Loading…
Loading…
Tender Value
₹57.2 L
EMD Value
₹1.1 L
Closing Date
8 Oct 2026, 5:00 pmClosed
Estate Officer
Agriculture University, Kota
Various Construction of workds including boundry wall along with strengthning of existing boundary wall, Electrical panel room etc at ARS, Kota
2026_AUK_601247_1
NIT04/2026-27/3
Open Tender
Civil Works
Percentage
210 days
Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Estate Officer
₹1.1 L
Yes
28 Sept 2026
28 Sept 2026
9 Oct 2026
28 Sept 2026
8 Oct 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1existing boundary wall, Electrical Panel Room | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 91.2 | cum | 178 | ₹16,233.6 |
| 1.02 | Supplying and Filling in plinth with blown sand under floors including watering ramming consolidating and dressing complete including cost of sand. | 472.5 | cum | 450 | ₹2,12,625 |
| 1.03 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix
1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | 341.65 | cum | 3,847 | ₹13,14,327.55 |
| 1.04 | Random Rubble stone masonry for foundation and plinth in Cement Sand mortar above 30 cm thick wall in : Cement Mortar 1 : 6 (1-Cement : 6-Sand). | 219.15 | cum | 2,838 | ₹6,21,947.7 |
| 1.05 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level.
('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Hot rolled deformed bars (IS : 1139). | 5,500 | Kg | 77 | ₹4,23,500 |
| 1.06 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement.
M20 grade Nominal Mix / Design Mix | 237 | cum | 4,934 | ₹11,69,358 |
| 1.07 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc.
M20 grade Nominal Mix / Design Mix | 16.52 | cum | 5,609 | ₹92,660.68 |
| 1.08 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 120 | sqm | 157 | ₹18,840 |
| 1.09 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Columns, pillars, posts and struts etc. | 183.6 | sqm | 375 | ₹68,850 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_1065782.xls
BOQ • 0.30 MB
Notice3.pdf
Tender Documents • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .