Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.6 LAccepted-AOC | L1 | Accepted-AOC agreement excicuted | |
| 2 | L2₹29.6 L+₹765.27 (0.03%)Rejected-AOC | L2 | Rejected-AOC second lowest |
| Sl No | Description | Qty | Unit | G.Ashokan L1 | Vijayakumar.V L2 |
|---|---|---|---|---|---|
| 1.00POND RENNOVATION | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 375 | cum | 263 ₹98,625 Lowest | 263 ₹98,625 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 51 | cum | 367 ₹18,717 Lowest | 367 ₹18,717 Lowest |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 200 | hour | 353 ₹70,600 Lowest | 353 ₹70,600 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.1 | cum | 9,441 ₹48,149.1 Lowest | 9,441 ₹48,149.1 Lowest |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 79.5 | cum | 8,528 ₹6,77,976 Lowest | 8,528.9 ₹6,78,047.55 |
| 1.01 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 69 | sqm | 858 ₹59,202 Lowest | 858 ₹59,202 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 13.43 | cum | 10,721 ₹1,44,015.19 Lowest | 10,721.8 ₹1,44,025.94 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,500 | kilogram | 114.92 ₹1,72,380 | 114.9 ₹1,72,350 Lowest |
| 2.00BUILDING CONSTRUCTION | |||||
Tender Value
₹29.7 L
EMD Value
₹50,000
Closing Date
8 Sept 2025, 5:00 pmClosed
JOSE H JONES
The Assistant Executive Engineer, LID AND EW Section ,Thiruvananthapuram Corporation, Ulloor zonal office
Project No- 142/25-26-Construction of Samskarika Kendram Park Renovation Side Protection Madan Nada EE Manoharatheeram Pond in Kulathur Ward
2025_LSGD_792924_3
AEE/KZTM/DB/T13/2025-26
Open Tender
Civil Works - Others
Item Rate
180 days
Kulathur Ward
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,500
Yes
₹50,000
Yes
10 Nov 2025
30 Aug 2025
10 Sept 2025
30 Aug 2025
8 Sept 2025
30 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1308937.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .