| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.7 LAccepted-AOC | ₹15.7 L Quoted ₹15.9 L | L1 | Accepted-AOC Lowest bidder and quoted reasonable rates |
| 2 | L2₹16.0 L+₹11,862.50 (0.75%)Rejected-Finance BIAMATHANG BAROO KARGIL J K | KARGIL | KARGIL | J K | ₹16.0 L+₹11,862.50 (0.75%) | L2 | Rejected-Finance Other than lowest bidder |
| 3 | L3₹16.2 L+₹37,876.25 (2.39%)Rejected-Finance | ₹16.2 L+₹37,876.25 (2.39%) | L3 | Rejected-Finance Other than lowest bidder |
| 4 | L4₹16.4 L+₹56,615.50 (3.57%)Rejected-Finance | ₹16.4 L+₹56,615.50 (3.57%) | L4 | Rejected-Finance Other than lowest bidder |
| 5 | L5₹16.5 L+₹61,823 (3.90%)Rejected-Finance | ₹16.5 L+₹61,823 (3.90%) | L5 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | M/S MOHD KHAN L2 | M/S Hussani Enterprises Kargil L7 | M/S ABBAS ENTERPRISES L1 | M/S M/S MOHD AMIN MUNTAZIR L6 | Ms/ ladakh technical services L4 | M/S Ghulam Mustafa L8 | M/S MOHAMMAD ALI L5 | M/S M A ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of PCC (un-reinforced) in ground floors & pavings n.exc 15cm thick below or above ground level, complete all as specified and directed by Engr-in-Charge. | 22.25 | Cum | 400 ₹8,900 Lowest | 530 ₹11,792.5 | 500 ₹11,125 | 520 ₹11,570 | 510 ₹11,347.5 | 550 ₹12,237.5 | 500 ₹11,125 | 505 ₹11,236.25 |
| 2.00 | M&L for 75mm thick PCC type D-2, 1:4:8 (using 40mm graded stone aggregate) as in sub base, Paving or similar works with surface finished even and rough to receive floor topping complete all as specified and directed by Engr-in-Charge. | 220 | Sqm | 450 ₹99,000 | 460 ₹1,01,200 | 400 ₹88,000 Lowest | 450 ₹99,000 | 415 ₹91,300 | 470 ₹1,03,400 | 410 ₹90,200 | 410 ₹90,200 |
| 3.00 | M&L for 25mm thick PCC type B-0 (12.5mm graded stone aggregate) 1:2:4 as in floor or similar works complete all as specified and directed by Engr-in-Charge. | 230 | Sqm | 360 ₹82,800 | 420 ₹96,600 | 350 ₹80,500 Lowest | 400 ₹92,000 | 355 ₹81,650 | 430 ₹98,900 | 360 ₹82,800 | 360 ₹82,800 |
| 4.00 | Demolition of stone slabs and tiles of any description or thickness in floors, aprons etc. laid, bedded and pointed in any mortar complete all as specified and directed by Engr-in-Charge. | 23 | 10 Sqm | 200 ₹4,600 Lowest | 350 ₹8,050 | 250 ₹5,750 | 300 ₹6,900 | 260 ₹5,980 | 360 ₹8,280 | 300 ₹6,900 | 260 ₹5,980 |
| 5.00 | Dismantling of Stone sett paving of any description or thickness in floors, aprons etc. laid in any morter or laid dry and pointed complete all as specified and directed by Engr-in-charge. | 22 | 10 Sqm | 200 ₹4,400 Lowest | 350 ₹7,700 | 250 ₹5,500 | 300 ₹6,600 | 255 ₹5,610 | 360 ₹7,920 | 300 ₹6,600 | 260 ₹5,720 |
| 6.00 | M&L for chequered cement concrete tiles 300x300x25mm thick laid with grey cement and pigment and set jointed and pointed in neat cement slurry as in floor over 20 mm thick sreed bed or bedding layer in CM 1:4 complete all as specified and directed by Engr-in-charge.
Make :- Jullay, Ladakh, Ultra. | 160 | Sqm | 1,550 ₹2,48,000 | 1,800 ₹2,88,000 | 1,500 ₹2,40,000 Lowest | 1,700 ₹2,72,000 | 1,570 ₹2,51,200 | 1,900 ₹3,04,000 | 1,550 ₹2,48,000 | 1,600 ₹2,56,000 |
| 7.00 | M&L for machine pressed precast concrete interlocking paver block any shape and size conforming to IS 15658-2006 of 60 mm thickness, M-35 Grade laid with grey cement and pigment over 25mm thick sand cushion complete all as specified and directed .
(Note- Sand cushion measured and paid seperately)
Make : Jullay, Ladakh, Ultra. | 220 | Sqm | 1,680 ₹3,69,600 | 1,800 ₹3,96,000 | 1,650 ₹3,63,000 Lowest | 1,750 ₹3,85,000 | 1,750 ₹3,85,000 | 1,900 ₹4,18,000 | 1,700 ₹3,74,000 | 1,700 ₹3,74,000 |
| 8.00 | All as per Srl Item No.07 above but except interlocking blocks complete all as specified and directed by Engr-in-charge. | 150 | Sqm | 450 ₹67,500 Lowest | 550 ₹82,500 | 450 ₹67,500 Lowest | 500 ₹75,000 | 460 ₹69,000 | 560 ₹84,000 | 470 ₹70,500 | 500 ₹75,000 |
| 9.00 | M&L for Sand filling under floors or in foundation including watering and consolidation in layer complete all as specified and directed by Engr-in-charge. | 9.25 | Cum | 1,150 ₹10,637.5 | 1,250 ₹11,562.5 | 1,100 ₹10,175 Lowest | 1,200 ₹11,100 | 1,200 ₹11,100 | 1,300 ₹12,025 | 1,200 ₹11,100 | 1,200 ₹11,100 |
| 10.00 | M&L for endura tiles, heavy duty type of size 300x300x10 mm thick, non skid, acid and scratch resistance laid over 15mm thick screed bed in CM 1:4 as in floor, jointed in neat cement slurry and pointed with white cement and pigment to match the shade complete all as specified and directed by Engr-in-charge. | 70 | Sqm | 2,150 ₹1,50,500 | 2,200 ₹1,54,000 | 2,100 ₹1,47,000 Lowest | 2,150 ₹1,50,500 | 2,150 ₹1,50,500 | 2,250 ₹1,57,500 | 2,200 ₹1,54,000 | 2,200 ₹1,54,000 |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
29 Apr 2026, 6:00 pmClosed
Garrison Engineer Kargil
Office of GE Kargil, Pin -908121, C/o 56 APO
CA NO. GE/K-94/2025-26 - REPAIR/ MAINT OF HARDSTANDING, PATHS, DRAINS AND ALLIED WORKS IN VARIOUS UNITS AT ZONE-A, DRAS UNDER GE KARGIL
2026_MES_759483_1
CA NO. GE/K-94/2025-26
Open Tender
Civil Works
Item Rate
180 days
Drass
Please Refer Tender Documents
9 documents required · 9 mandatory
₹500
GE Kargil
₹30,000
13 Jun 2026
8 Apr 2026
30 Apr 2026
8 Apr 2026
29 Apr 2026
22 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Demolition of PCC (un-reinforced) in ground floors & pavings n.exc 15cm thick below or above ground level, complete all as specified and directed by Engr-in-Charge. | - | Cum | - | - |
| - | M&L for 75mm thick PCC type D-2, 1:4:8 (using 40mm graded stone aggregate) as in sub base, Paving or similar works with surface finished even and rough to receive floor topping complete all as specified and directed by Engr-in-Charge. | - | Sqm | - | - |
| - | M&L for 25mm thick PCC type B-0 (12.5mm graded stone aggregate) 1:2:4 as in floor or similar works complete all as specified and directed by Engr-in-Charge. | - | Sqm | - | - |
| - | Demolition of stone slabs and tiles of any description or thickness in floors, aprons etc. laid, bedded and pointed in any mortar complete all as specified and directed by Engr-in-Charge. | - | 10 Sqm | - | - |
| - | Dismantling of Stone sett paving of any description or thickness in floors, aprons etc. laid in any morter or laid dry and pointed complete all as specified and directed by Engr-in-charge. | - | 10 Sqm | - | - |
| - | M&L for chequered cement concrete tiles 300x300x25mm thick laid with grey cement and pigment and set jointed and pointed in neat cement slurry as in floor over 20 mm thick sreed bed or bedding layer in CM 1:4 complete all as specified and directed by Engr-in-charge.
Make :- Jullay, Ladakh, Ultra. | - | Sqm | - | - |
| - | M&L for machine pressed precast concrete interlocking paver block any shape and size conforming to IS 15658-2006 of 60 mm thickness, M-35 Grade laid with grey cement and pigment over 25mm thick sand cushion complete all as specified and directed .
(Note- Sand cushion measured and paid seperately)
Make : Jullay, Ladakh, Ultra. | - | Sqm | - | - |
| - | All as per Srl Item No.07 above but except interlocking blocks complete all as specified and directed by Engr-in-charge. | - | Sqm | - | - |
| - | M&L for Sand filling under floors or in foundation including watering and consolidation in layer complete all as specified and directed by Engr-in-charge. | - | Cum | - | - |
| - | M&L for endura tiles, heavy duty type of size 300x300x10 mm thick, non skid, acid and scratch resistance laid over 15mm thick screed bed in CM 1:4 as in floor, jointed in neat cement slurry and pointed with white cement and pigment to match the shade complete all as specified and directed by Engr-in-charge. | - | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tender942526.pdf
Tender Documents • 1.14 MB
BOQ_850688.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .