Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.0 LAccepted-AOC C O NIDHI MEDICAL STORE LAKKAR BAZAR SHIMLA 01 | SHIMLA | HIMACHAL PRADESH | 171001 | ₹2.0 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹2.0 LRejected-Finance VILL BHATERH PO SAINTHAL TEHSIL JOGINDERNAGAR DISTT MANDI H P | MANDI | HIMACHAL PRADESH | 175001 | ₹2.0 L | L-2 | Rejected-Finance 2 |
| 3 | L-3₹2.0 LRejected-Finance A CLASS GOVT ELECTRICAL CONTRACTOR VILLAGE CHOWKI PO TRAMAT TEHSIL JOGINDER NAGAR DISTT MANDI HP | MANDI | HIMACHAL PRADESH | 175001 | ₹2.0 L | L-3 | Rejected-Finance 3 |
Updated dates
Tender Value
₹2.0 L
EMD Value
₹1,980
Closing Date
4 Apr 2026, 11:30 amClosed
Er. Puran Chand
Sr. Executive Engineer, Electrical Division, HPSEBL, Joginder Nagar
Tender for providing SOP to Drip Irrigation Scheme at Shiva Project Dhelu in (E) Section Ladruhin under Electrical Sub- Division, HPSEBL, Chauntra.
2026_HPSEB_132244_1
JED-150/2025-26
Open Tender
Electrical Works
60 days
Joginder Nagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
₹1,980
Yes
8 Apr 2026
23 Mar 2026
4 Apr 2026
23 Mar 2026
4 Apr 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1"Erection Part LT":- Erection of Steel Tubular Pole L.T.:- Digging of Pit , Drilling of holes in Pole X-Arm , Erection of Pole , Erection of X-Arm , Shackle Insulator,Painting of Pole and Filling of Pit and Ramming Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. | |||||
| 2Erection of L.T.Stay Set.:- Digging of Pit , Fixing of Stay road ,Nozzeling & tightening Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. | |||||
| 3Erection of AB cable 3X95+1X70+1X16 mm²:- Laying of AB cable Stringing and Sagging and Binding with suspension assembly, anchoring & facde hooks Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. | |||||
| 4Erection of Earthing Set.: - Digging of Pit , Fixing of GI wire to earth system & filling of pit Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. | |||||
| 5Manual carriage & transportation charges of LT Line:- Manual carriage of Stay set with stay wire (1 set ) from road head to site of work with average lead 2km | |||||
| 6Manual carriage from road head to site of work with avg lead 0.3 Km(0.3*0.15=0.05) | |||||
| 7Materials Part:- Prov.Steel Tubular Poles 9 m Long | |||||
| 8Prov.RCC Muffs with concrete filling(1800 mm) | |||||
| 9Prov. AB cable 3X95+1X70+1X16 mm² | |||||
| 10Prov.Suspension assembly | |||||
stage.html
html • 0.05 MB
technical_195559.pdf
techsummary_195559.pdf
finance_195559.pdf
BOQ Comparative Chart
xlsx
finsummary_195559.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
VolI.pdf
Tender Documents • 0.95 MB
VolII.pdf
Tender Documents • 0.51 MB
BOQ_195559.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid