Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
3 Nov 2026, 11:00 am
Single Packet
Normal Tender
No
Not Applicable
Itemwise/Consigneewise
Lowest to Highest
RITES
RDSO
Yes
180 days
Expenditure
PSC Mainline Sleeper
P77
6 conditions · 2 needing a document upload
As per Clause 6.0 of Invitation and Instruction to Tenderers.
(i) Concrete Sleeper Plants (CSPs) approved by RDSO for RDSO Item ID:3100589 [ PRE-TENSIONED PRESTRESSED CONCRETE SLEEPERS FOR BROADGAUGE, METRE GAUGE AND NARROW GAUGE] for undertaking production ofPSC Main Line sleepers or any other category PSC sleepers for IR shall beeligible for Bulk/Regular and Developmental ordering depending upon theirapproval status.(ii) Status of approval of tenderer shall be reckoned as onthe date of tender opening and not thereafter, unless it is a case ofdowngrading/ removal/suspension/banning.(iii) (a) Vendors approved fordevelopmental ordering shall be eligible for developmental order of up to20% of Net Procurable Quantity[NPQ] . (iii) (b) Total developmental orders will be limited to 20% of NPQ.
Existing manufacturers quoting for supply from a new location after shiftingtheir existing plant should have prior approval for supply from new locationas per instructions of Railway Board vide letter No. 2004/Tk- II/22/11/5 dated22.02.2006.Plants, which have already been permitted for shifting of locationbut have not shifted/started production from new location, even after lapseof one year or more from date of issue of permission letter, shall not beeligible to quote from old location. They will be eligible to quote from newlocation only if they have already obtained the RDSO certification of Plant atnew location, before the date of tender opening. Bidder should indicate (inremarks) if they are quoting for supply from a new location. If so necessarycertificate from RDSO should also be attached.
Those plants will be considered closed, which have not manufactured anytype of sleepers (mainline, Turnout, special sleepers) for more than fiveyears reckoning from the date of tender opening. Such plants will not beeligible for tender until and unless fresh RDSO certification/approval isobtained and placed on record. Bidder should submit last 5 yearsperformance along with offer
(i) Evaluation of the tender is Itemwise / Consigneewise. Tender is issued making separate item for each Division. Separate ' PL Code' have beenassigned, accordingly for each Division requirement. Any Bidder may submittheir Bids for any one, more than one or for all 'PL Codes'. Minimum offeredquantity by a tenderer for a PL Code (Division) should be atleast 50% of thetender quantity for the PL Code (Division). Offers for quantity less than the minimum quantity as specified above, will be summarily rejected for theparticular PL Code (Division).(ii) Further in addition of above, it is alsostipulated that the bidder CSP quoting for any PL code (Division) will alsohave to mandatorily quote for the PL Code (Division) in which CSP is locatedor for the Division nearest to the CSP. The Bidder should also indicate PlantLocation from which supplies are to be made.Offers of bidders , not quotingfor the PL Code (Division) in which CSP is located or for the PL code (Division)nearest to the CSP, shall be summarily rejected for all the PL Codes(Divisions).
The Firm should not be black listed/suspended/banned for business byRailway. Bidder should submit self declaration in this regard.
13 conditions
Have you attached all the documents with the offer in terms of Para 8.0 of Invitation and Instruction to Tenderers
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
2 conditions
Validity of Offer: No deviation from the offer validity period stipulated in the tender is permitted.
Price Variation Clause: No deviation from the Price Variation Clause stipulated in the tender is permitted.
6 locations across Haryana, Delhi, Jammu And Kashmir, Uttar Pradesh · 100 Set total
Running Contract for Procurement of Prestressed Concrete Sleepers for 1 in 8.5, 60kg Turnout (Sleeper no.41 to 54) to RDSO Drg. No: T-4865
77269053A~NR
77269053A
Open - Indigenous
Goods
Haryana
₹0
₹2.0 L
16 Sept 2026
16 Sept 2026
6 items · 100 Set total
Manufacturing and supply of Pre-stressed Concrete sleeper no 41 to 54 for 1 in 8.5, 60 Kg turnout to RDSO Drg. No: T-4865 Alt.09 & conforming to IRS specification T-45-2021 ( Fourth Revision) [ Warranty Period: 60 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| ANYWHERE IN UMB DIV. OF N.RLY | Haryana | 10.00 Set |
| Total | 10 Set | |
Manufacturing and supply of Pre-stressed Concrete sleeper no 41 to 54 for 1 in 8.5, 60 Kg turnout to RDSO Drg. No: T-4865 Alt.09 & conforming to IRS specification T-45-2021 ( Fourth Revision) [ Warranty Period: 60 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| ANYWHERE IN DLI DIV. OF N.RLY | Delhi | 30.00 Set |
| Total | 30 Set | |
Manufacturing and supply of Pre-stressed Concrete sleeper no 41 to 54 for 1 in 8.5, 60 Kg turnout to RDSO Drg. No: T-4865 Alt.09 & conforming to IRS specification T-45-2021 ( Fourth Revision) [ Warranty Period: 60 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| ANYWHERE IN JAT DIV. OF N.RLY | Jammu And Kashmir | 10.00 Set |
| Total | 10 Set | |
Manufacturing and supply of Pre-stressed Concrete sleeper no 41 to 54 for 1 in 8.5, 60 Kg turnout to RDSO Drg. No: T-4865 Alt.09 & conforming to IRS specification T-45-2021 ( Fourth Revision) [ Warranty Period: 60 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| ANYWHERE IN LKO DIV. OF N.RLY | Uttar Pradesh | 20.00 Set |
| Total | 20 Set | |
Manufacturing and supply of Pre-stressed Concrete sleeper no 41 to 54 for 1 in 8.5, 60 Kg turnout to RDSO Drg. No: T-4865 Alt.09 & conforming to IRS specification T-45-2021 ( Fourth Revision) [ Warranty Period: 60 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| ANYWHERE IN FEROZPUR DIVISION OF NORTHERN RAILWAY | — | 10.00 Set |
| Total | 10 Set | |
Manufacturing and supply of Pre-stressed Concrete sleeper no 41 to 54 for 1 in 8.5, 60 Kg turnout to RDSO Drg. No: T-4865 Alt.09 & conforming to IRS specification T-45-2021 ( Fourth Revision) [ Warranty Period: 60 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| ANYWHERE IN MORADABAD DIVISION OF NORTHERN RAILWAY | — | 20.00 Set |
| Total | 20 Set | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
RailwayBoardLetter-ProcessInspection.pdf
ATTACHMENT
Revised_IRS_Conditions_of_Contract_Sept2022_Version_1.0_21092022.pdf IRS_Condition_of_Contract_Ver.1.0_September2022
ATTACHMENT
IndemnityBondfor90payment.pdf
ATTACHMENT
IndemnityBondforbalance10payment.pdf
ATTACHMENT
ITT_Rev_1.21_April_2024.pdf
ATTACHMENT
SpecialConditionsofContract_1.pdf
ATTACHMENT
Corrigendum1ITT_Rev_1.21_April_20241.pdf
ATTACHMENT
IRST45Specification.pdf
ATTACHMENT
ProcessInspectionofSleepers.pdf
ATTACHMENT
ProcessInspectionletter081025_1.pdf
ATTACHMENT
INVITATIONANDINSTRUCTIONSTOTENDERERS.pdf
ATTACHMENT
STR_2025.pdf
ATTACHMENT
Revised_IRS_Conditions_of_Contract_Sept2022_Version_1.0_21092022.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .