Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76,400Accepted-Finance | L1 | Accepted-Finance L1 bidder | |
| 2 | L2₹89,550+₹13,150 (17.2%)Accepted-Finance | L2 | Accepted-Finance L2 bidder |
Tender Value
₹1.1 L
EMD Value
₹2,000
Closing Date
9 Jun 2022, 4:00 pmClosed
SE ETC I, Lucknow
Pareshan Bahwan, Vibhuti Khand, Lucknow
Work of servicing overhauling of air conditioner system of capacity 2.0 ton split type AC installed at 132 KV Substations under ETD I Lucknow
2022_UPTCL_695553_2
e-tender 12/2022-23
Open Tender
Electrical Works
Piece-work
30 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹236
A/c No 2408002190005438, IFS PUNB0691100, PNB, Lko
₹2,000
12 Jul 2022
21 May 2022
10 Jun 2022
21 May 2022
9 Jun 2022
21 May 2022
Amount
Following Work to be done at vaious 132 KV Substations under E.T.D.- I, Lucknow for Repair, Maintenance, Refilling of Gas and Overhauling of 2.0 Ton Split Air Conditioners and other associated works with all cost of men, materials and T&P for satisfactory completion of the work including Cost of Transportation to repair shop as needed :
132 KV GIS S/S Mehtab Bagh (13 Nos.):
Replacement of Compressor of suitable capacity & specification including full charging with Refrigerant Gas and checking & arresting of Gas leakage if any.
Topping up of Refrigerant Gas.
Replacement of PCB complete in all respect.
Replacement of Running Capacitor.
Replacement of Indoor Fan Motor.
Replacement of Outdoor Fan Motor.
Servicing & Maintenance of 13 No. 2.0 Ton capacity Split Air Conditioners (02 Times per season at an interval of 03 months). (01 Jop per ACs)
Replacement of outdoor Copper Pipe Insulation
Replacement of Damaged Copper Pipe
132 KV S/S GIS Hanuman Setu (14 Nos.):
Topping up of Refrigerant Gas.
Replacement of PCB complete in all respect.
Replacement of Running Capacitor.
Replacement of Indoor Fan Motor.
Replacement of Outdoor Fan Motor.
Repairing of 5 KVA Stabilizer (Marc make) for 2.0 Ton capacity A.C. including replacement of parts as needed.
Servicing & Maintenance of 14 No. 2.0 Ton capacity Split Air Conditioners (02 Times per season at an interval of 03 months). (01 Jop per ACs)
Replacement of outdoor Copper Pipe Insulation
Replacement of Damaged Copper Pipe
M/S T R TRADERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .