Loading…
Loading…
Tender Value
₹12.7 L
EMD Value
₹31,770
Closing Date
22 Aug 2026, 10:00 amClosed
ASSISTANT ENGINEER
Office of the Assistant Engineer,LID EW Section Ayancheri Grama Panchayath
Annual Plan AYANCHERI GP 2025 26 Pro No 151 25 26 THUMBIYOTTU THAZHE STREAM PROTECTION General Civil Work
2026_LSGD_864304_6
01/AE/LIDEW/AGP/2026-27
Open Tender
Civil Works - Water Works
Item Rate
180 days
AYANCHERI GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹31,770
Yes
22 Aug 2026
10 Aug 2026
24 Aug 2026
10 Aug 2026
22 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1STREAM PROTECTION | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
| 1.002 | OD18441/2026-2027:OD-60.7.1. DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course
masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials, labour charges etc. complete as per the direction of Departmental officers at site | 1 | cum | - | - |
| 1.003 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.004 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.005 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 1 | sqm | - | - |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.007 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
ipact.pdf
Tender Documents • 0.23 MB
BOQ_1462743.xls
BOQ • 0.30 MB
formoftender.pdf
Tender Documents • 0.17 MB
viewsbd.pdf
Tender Documents • 1.83 MB
epay.pdf
Tender Documents • 0.23 MB
preliminaryagreement.pdf
Tender Documents • 0.20 MB
affidavit.pdf
Tender Documents • 0.08 MB
nobid.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .