Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.5 LAccepted-AOC | ₹43.5 L | L1 | Accepted-AOC Agreement executed |
| 2 | L2₹44.1 L+₹57,309.37 (1.32%)Rejected-Finance | ₹44.1 L+₹57,309.37 (1.32%) | L2 | Rejected-Finance Second lowest |
| 3 | L3₹47.6 L+₹4.0 L (9.23%)Rejected-Finance | ₹47.6 L+₹4.0 L (9.23%) | L3 | Rejected-Finance Third lowest |
| 4 | L4₹49.6 L+₹6.0 L (13.9%)Rejected-Finance | ₹49.6 L+₹6.0 L (13.9%) | L4 | Rejected-Finance Fourth lowest |
| 5 | L5₹55.8 L+₹12.3 L (28.2%)Rejected-Finance | ₹55.8 L+₹12.3 L (28.2%) | L5 | Rejected-Finance Fifth lowest |
Tender Value
₹56.0 L
EMD Value
₹50,000
Closing Date
24 Aug 2023, 2:00 pmClosed
Executive Engineer
EE ,Roads division ,TVM
40MM CC
2023_PWD_596666_1
PWD/RB/TR/8316/2023_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
150 days
Thiruvananthapuram
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
10 Oct 2023
18 Aug 2023
26 Aug 2023
18 Aug 2023
24 Aug 2023
18 Aug 2023
Amount
Road widening
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
40 mm chipping carpet
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
OD22983/2023-2024:Supplying and stacking 24mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.3:Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
OD22880/2023-2024:Providing 40 mm premixed chipping carpet over BT surface with departmental broken stones after thoroughly cleaning the base with wire brushes, brooms and applying a priming coat of hot bitumen @ 2.5 Kg/10 m2 and spreading the hot premix of 0.32 m3 of 24mm, 0.22 m3 of 12mm departmental metal mixed with 22.08 Kg of bitumen per 10 m2, rolling to dense surface, then spreading the seat coat comprising 0.09 m3 of 6mm metal mixed with 8.64 Kg of bitumen per 10 m2 and rolling again including cost of bitumen , fuel, hire charges, machineries etc complete ( Total usage of bitumen 33.22 Kg per 10 m2) (IRC 3.4.2)
Arun Kumar S S
B SURENDRAN
S. RAJENDRAN
SHOBHA CONSTRUCTION
Bidder Name
SHOBHA CONSTRUCTION
S. RAJENDRAN
B SURENDRAN
VISHNU RAJ R B
Arun Kumar S S
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_885480.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .