| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 CrAccepted-AOC | ₹6.3 Cr Quoted ₹6.4 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹6.6 Cr+₹25.3 L (3.97%)Rejected-Finance KARUR | ₹6.6 Cr+₹25.3 L (3.97%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | SRISURYAASSOCIATES L1 | Sri Navaladiyar And Co L2 |
|---|---|---|---|---|---|
| 1.001.Strengthening the Road From Kulithalai Manaparai road To Kottamedu AD Colony Road Km 0/0-1/00 (R-49) | |||||
| 2.00 | Clearingthe Scrub jungle including all labour charges for burrying and burning etc., | 1,200 | Sqm | 6 ₹7,200 Lowest | 6 ₹7,200 Lowest |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning including etc complete | 1,000 | Cum | 23 ₹23,000 Lowest | 23 ₹23,000 Lowest |
| 4.00 | Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. K Km Km 1/0-2/0 & 3/0 -4/650 | 300 | Cum | 354 ₹1,06,200 Lowest | 354 ₹1,06,200 Lowest |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 450 | Cum | 2,916 ₹13,12,200 Lowest | 2,918 ₹13,13,100 |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 3,000 | Sqm | 88 ₹2,64,000 Lowest | 88 ₹2,64,000 Lowest |
| 7.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 3,000 | Sqm | 21 ₹63,000 Lowest | 21 ₹63,000 Lowest |
| 8.00 | Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 75 | cum | 12,955 ₹9,71,625 Lowest | 12,961 ₹9,72,075 |
| 9.00Construction of slab RCC slab culvert CH 0/400 Strengthening the Road From Kulithalai Manaparai road To Kottamedu AD Colony Road | |||||
| 10.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A Km 1/0-2/0 & 3/0 -4/650 | 23.75 | Cum | 260 ₹6,175 Lowest | 260 ₹6,175 Lowest |
Tender Value
₹6.5 Cr
EMD Value
₹6.5 L
Closing Date
30 Jul 2025, 3:00 pmClosed
District Collector/Chairman
IInd Floor, DRDA, Collectorate
Improvement of 7 Rural Roads of length 11.73 Km in 3 No of road in Krishnarayapuram and 4 Nos of road in Kulithalai block of Karur district under SASCI 2025-26
2025_RDTN_585601_3
Karur District - Special Assistance to States for Capital Investment (SASCI) - 2025-26
Open Tender
Civil Works - Roads
Item Rate
180 days
IInd Floor, DRDA, Collectorate
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹6.5 L
28 Aug 2025
30 Jul 2025
30 Jul 2025
30 Jul 2025
30 Jul 2025
30 Jul 2025
Amount
1.Strengthening the Road From Kulithalai Manaparai road To Kottamedu AD Colony Road Km 0/0-1/00 (R-49)
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning including etc complete
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. K Km Km 1/0-2/0 & 3/0 -4/650
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Construction of slab RCC slab culvert CH 0/400 Strengthening the Road From Kulithalai Manaparai road To Kottamedu AD Colony Road
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A Km 1/0-2/0 & 3/0 -4/650
Cement concrete 1;4;8Mix using 40mm Metal including cost and conveyence all labour charges
Supplying and erecting centering shuttering including neccesary supports for plane surface below GL
Cement concrete 1;3;6Mix using 40mm Metal including cost and conveyence all labour charges
Supplying and fabrication of steel including cost and conveyence of all charges
Cement concrete 1;1:5;3Mix using 20mm Metal including cost and conveyence all labour charges
Construction of slab RCC slab culvert CH 0/490 from Kulithalai Manaparai road To Kottamedu AD Colony Road
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A Km 1/0-2/0 & 3/0 -4/650
Cement concrete 1;4;8Mix using 40mm Metal including cost and conveyence all labour charges
Supplying and erecting centering shuttering including neccesary supports for plane surface below GL
Cement concrete 1;3;6Mix using 40mm Metal including cost and conveyence all labour charges
Supplying and fabrication of steel including cost and conveyence of all charges
Cement concrete 1;1:5;3Mix using 20mm Metal including cost and conveyence all labour charges
Road Marking with hot applied thermoplastic compound with reflectorising Glass Beads on Bituminous surface Km 1/0-2/0 & 3/0 -4/650
Provision for 90cm Equilateral Triangle Board
Provision For Road Stud with Lens Reflector
Cost of KM Stone ( 1110x350x250mm)
Cost of HM Stone ( 650x150x100mm)
2.Strengthening the Road From Sengulam to Komaliparai Road Km 0/0-1/400 (R-156)
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning including etc complete
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A Km 1/0-2/0 & 3/0 -4/650
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. K Km Km 1/0-2/0 & 3/0 -4/650
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with hot applied thermoplastic compound with reflectorising Glass Beads on Bituminous surface Km 1/0-2/0 & 3/0 -4/650
Provision for 90cm Equilateral Triangle Board
Provision for 90cm chevaran octagan Board
Provision For Road Stud with Lens Reflector
Cost of KM Stone ( 1110x350x250mm)
Cost of HM Stone ( 650x150x100mm)
3.Strengthening the Road From Thannerpalli Sivayam Road KM 0/3 of Thakkamadai Road Km 0/0-2/300 (R-171)
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning including etc complete
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A Km 1/0-2/0 & 3/0 -4/650
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. K Km Km 1/0-2/0 & 3/0 -4/650
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Construction of slab RCC slab culvert @ (Km 1/0-2/0) from Thannerpalli Sivayam Road KM 0/3 of Thakkamadai Road
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A Km 1/0-2/0 & 3/0 -4/650
Cement concrete 1;4;8Mix using 40mm Metal including cost and conveyence all labour charges
Supplying and erecting centering shuttering including neccesary supports for plane surface below GL
Supplying and erecting centering shuttering including neccesary supports for plane surface Above GL
Cement concrete 1;3;6Mix using 40mm Metal including cost and conveyence all labour charges
Supplying and fabrication of steel including cost and conveyence of all charges
Reinforced Cement concrete 1;1:5;3Mix using 20mm Metal including cost and conveyence all labour charges
Cement concrete 1:2:4 Mix using 40mm Metal including cost and conveyence all labour charges
Road Marking with hot applied thermoplastic compound with reflectorising Glass Beads on Bituminous surface Km 1/0-2/0 & 3/0 -4/650
Provision for 90cm Equilateral Triangle Board
Provision for 90cm chevaran octagan Board
Provision For Road Stud with Lens Reflector
Cost of KM Stone ( 1110x350x250mm)
Cost of HM Stone ( 650x150x100mm)
4. Strengthening the Road From Seegampatti Kuttapatti Road Km 0/0-3/00 (R-82)
Picking 5 cm to 10 cm old metalled surface and sectioning including etc complete
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A Km 1/0-2/0 & 3/0 -4/650
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. K Km Km 1/0-2/0 & 3/0 -4/650
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with hot applied thermoplastic compound with reflectorising Glass Beads on Bituminous surface Km 1/0-2/0 & 3/0 -4/650
Provision for 0.60cm Equilateral triangle Cautionary sign board
Provision For Road Stud with Lens Reflector
Cost of KM Stone ( 1110x350x250mm)
Cost of HM Stone ( 650x150x100mm)
5.Strengthening the Road From kanakkapillaiyur to ellamadai Km 0/0-1/200 (R-123)
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A Km 1/0-2/0 & 3/0 -4/650
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. K Km Km 1/0-2/0 & 3/0 -4/650
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BC 25/30/40mm thick grade II using VG30 bitumen and plastic waste providing and laying bituminous concrete to 30/40mm thick
Road Marking with hot applied thermoplastic compound with reflectorising Glass Beads on Bituminous surface Km 1/0-2/0 & 3/0 -4/650
Provision for 0.90cm Equilateral triangle Cautionary sign board
Provision for 90cm chevaran octagan Board
Provision For Road Stud with Lens Reflector
Cost of KM Stone ( 1110x350x250mm)
Cost of HM Stone ( 650x150x100mm)
6. Strengthening the Road From vayalur devasingampatty road to Nadupatti Road Km 0/0-1/329 (R-197)
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning including etc complete
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A Km 1/0-2/0 & 3/0 -4/650
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. K Km Km 1/0-2/0 & 3/0 -4/650
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BC 25/30/40mm thick grade II using VG30 bitumen and plastic waste providing and laying bituminous concrete to 30/40mm thick
Road Marking with hot applied thermoplastic compound with reflectorising Glass Beads on Bituminous surface Km 1/0-2/0 & 3/0 -4/650
Provision for 0.90cm Equilateral triangle Cautionary sign board
Provision for 90cm chevaran octagan Board
Provision For Road Stud with Lens Reflector
Cost of KM Stone ( 1110x350x250mm)
Cost of HM Stone ( 650x150x100mm)
7. Strengthening the Road From Manavasi modakkusalai to KM 2/4 Of Mayanur sengal Road ( Mangamma Road ) Km 0/0-1/500 (R-384)
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning including etc complete
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A Km 1/0-2/0 & 3/0 -4/650
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. K Km Km 1/0-2/0 & 3/0 -4/650
Construction of granular subbase by providing well graded Material 25mm to 4.75mm IRC HBG Metal @65% 4.75 to 2.36mm IRC HBG Metal
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying 50mm consolidated Bituminous maccadam thick using 0.20cum of 26.50mm. 13.20 cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Construction of Retaining wall @ Manavasi modakkusalai to KM 2/4 Of Mayanur sengal Road
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A Km 1/0-2/0 & 3/0 -4/650
Cement concrete 1;4;8Mix using 40mm Metal including cost and conveyence all labour charges
Supplying and erecting centering shuttering including neccesary supports for plane surface below GL
Supplying and erecting centering shuttering including neccesary supports for plane surface Above GL
Cement concrete 1;3;6Mix using 40mm Metal including cost and conveyence all labour charges
Provision For weep hole Arrangements
Provision For Guard stone
Road Marking with hot applied thermoplastic compound with reflectorising Glass Beads on Bituminous surface Km 1/0-2/0 & 3/0 -4/650
Provision for 60cm Equilateral Triangle Board
Provision for 90cm chevaran octagan Board
Provision For Road Stud with Lens Reflector
Cost of KM Stone ( 1110x350x250mm)
Cost of HM Stone ( 650x150x100mm)
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Sri Navaladiyar And Co (BID ID -1416198)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .