Loading…
Loading…
Tender Value
₹32.1 L
EMD Value
₹33,000
Closing Date
17 Aug 2026, 6:00 pmClosed
Executive Engineer, Und Irrigation Division, Jamnagar
REPAIRING OF CHECKDAM Repairing of Satiya Big Checkdam Package No. JMN 18(3) near village : Satiya, Tal. Kalavad, Dist. Jamnagar (Second Attempt).
330120
07 of 2026-27
Open
Civil Works
Works
Jamnagar
7 documents required · 7 mandatory
₹1,500
EXECUTIVE ENGINEER UND IRRIGATION DIVISION JAMNAGAR
₹33,000
1 Aug 2026
1 Aug 2026
1 Aug 2026
17 Aug 2026
1 Aug 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 10 Cr.)
Name of work : REPAIRING OF CHECKDAM
Repairing of Satiya Big Checkdam Package No. JMN 18(3) near
village : Satiya, Tal. Kalavad, Dist. Jamnagar (Second Attempt).
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
1(a) Excavation in all sort of strata and 220.00 Cum. 79.00
formations incl. depositing the unuseful
excavated stuff as and where directed
incl. sorting and stacking useful materials
as directed upto 200 mt lead and all lift
etc. complete incl. dewatering.
(A) IN OVER BURDEN HARD MURRUM.
1(b) (B) IN SOFT ROCK 40.00 Cum. 176.00
1(c) (C) IN HARD ROCK 131.00 Cum. 590.00
2 Drilling 25mm dia. holes at distant as 174.00 Rmt. 252.00
specified upto 3.00 mt. depth in
checkdam foundation and fixing anchor
bars of specified diameter with cement
grout including cleaning holes as directed
etc. (Excluding cost of Bars)
3 Providing, cutting, bending, binding and 14.50 M.T. 76574.00
fixing in position as per drawing TMT
BAR, reinforcement for R.C.C. works and
anchor bars incl cost of black annealed
to 18 BWG M.S.. Wire etc. complete with
all lead and lift. (B) Fe-500
4 Prov. & Laying in position cement 572.00 Cum. 3423.00
concrete using cement , sand and crushed
metal coarse aggregate by mass and
machine mix for PCC/RCC including
necessary formworks compaction by
vibrator, curing as directed with all lead
& lift etc complete.(Excluding cost of
steel) FOR .BODY WALL, APRON,
TRAINING WALL, SIDE WALL, SPLAY
WALL, KEY WALL, CUT OF WALL ETC.
4/C) Controlled Concrete Grade M-15 &
I am/we are willing to carry out the work at ____________________ % below/above percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of
My/Our tender works out as under :-
Estimated Amount Rs. 32,13,837=00 Estimated Amount Rs. 32,13,837=00
Put to Tender Rs. Put to Tender Rs.
Deduct _______% Below Rs. __________ Add _______% Above Rs. __________
Net Rs. Net Rs.
(Rupees in words) ________________________ (Rupees in words) ________________________
1. The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
5. The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other
levies except GST payable by the contractor under the contract.
Signature of Contractor Executive Engineer
Und Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2.pdf
BOQ.pdf
Tender Notice No.7.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .