Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance R G BARUAH ROAD NEAR SHIV MANDIR GUWAHATI AIRPORT GUWAHATI 781015 | KAMRUP METRO | ASSAM | 781015 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
14 Sept 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
LT COL DENNIS ANTHONY
GE (AF) BORJHAR NEAR LGBI AIRPORT GUWAHATI (ASSAM)-781015
REPAIR MAINT OF WINDOW SPLIT AC AND ALLIED WORKS AT 14 BRD (AF) UNDER GE (AF) BORJHAR
2022_MES_550311_1
3513/QTN/21/E3
Limited
Miscellaneous Services
Supply
60 days
GE (AF) BORJHAR
As per GST Registration
2 documents required · 2 mandatory
₹0
Exempted
15 Sept 2022
6 Sept 2022
15 Sept 2022
6 Sept 2022
14 Sept 2022
7 Sept 2022
1. Servicing to Window Split type AC of variuos capacities by cleaning with soda water and cleaning the filters checking gas leakage and rectification of minor faults all as directed by Engr-in-Charge. Each Job 22 (22). 2. Disconnecting to unserviceable sealed compressor of 1.5 Ton capacity window/split type AC and replaced with new hermatical sealed compressor of existing make & model including soldering of liquid / gas pipe cleaning the system arresting the leaking vaccum sing, initial charging of oil & refrigerant gas as required including installation testing & commissioning complete all as specified and as directed by Engr-in-Charge. Each 05 (05). 3. All as per above item No 2.02 here in bfore but 2.0 Ton capacity, Note for Sr Item No 2.02 & 2.03 :- (i) New sealed compressors shal be procured from Original Manufacturer / authorized dealer and locally repaired compessor shall not be accepted by the DEpartment (ii) Contractor shall be produced original purchase voucher of original manufacturer / authorized dealer and test certificate shall be of original manufacturer submit to the Department at the time of payment bill (iii) Refrigerant and Comp Oil for charging to be supplied by the Contractor. Each Job 02 (02). 4. S & F replacement to unserviceable copper capillary tube with new of appropriate required size including brazing & leakage testing for Window / Split type AC complete all as specified and as directed by Engr-in-Charge. RM 30 (30). 5. Dismantling to Blower fan motor from windows/split type AC and rewinding to same with super enameled copper wire of appropriate gauge including insulationvarnishing and replacement of worn out bearing bush, capacitor etc complete all as specified and directed by Engr-in-Charge. Each 03 (03). 6.S & F replacement to unserviceable starting capacitor 55 MFD with new for window/split type AC complete all as specified and as directed by Engr-in-Charge.Make- UNIVERSAL/SARADA. Each 12 (12). 7. S & F replacement to unserviceable thermostate switch with new suitable for windows/split type AC complete all as specified and directed by Engr-in-Charge. Make-UNIVERSAL/SARADA. Each 04 (04). 8. S & F replacement to unserviceable fan motor with blades suitable for window/split type AC complete all as specified and directed by Engr-in-Charge. Make- Samsung/LG or equivalent make approved by MES. Each 03 (03). 9. S & F replacement to unserviceable contactor accessories single phase AC supply with new suitable for windows/split type AC complete all as specified and directed by Engr-in-Charge. Make- Siemens or Equivalent make approved by MES. Each 08 (08). 10. S & F new copper pipe of dia 5/8 inch insulated by Nytril foam for suction line including brazing and making as leak proof and testing as in repair complete all as specified and directed by Engr-in-Charge. RM 20 (20). 11. S & F new copper pipe of dia 1/4 inch insulated by Nytril foam for suction line including brazing and making as leak proof and testing as in repair complete all as specified and directed by Engr-in-Charge. RM 30 (30). 12. M & L for insulation for condensor copper pipes as per existing type rubber insulating materials suitable for Split AC complete as directed by Engr-in-Charge. RM 30 (30). 13. S & F replacement to unserviceable electronic control panel board with new suitable for machine for 1.5/2.0 TR split type AC complete all as specified and directed by Engr-in-Charge. Each 04 (04). 14. S & F replacement to unserviceacle dispaly ckt suitable for 230 Volt, AC supply with new suitable of 1.5/2.0 TR split type AC complete all as specified and directed by Engr-in-Charge. Each 04 (04). 15. Dismantling, Shifting, Installation and testing of Window/Split type AC 1.5 / 2.0 TR from one place to another place in good conition all as specified and directed. Each Job 03 (03). 16. S & F replacement to unserviceable cordless remote with new suitable for machine of 1.5 /2.0 TR split type AC complete all as specified and directed by Engr-in-Charge. Each 03 (03). 17. Supply & Filling gas for 1.5 TR capacity window/split type AC with required quantity refrigerant after vaccuumising the system throughly, sealing and leakl testing complete all as directed by Engr-in-Charge. Each Job 12 (12). 18. Supply & Filling gas for 2.0 TR capacity window/split type AC with required quantity refrigerant after vaccuumising the system throughly, sealing and leakl testing complete all as directed by Engr-in-Charge. Each Job 10 (10).
19. S & F replacement to unserviceable condensor coil of existing size with new suitable size condensor coil for machine of 1.5 TR split type AC complete all as directed and specified. Each 05 (05). 20. S & F replacement to unserviceable condensor coil of existing size with new suitable size condensor coil for machine of 2.0 TR split type AC complete all as directed and specified. Each 04 (04). 21. Leakage testing by Nitrogen gas to Split type AC of variuos capacities including cleaning with soda water and cleaning the filters a& rectification of faults (Leakage) all as directed by Engr-in-Charge. Each 03 (03). 22. M & L for Refrigerant Gas R-410 with cylinder suitable for Split/Window AC complete as directed by Engr-in-Charge. KG 15 (15). 23. M & L for Refrigerant Gas R-32 with cylinder suitable for Split/Window AC complete as directed by Engr-in-Charge. KG 25 (25). 24. S & F PCB set for Inverter AC for indoor unit for Split AC 1.5/2.0 TR capacity complete all as specified and directed by Engr-in-Charge. Make- LG/Voltas/Blue Star. Each 03 (03). 25. S & F PCB set for Inverter AC for outdoor unit for Split AC 1.5/2.0 TR capacity complete all as specified and directed by Engr-in-Charge. Make- LG/Voltas/Blue Star. Each 02 (02). 26. S & F Dual Inverter indoor motor for indoor unit for Split AC 1.5 / 2.0 TR capacity complete all as specified and directed by Engr-in-Charge. Make- LG/Voltas/Blue Star. NOTE. Contractor should supply PCB for the OEM. Each 02 (02). 27. & F Dual Inverter indoor motor for outdoor unit for Split AC 1.5 / 2.0 TR capacity complete all as specified and directed by Engr-in-Charge. Make- LG/Voltas/Blue Star. NOTE. Contractor should supply PCB for the OEM. Each 02 (02). 28. Servicing to Standing type AC of 3 Tons capacities by cleaning with soda water abd cleaning the filters checking gas leakage & rectification of minor faults complete all as directed by Engr-in-Charge. Each 01 (01). 29. Checking, Diagenesis and rectfying minor faults in Deep Freezers of any capacities at installed locations as per site requirements complete all as specified and as directed by Engr-in-Charge. Each Job 01 (01). 30. Supply, Install, Test and commission hermetically sealed reconditioning compressor suitable for 500 Ltr capacity Deepfreezer of diffierent makes inlcuding vaccum sing, inital charging of oil and refrigerant gas required qaunitites to ensure efficient functioning and proper cooling & testing complete all as directed. (NOTE. Refrigerant and Comp Oil for charging to be supplied by the contractor. The manufacturer to the effect that the compressor has been reparied at their Auth, Service Centre, further a warranty of not less than 12 months shall be provided on the compressor). Make- Tecumseh/Kirloskar). Each 01 (01).
S.P. TRADERS
R. D. ENTERPRISE
K. K. Enterprise
A. M. Enterprise
M/S P M ENTERPRISES
M/s Capital Traders
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .