| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC | L1 | Accepted-AOC SUCCESSFUL BIDDER | |
| 2 | L2₹6.4 L+₹5,929.92 (0.93%)Rejected-AOC | L2 | Rejected-AOC VALID BID |
Tender Value
₹5.9 L
EMD Value
₹14,830
Closing Date
7 Mar 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Asst Engineer
LID EW SECTION ,KUNNATHUNAD G P
chira maintenance
2025_LSGD_741929_1
5/AE/LIDEW/24-25
Open Tender
Civil Works - Water Works
Item Rate
180 days
W 8
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,310
Yes
₹14,830
Yes
11 Apr 2025
26 Feb 2025
10 Mar 2025
26 Feb 2025
7 Mar 2025
26 Feb 2025
Amount
Tiller passage cum drain
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
OD454407/2024-2025:Engaging man coolies for clearing the chira side
SUDHAKARAN K K (BID ID -2140563)
Bidder Name
K V JAMAL
SUDHAKARAN K K
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1193956.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .