| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | Rejected-Technical COLLEGE OF ENGINEERING THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | KERALA | - | Rejected-Technical Technically qualified it is rejected being L2 |
| Sl No | Description | Qty | Unit | SURESH KUMAR G S L1 | RAJESHKUMAR V R L2 |
|---|---|---|---|---|---|
| 1.00Estimate | |||||
| 1.00 | OD283378/2025-2026:Supplying mangalore roofing tiles including all conveyance rate as per DAR No. 8670 | 3,000 | each | 11.67 ₹35,010 Lowest | 23.5 ₹70,500 |
| 1.00 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 150 | kg | 150.33 ₹22,549.5 Lowest | 171 ₹25,650 |
| 1.00 | OD283377/2025-2026:Removing and readjusting with MP roofing tiles of department of supplied etc. complete as per direction from Engineer. | 543 | sqm | 179.39 ₹97,408.77 | 23.5 ₹12,760.5 Lowest |
| 1.00 | OD283379/2025-2026:Removing and readjusting MP hip and ridge tiles departmental/ supplied etc. complete as per the direction from the Engineer | 100 | metre | 90.61 ₹9,061 | 28.2 ₹2,820 Lowest |
| 1.00 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 543 | sqm | 213.11 ₹1,15,718.73 Lowest | 243 ₹1,31,949 |
| 1.01 | OD283374/2025-2026:Supplying mangalore hip and ridge tiles including cost of materials conveyance etc. complete | 60 | each | 11.67 ₹700.2 Lowest | 94 ₹5,640 |
| 1.01 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 280 | sqm | 301.1 ₹84,308 Lowest | 343 ₹96,040 |
| 1.01 | 13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 776.64 | sqm | 17.26 ₹13,404.81 Lowest | 20 ₹15,532.8 |
| 1.01 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 817.64 | sqm | 68.12 ₹55,697.64 Lowest | 78 ₹63,775.92 |
Tender Value
₹12.3 L
EMD Value
₹30,832
Closing Date
3 Mar 2026, 5:00 pmClosed
Executive Engineer
PWD Buildings Division Thiruvananthapuram
General-Nila Bungalow Annual maintenance 2026 work Civil work
2026_PWD_835234_2
TR/1345/2026_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
90 days
Thiruvananthapuram
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹30,832
Yes
4 Aug 2026
24 Feb 2026
6 Mar 2026
24 Feb 2026
3 Mar 2026
24 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Estimate | |||||
| 1.001 | OD283378/2025-2026:Supplying mangalore roofing tiles including all conveyance rate as per DAR No. 8670 | - | each | - | - |
| 1.002 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | - | kg | - | - |
| 1.003 | OD283377/2025-2026:Removing and readjusting with MP roofing tiles of department of supplied etc. complete as per direction from Engineer. | - | sqm | - | - |
| 1.004 | OD283379/2025-2026:Removing and readjusting MP hip and ridge tiles departmental/ supplied etc. complete as per the direction from the Engineer | - | metre | - | - |
| 1.005 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | - | sqm | - | - |
| 1.006 | OD283374/2025-2026:Supplying mangalore hip and ridge tiles including cost of materials conveyance etc. complete | - | each | - | - |
| 1.007 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | - | sqm | - | - |
| 1.008 | 13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 1 | sqm | - | - |
| 1.009 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 1 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1416020.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
TenderDocuments.pdf
Tender Documents • 1.13 MB
viewnit.pdf
Other Document • 0.03 MB
BOQ_1416020.xls
BOQ • 0.33 MB
viewsbd.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .