Tender Value
₹55.2 L
EMD Value
₹1.1 L
Closing Date
3 Sept 2026, 6:55 pm
PRANAB DEY/ EE/ NBDD
Annex Building, Uttarkanya, Fulbari, Jalpaiguri
Construction of Cement Concrete Road from Mokles Kujur House towards Saranjabari Primary School under Harsura GP at Tapan Block in the District of Dakshin Dinajpur (L - 500 M and W - 3.00 M)
2026_NBDD_1038970_3
NBDD/BS/EE/ NIe-T- 41/2026-27 (Sl. No. 01 to 04)
Open Tender
CIVIL WORKS
Percentage
240 days
Dakshin Dinajpur
Please refer Tender documents.
6 documents required · 6 mandatory
₹1.1 L
Yes
20 Aug 2026
20 Aug 2026
7 Sept 2026
20 Aug 2026
3 Sept 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.
(a) Depth up to 150 mm | 1,500 | Sq.m | 17.16 | ₹25,735.8 |
| 2 | Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting rank vegetation,
grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal ofunserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. (Reference to MoRT&H's specification clause 201)
3(II) By Mechanical Means
3(II)(A) In area of light jungle | 0.2 | Hectar | 59,747.31 | ₹11,949.46 |
| 3 | Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading,grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305) Cost of compensation for Earth material & its carriage from private land at 5km distance have been included in the rate. | 1,400 | Cu.m | 260.45 | ₹3,64,629.44 |
| 4 | By Mix in Place Method
Construction of granular sub-base by providing graded materials such as natural sand/crushed gravel/crushed stone/combination depending uponthe required grading , spreading in uniform layers with motor grader onprepared surface, mixing by mix in place method with rotavator andcompacting with vibratory roller toachieve at least 98% of the maximumdry density for the material determined as per IS:2720 (Part 8),complete as per clause 401 desire density, complete as per clause 401 Rate per cum for grading-V Material
Using Pakur Variety
Main Road portion | 229.5 | Cu.m | 4,019.16 | ₹9,22,397.82 |
| 5 | Water Bound Macadam
Providing, laying, spreading and compacting stone aggregates of
specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/vibratory roller 8-10 tonnes in stagesto proper grade and camber, applyingand brooming requisite type of screening/ binding Materials to fill upthe interstices of coarse aggregate,watering and compacting to therequired density (eference to MoRT&H's specification 404).
9A By Manual Means
9A(i) Grading-1(Table 400-9)
9A (i)(b) Using Screening (Table 400-10)
Type-A (13.2 mm aggregate) PAKUR
Using Pakur Variety | 115.26 | Cu.m | 5,715.28 | ₹6,58,743.5 |
| 6 | Plain/Reinforced cement concrete in open foundation complete all including vibrating and compacting,finishing, curing, sampling, testing etc. as per drawing and Technical Specifications (Reference to MORT&H's specifications 1500, 1700 &2200) Including Shuttering.
PCC Grade M30
Using Concrete Mixer
Using Pakur Variety | 306 | Cu.m | 8,748.61 | ₹26,77,076.01 |
| 7 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 1,734 | Sq.m | 28.6 | ₹49,597.95 |
| 8 | Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work (Reference to MoRT&H's specification clause 304).
13(i) Ordinary soil
13(i)A Manual Means (Depth upto 3 m) | 23.1 | Cu.m | 409.12 | ₹9,450.62 |
| 9 | Sand Filling in Foundation Trenches with good local sand free from earth not exceeding 150 mm compacted thickness including inundating each layer by profuse water and porking and rammimg layer by layer. Quality of sand is to be approved by the Engineer-in-charge.(Reference to MORT&H's specification 304). | 4.95 | Cu.m | 1,326.85 | ₹6,567.91 |
| 10 | Plain/Reinforced cement concrete in open foundation complete all including vibrating and compacting, finishing, curing, sampling, testing etc. as per drawing and Technical Specifications (Reference to MORT&H's specifications 1500, 1700 & 2200). Including Shuttering
PCC Grade M15
Using Concrete Mixer
Using Pakur Variety | 10.33 | Cu.m | 7,735.56 | ₹79,908.34 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_2551957.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].