Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAdmitted-Finance | ₹9.8 L | L1 | Admitted-Finance |
| 2 | L2₹9.8 LAdmitted-Finance | ₹9.8 L | L2 | Admitted-Finance |
| 3 | L3₹9.8 LAdmitted-Finance H NO 192 RANE WADA KERIM SATTARI GOA | ₹9.8 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SULEMAN MEHABOOB MULLA L1 | SANIKA CONSTRUCTIONS L2 | RANE CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means (hydraulic excavator)/ manual means in foundation pipeline trenches drain (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out the excavated soil and disposal of surplus excacated soil as directed within a lead of 50m.
a) All kinds of soil | 153 | Cum | 35,618.4 ₹42,029.71 Lowest | 35,618.4 ₹42,029.71 Lowest | 35,618.4 ₹42,029.71 Lowest |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 10 | Cum | 17,688.3 ₹20,872.19 Lowest | 17,688.3 ₹20,872.19 Lowest | 17,688.3 ₹20,872.19 Lowest |
| 3.00 | Providing & Laying cement Concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering in
a) All works upto Plinth level | 123 | Cum | 6,70,104 ₹7,90,722.72 Lowest | 6,70,104 ₹7,90,722.72 Lowest | 6,70,104 ₹7,90,722.72 Lowest |
| 4.00 | Centering and shuttering including struttings, propping etc. and removal of formwork for:
Foundations, footings, bases for coulmns and mass concrete etc. | 276 | Sqm | 89,865.6 ₹1,06,041.41 Lowest | 89,865.6 ₹1,06,041.41 Lowest | 89,865.6 ₹1,06,041.41 Lowest |
| 5.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge
110 mm dia | 69 | RM | 20,037.6 ₹23,644.37 Lowest | 20,037.6 ₹23,644.37 Lowest | 20,037.6 ₹23,644.37 Lowest |
Tender Value
₹12.3 L
EMD Value
₹24,583
Closing Date
4 Aug 2026, 5:30 pmClosed
EEVI, WRD, Bicholim
EEVI, WRD, Bicholim
Improvement to nallah bank by construction protection wall near the field in Sy. No. 11/6 Brahmakarmali, V.P. Nagargao in Sattari Taluka.
2026_WRD_30547_1
No.WRD/WDVI/PB/F.30/TN e 14/2026-27/347 line 12 Dated 21/07 /2026
Open Tender
Civil Works - Water Works
Item Rate
60 days
Bicholim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹24,583
26 Aug 2026
23 Jul 2026
5 Aug 2026
23 Jul 2026
4 Aug 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavator)/ manual means in foundation pipeline trenches drain (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out the excavated soil and disposal of surplus excacated soil as directed within a lead of 50m.
a) All kinds of soil | 153 | Cum | 291 | ₹44,523 | 18% |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 10 | Cum | 2,211 | ₹22,110 | 18% |
| 3 | Providing & Laying cement Concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering in
a) All works upto Plinth level | 123 | Cum | 2,211 | ₹2,71,953 | 18% |
| 4 | Centering and shuttering including struttings, propping etc. and removal of formwork for:
Foundations, footings, bases for coulmns and mass concrete etc. | 276 | Sqm | 2,211 | ₹6,10,236 | 18% |
| 5 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge
110 mm dia | 69 | RM | 2,211 | ₹1,52,559 | 18% |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Tendernotice_2.pdf
PDF • 0.93 MB
BOQ_30957.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].