Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 13TH FLOOR PLOT NO A 3 INFINITY THINK TANK TOWER II GP BLK SALTLAKE KOLKATA WEST BENGAL 700091 | KOLKATA | KOLKATA | WEST BENGAL | 700091 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹98,000
Closing Date
10 Jul 2020, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGMCOM
INCOD OFFICE, NAVAL DOCKYARD, SBS ROAD, MUMBAI-400023
10K ROUTINES (FWD 02 NOS AFT 01 NOS) AND 20K ROUTINES (FWD 01 NOS AFT 01 NOS) ON REF PLANT
2020_NAVY_354734_1
DYT/RAC/20-21/106(A)/PL INCOD/VKD-REF PLANT/011
Single
Miscellaneous Services
Item Rate
42 days
NAVAL DOCKYARD MUMBAI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹98,000
Yes
NAVAL DOCKYARD MUMBAI
13 Jul 2020
22 Jun 2020
13 Jul 2020
22 Jun 2020
10 Jul 2020
2 Jul 2020
2 Jul 2020
180 days
Amount
Mandatory system spares for 20K Routines on Ref Plant: Gasket connection side (condenser)
Gasket return cover side.
Filter drier insert 48DN (023U4380)
Thermostatic expansion valve (TES2)
Discharge switch
Suction pressure switch with reset.
Oil differential pressure switch.
Thermostat RT 1A
Temperature sensor (PT100)
Thermostat RT 2
Liquid line solenoid valve EVR 6
Liquid line solenoid valve EVR 3
Pressure control valve PRE 11B
On/Off SW (M22-K10 – RED)
On/Off SW (M22-K10 – BLUE)
Electronic timer (3RT15 11 – 1AQ30)
Control relay (3RH11 31 – 1AB00)
Contactor relay (3RH11 40 – 1AF00)
Solid state time relay (3RP15 05-1AQ30)
10K Routines on Ref Plant, Fwd 02 in nos. & Aft 01 in nos.: (a) Pump down the system. (b) Recover refrigerant from system in to cylinder. (c) Drain oil from compressor. (d) Top overhaul of compressor. (e) Change oil filter. (f) Change drier core. (g) Check & replace belt and check alignment. (h) Check expansion valve for working, check & replace orifice and element if required. (j) Dismantling of condenser. (k) Check & replace end cover gasket of condenser. (l) Chemical cleaning of condenser. (m) Check & replace float switch if malfunctioning. (n) Check & replace all gauges. (p) Check & replace all pressure switches. (q) Check electrical connections. (r) Check & replace all solenoid coils. (s) Check & replace room temperature sensor. (t) Check suction pressure regulator and replace if defective. (u) Check & replace defrosting thermostat. (v) Check & replace filters. (w) Check & replace all lamps. (x) Check & replace all push buttons. (y) Check & replace all fuses. (z) Check & replace all relays. (aa) Overhauling of faulty Ref system valves. (bb) Pressure test of Ref system with N2. (cc) Vacuum test. (dd) Charging of fresh oil. (ee) Charging of refrigerant.
20K Routines on Ref Plant, Fwd 01 in nos. & Aft 01 in nos.:(a) Pump down the system. (b) Recover refrigerant from system into cylinder. (c) Drain oil from compressor. (d) Overhauling of compressor. (e) Change drier core. (f) Check & replace belt and check alignment. (g) Check & replace expansion valve & replace orifice and element if defective. (h) Dismantling of condenser. (j) Chemical cleaning of condenser. (k) Check & replace end cover gaskets of condenser. (l) Blow through product coolers in each room with N2. (m) Check & replace float switch if malfunctioning. (n) Check & replace sea water pressure switch. (p) Check & replace all gauges. (q) Check & replace all pressure switches. (r) Check electrical connections. (s) Check & replace all pressure relief valves. (t) Check & replace all solenoid coils. (u) Check & replace room temperature sensor. (v) Check suction pressure regulator and replace if defective. (w) Check & replace defrosting thermostat. (x) Check & replace filters. (y) Check & replace all lamps. (z) Check & replace all push buttons. (aa) Check & replace all fuses. (bb) Check & replace all relays. (cc) Check & replace motor protection. (dd) Check & replace auxiliary contactor. (ee) Check & replace hour counter. (ff) Check & replace temperature controller/indicator. (gg) Overhauling of all Ref system valves. (hh) Check flexible metal hoses, replace if defective. (jj) Check & replace defrost drain heater. (kk) Check air cooler heaters, replace if found defective. (ll) Pressure test of Ref system with N2. (mm) Vacuum test. (nn) Charging of fresh oil. (pp) Charging of refrigerant.
stage.html
html • 0.02 MB
finance_396143.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .