Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹35.7 L+₹1.3 L (3.87%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹36.0 L+₹1.6 L (4.73%)Admitted-Fee/PreQual/Technical/Finance 22 830 KALLAI POST KOZHIKODE 673005 | KOZHIKODE | KOZHIKODE | KERALA | 673005 | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹37.4 L+₹3.0 L (8.72%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹39.5 L+₹5.1 L (14.9%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | P K AYOOB L2 | FASIL K V L4 | ABDUL ALTHAF L1 | MALABAR UNION LABOUR CONTRACT CO-OPERATIVE SOCIETY LTD L3 | JOSHY K G L5 |
|---|---|---|---|---|---|---|---|---|
| 1.001 | ||||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 162.45 | cum | 206.79 ₹33,593.04 | 216.43 ₹35,159.05 | 279 ₹45,323.55 | 170 ₹27,616.5 Lowest | 228 ₹37,038.6 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 35.78 | cum | 6,367.47 ₹2,27,853.55 | 6,664.37 ₹2,38,477.82 | 6,000.3 ₹2,14,714.74 Lowest | 6,700 ₹2,39,752.8 | 7,034 ₹2,51,704.66 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 56.32 | cum | 8,418.9 ₹4,74,118.77 Lowest | 8,811.55 ₹4,96,231.25 | 9,500.4 ₹5,35,024.53 | 9,000 ₹5,06,844 | 9,300 ₹5,23,738.8 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 166.8 | sqm | 612.3 ₹1,02,131.64 | 640.89 ₹1,06,900.45 | 216 ₹36,028.8 Lowest | 500 ₹83,400 | 676 ₹1,12,756.8 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 7,885.56 | kilogram | 90.24 ₹7,11,592.93 | 94.45 ₹7,44,791.14 | 63 ₹4,96,790.28 Lowest | 79 ₹6,22,959.24 | 100 ₹7,88,556 |
| 1.01 | OD19987/2026-2027:Dry rubble masonry with hard stone in foundation and plinth including levelling upto plinth level: | 370.04 | cum | 3,205.42 ₹11,86,146.44 Lowest | 3,354.88 ₹12,41,453.21 | 3,600 ₹13,32,158.4 | 3,700 ₹13,69,162.8 | 3,541 ₹13,10,325.8 |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 357.75 | cum | 255.6 ₹91,440.9 | 267.55 ₹95,716.01 | 369 ₹1,32,009.75 | 100 ₹35,775 Lowest | 282 ₹1,00,885.5 |
| 1.01 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 85.27 | cum | 288.7 ₹24,618.03 | 302.2 ₹25,769.2 | 216 ₹18,418.75 | 200 ₹17,054.4 Lowest | 319 ₹27,201.77 |
| 1.01 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 46.51 | cum | 105.1 ₹4,888.41 | 110.06 ₹5,119.11 | 180 ₹8,372.16 | 75 ₹3,488.4 Lowest | 116 ₹5,395.39 |
Tender Value
₹41.5 L
EMD Value
₹50,000
Closing Date
17 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive engineer
Office of the Executive Engineer, wayanad
SASCI-Fire station Panamaram-Construction of New building for Fire station at Panamaram (Retaining wall behind the building)-General Civil Work
2026_PWD_887356_1
PWD/BLDG/TR/7239/2026_5_1_1/2
Open Tender
Civil Works - Buildings
Item Rate
180 days
panamaram
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹50,000
Yes
19 Nov 2026
9 Nov 2026
19 Nov 2026
9 Nov 2026
17 Nov 2026
9 Nov 2026
60 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 11 | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 162.45 | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 35.78 | cum | - | - |
| 1.003 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 56.32 | cum | - | - |
| 1.004 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 166.8 | sqm | - | - |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 7,885.56 | kilogram | - | - |
| 1.006 | OD19987/2026-2027:Dry rubble masonry with hard stone in foundation and plinth including levelling upto plinth level: | 370.04 | cum | - | - |
| 1.007 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 357.75 | cum | - | - |
| 1.008 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 85.27 | cum | - | - |
| 1.009 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 46.51 | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1514424.xls
BOQ • 0.31 MB
BIDSA.pdf
Tender Documents • 3.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .