Tender Value
₹13.5 L
EMD Value
₹13,479
Closing Date
28 Sept 2026, 11:00 amClosed
EXECUTIVE ENGINEER (AM), VISAKHAPATNAM DIVISION
Gopalapatnam
Construction of Dormitory at Market Yard Pedaboddepalli AMC Narsipatnam in Anakapalli District
987661
NIT No. 04/EPpro/Dy.EE/EE(AM)VSP/2026-27, Date: 11.09.2026
OPEN - NCB
Buildings
ANAKAPALLI, ANDHRA PRADESH
11 documents required · 10 mandatory · 1 optional
₹478
₹13,479
12 Sept 2026
12 Sept 2026
12 Sept 2026
Earth work excavation and depositing on bank not less than one meter from the outer edges of the excavation, but shall be placed any where within 10mts.lead and 2mts. Lift as directed by the departmental officers in all soils up to excluding ordinary rock forming, whenever necessary dressing the bottom of foundations to level in all directions, well watered and thoroughly rammed before laying concrete etc., complete as per standard specification and as directed by the departmental officers.
Filling of foundations with Dust from including spreading in layers irrespective of thickness brough from approved source including cost and conveyance of all materials and all labour charges etc., complete as per standard specification referred and direction of the departmental officers.
Plain Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, Centering Charges etc., complete for finished item of work.
VRCC M- 20 grade mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Footings
VRCC M- 20 grade mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Pedestals
VRCC M- 20 grade mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for GL Beam
VRCC M- 20 grade mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Plinth Beam
VRCC M- 20 grade mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Columns
Refilling of excavated earth in foundations and trenches, sides of foundations and basement with intial lead in layers not exceeding 15cm thick consolidating each deposited layer by watering and ramming, including cost and conveyance of all materials to work site and all labour charges etc., complete for finished item of work
Fly ash cement/ lime solid blocks in C.M. (1:6) prop. of size 290mm x 225mm x 140mm including cost and conveyance of all materials to site, scaffolding charges, lifting charges, curing and labour charges for all items of works equipment and all other incidental and operational charges etc., complete as per standard specification referred and as per the direction of the departmental officers with required strength for Basement
Fly ash cement/ lime solid blocks in C.M. (1:6) prop. of size 290mm x 225mm x 140mm including cost and conveyance of all materials to site, scaffolding charges, lifting charges, curing and labour charges for all items of works equipment and all other incidental and operational charges etc., complete as per standard specification referred and as per the direction of the departmental officers with required strength Above Basement
Providing High Yield Strength Deformed steel bars (Fe 500 grade) of different diameters, including labour charges for cutting, bending to required sizes and shapes placing in position with cover blocks of approved materials and size and tying with binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, welded joints, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc., complete for finished item of work
Filling of foundations with Gravel from including spreading in layers irrespective of thickness brough from approved source including cost and conveyance of all materials and all labour charges etc., complete as per standard specification referred and direction of the departmental officers.
Flooring with Vertified Tiles of 1st. quality of any shade as approved by Engineer - in - charge set over a base coat of CM (1:8) 12mm thick laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sqm and jointed with neat white cement paste to full depth mixed with pigment of matching shade including cost of all materials like cement, sand, water, ceramic tiles etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, curing, lift charges etc., complete for finished item of work. Excluding cost of CC bed & Conevyance of all materials BLD CSTN 7.5
Plastering 12mm thick in single coat in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work
Painting to new walls with 2 coats of Plastic Emulsion Paint of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls
Supply and fixing of M.S. Pipes including all labour charges, and all incidental charges etc., complete for finished item of work
Painting two coats with synthetic enamel paint first grade to new iron work including one coat of red oxide paint for New Iron work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work.
Roofing With 0.5mm thick galvanized /pre painted G.I profiled sheets with crimp of 200mm length fixed to the purlins With 14 size self drilling with neoprene washer Side laps are stiched with self tapping drilling screws .End laps are to be sealed with 25x3 mm Butyl tape .the sheets are provided with anti capillary groove.including cost and labour charges etc., complete as per standard specification for finished item of work.
Door Frame section of 45x75 MM. The two Vertical members are to be joined together with the horizontal member using 8x50 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to the wall using hold fast or bolt fasteners. A minimum of 4 No.s of screws to be provided for each vertical member & minimum 2no.s for horizontal member.
Providing and fixing 28 -30 MM thick solid Wood Polymer Composite(WPC) single extruded door shutter with 3MM top and bottom rigid layer with an overall density of 750kg/Cum. It will be fixed to the frame using 3 inch /4 inch hinges. A minimum of 4 hinges will be required for fixing the door with the frame
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
04 Sch A.xlsx
TENDER_DOCUMENT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .