Block
Supplying & fabrication of steel for RCC works including cost and conveyance of steel to site including labour charges for cutting bending and tying rods and placing the grills in position for premeasurement asper steel schedule.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.Deck Slab
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.Side
Providing weepholes arrangements
Providing Bitumen pad
Earth work excavation and deposting on bank with initial lead and lift in all clauses of soil except hard rock requiring blasting as per SS 20B
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Cement concrete 1:4:8-using 40mm iss HBG including cost and conveyance of all materials and labour charges etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501..
Bitumen Pad
Towards the charges for routline maintenance of the road work executed under NABARD XXIX including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
N PERUMAL
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .