Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1Accepted-AOC | 1 | Accepted-AOC agreement executed |
Tender Value
₹57.6 L
EMD Value
₹50,000
Closing Date
23 Oct 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
O/o Executive Engineer,HEDivision,TVPM,Vizhinjam
Land protection work
2020_HED_377701_3
11/EE/2020-21/S
Open Tender
Civil Works - Others
Item Rate
210 days
Muthalapozy FH
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,290
Yes
online
₹50,000
Yes
21 Jun 2021
14 Oct 2020
28 Oct 2020
14 Oct 2020
23 Oct 2020
14 Oct 2020
60 days
Amount
protection work
od3179/2020_2021 : Dismantling and packing rubble under water including labour charges etc. complete .
od1525/2020_2021 : :Providing a bed layer below the concrete block using a mix of 40mm and 20mm nominal<br>size metal (50:50)<br>
od4513/2020_2021 : :Supplying and laying woven synthetic geotextile of grade 120 gsm, AOS 0.05mm and<br>dynamic puncture resistance 5mm over the side and bed of lake - It has to be laid 2m below the water level.<br>The work has to be executed as per the instruction of the officer in charge of site<br>
od1432/2020_2021 : Casting of Cement Blocks using graded metal 40%of 75mm to 40mm,30%of 40mm to<br>20mm, 30%of 20mm to 6mm, using average 380kg of cement per m3 as per approved mix design of mix<br>proportion 05:1:1.46:3.22 by weight of water cement,fine aggregate,coarse aggregate(specific gravity of fine<br>aggregate and coarse aggregate should not be less than 2.73 and 2.5 respectively) and the cement shall be<br>of 43 grade or higher minimum cube strength requirement 1) @ 7 day 20N/mm2 (2)@28 day 30N/mm2 and<br>min density of concrete 2.5 gm /cc as per the directions of departmental officers at site.<br>(Based on item 65.94)<br>
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
od1420/2020_2021 : Placing concrete block in layers as directed by deptl officer at site
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
16.78.1 : Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With Material conforming to Grade - I ( size range 75 mm to 0.075 mm) having CBR Value- 30
15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
15.9.2 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
13.46.1 : Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
od4512/2020_2021 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position excluding priming coat of approved steel primer all complete.(based on 10.1)
13.52.1 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
od4419/2020_2021 : DRY RUBBLE MASONRY with departmentally supplied Rubble without levelling course including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
7.2.1 : Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand)
Bidder Name
THE BUILDING CONSULTANT AND TECHNOLOGICAL SERVICE COOPERATIVE SOCIETY LTD T 1054
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_557135.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .