| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹8.1 LAccepted-AOC VILL MAHUDA BASTI P O MAHUDA DIST DHANBAD | MAHUDA | DHANBAD | JHARKHAND | ₹8.1 L | L2 | Accepted-AOC As the L1 bidder failed to fulfill the tender conditions, the work was awarded to the L2 bidder at the rate quoted by the L1 bidder. |
| 2 | Rejected-Technical MAHUDA BAZAR DHANBAD 828305 | DHANBAD | DHANBAD | JHARKHAND | 828305 | - | - | Rejected-Technical L4 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L1 |
Tender Value
₹9.0 L
EMD Value
₹18,000
Closing Date
2 May 2026, 5:00 pmClosed
Exe Eng R D Spl Div, Dhanbad
Exe Eng R D Spl Div, Dhanbad
Construction of Drain with Cover in Murlidih 20/21 under Mahuda Panchyat of Baghmara Block, Dist. Dhanbad
2026_RDSPL_113095_1
03/2026-27/RDSD/EE/Dhanbad/3rd Call/Gr.02
Open Tender
Civil Works
Percentage
60 days
Baghmara
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,250
₹18,000
23 Jun 2026
25 Apr 2026
4 May 2026
25 Apr 2026
2 May 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling pucca brick or lime work including stacking serviceable materials in countable stacks within 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. (1/5.10.1) | 1 | M3 | 541.67 | ₹541.13 |
| 2 | Excavation of Structires : E/W in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shorting and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work all complete as per direction of E/I. (2/3.13 (i) A | - | M3 | 316.2 | - |
| 3 | Plain cement concrete (1:3:6) nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days all complete as per direction of E/I. (3/12.04) | 1 | M3 | 3,376.1 | ₹3,372.72 |
| 4 | PCC/RCC in Superstructure : Plain/reinforced cement concrete in Substructure complete as per drawing and technical specifications all complete as per direction of E/I. (4/12.08 C case (ii) | 1 | M3 | 4,499.7 | ₹4,495.2 |
| 5 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawing and technical specifications. (5/12.42). | - | M3 | 87,394.8 | - |
| 6 | Carriage of Materials (i) Cement + Steel Av. Lead 10 KMP | - | M3 | 502.6 | - |
| 7 | (ii) Stone Chips Av. Lead 15 KMP | 1 | M3 | 323.7 | ₹323.38 |
| 8 | (iii) Sand Av. Lead 15 KMP | 1 | M3 | 323.7 | ₹323.38 |
| 9 | Goods & Service Tax (G.S.T.) - | - | Rs. | 0.18 | - |
| 10 | Labour Cess - | - | Rs. | 0.01 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
SBDNit03Gr02.pdf
Tender Documents • 1.35 MB
BOQ_152688.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .