Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.6 CrAdmitted-Finance 10 12 1 REDNAM GARDENS OPPOSITE STATE BANK OF INDIA VISAKHAPATNAM ANDHRA PRADESH 530002 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530002 | L1 | Admitted-Finance | ||
| 2 | L2₹37.0 Cr+₹4.4 Cr (13.4%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹37.7 Cr+₹5.1 Cr (15.6%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical | - | Rejected-Technical The confirmation of the experience certificates submitted by the firm is not received from the client M/s. Emjay Constructions even after reminders. Hence, disqualified. |
Tender Value
₹34.3 Cr
EMD Value
₹35.3 L
Closing Date
25 Nov 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer, VPA, VSP
Chief Engineer office, III floor, AOB, VPA, VSP A.P, India Ph 0891-2873353, 0891-2873332,0891-2873338
Construction of fishing jetties 2 Nos and wharf in between the existing finger jetties
2024_VPT_210698_1
IENG/CP/EE(F.H)/T/56 Dt. 08.10.2024
Open Tender
Civil Works
Percentage
420 days
VPA
As per NIT
3 documents required · 3 mandatory
₹1,770
Yes
₹35.3 L
Yes
Chief Engineer office, III floor, AOB, VPA, VSP
29 Jan 2025
8 Oct 2024
26 Nov 2024
8 Oct 2024
25 Nov 2024
28 Oct 2024
18 Oct 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Setting up the piling gantry and connected equipment / Setting up of pile equipment and connected equipment over each pile location, including cost of shifting, cost of all materials for piling gantry, labour, setting up the rig to alignment and correct dimensions as shown in the drawing and as directed by the EIC. | 360 | Each | 93,042.6 | ₹3,34,95,336 |
| 2 | Providing and fabricating M.S.liners of 6mm thickness for required length with M.S. shoes of 1.0m height using 12mm thick M.S. plates for 800mm dia bored vertical pile measured from cut off level of pile to the terminating level including supplying, cutting, rolling, bending, handling and welding cost, labours, materials, accessories,all taxes, hire and running charges of all machineries, royality, VAT, labour, material, T&P, conveyance charges, Port entry fees etc. all complete as per drawings and specification and also removing of existing boulders, debris, steel, rocks etc., as required and as directed by Engineer-In-charge. | 748.76 | 1MT | 69,615 | ₹5,21,24,927.4 |
| 3 | Boring through all types of soils. incl soft rock for 800mm Dia vertical bored piles from the existing ground level to the level as per drawing, including bailing, flushing the bore bentonite with required density, chiselling, shifting of materials etc.. complete and also removing of existing boulders, debris, steel, rocks etc., as required and as directed by Engineer-In-charge. | 4,320 | Rm | 2,965.2 | ₹1,28,09,664 |
| 4 | Boring through all types of boulders, hard starta and rocks etc.. for 800mm Dia vertical bored piles from and to the level as per drawing, including bailing, flushing the bore bentonite with required density, chiselling, shifting of materials etc.. complete and also removing of existing boulders, debris, steel, rocks etc., as required and as directed by Engineer-In-charge. | 1,080 | Rm | 8,762.25 | ₹94,63,230 |
| 5 | Chipping/Breaking using suitable tools and equipments the top of pile concrete up to the receipt of dense concrete and dressing the pile head suitably so as to receive the form work for deck work , including breaking to the required level exposing the pile reinforcement to sufficient length as per approved drawing for embedding into the coping beam etc. including removal of concrete debris from the site, supply of all labour, material, transportation cost, hire and running charges of all machineries complete for 800mm dia piles as directed by the Engineer-In-Charge. | 360 | No's | 7,140 | ₹25,70,400 |
| 6 | Providing and laying reinforced tremie concrete in mix M40 for pile excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge. | 3,009 | m3 | 12,328 | ₹3,70,94,952 |
| 7 | Providing and laying reinforced cement concrete in concrete mix M40 for Precast Pile muff excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge. | 76 | m3 | 12,328 | ₹9,36,928 |
| 8 | Providing and laying reinforced cement concrete in concrete mix M40 for Precast Beams excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge. | 1,546 | m3 | 12,328 | ₹1,90,59,088 |
| 9 | Providing and laying reinforced cement concrete in concrete mix M40 for Cast-in-situ Beams excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge. | 354 | m3 | 12,032 | ₹42,59,328 |
| 10 | Providing and laying reinforced cement concrete in concrete mix M40 for Cast-in-situ Slabs excluding cost of steel reinforcements in position as per approved drawing and as directed by the Engineer-In-Charge including shuttering, mixing, laying, consolidating, curing, including all labours, slings, shackles, supply of all labour, material, transportation cost, hire and running charges of all machineries such as cranes, lorries etc., complete as directed by the Engineer-In-Charge. | 654.65 | m3 | 12,032 | ₹78,76,748.8 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 5.30 MB
Tendernotice_2.pdf
PDF • 9.07 MB
BOQ_230765.xls
BOQ • 0.33 MB
BOQ.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .