Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical qualified |
| 2 | Accepted-Technical | Accepted-Technical qualified |
| 3 | Accepted-Technical 2 58 CIVIL LINE BHOTIYA PADAV HALDWANI NAINITAL | UDAM SINGH NAGAR | UTTARAKHAND | 244713 | Accepted-Technical qualified |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹56.6 L
EMD Value
₹1.1 L
Closing Date
17 Aug 2026, 5:00 pmClosed
Municipal Commissioner
nagar nigam haldwani-kathgodam
CONSTRUCTION OF HIGH-TECH TOILET AT RAJPURA DHOBI GHAT HALDWANI UTTRAKHAND
2026_MCNNK_98180_1
967/26-27/1
Open Tender
Civil Works
Item Rate
180 days
haldwani
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Municipal Commissioner Nagar Nigam
₹1.1 L
18 Sept 2026
28 Jul 2026
18 Aug 2026
28 Jul 2026
17 Aug 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | - | Cum | 260.3 | - |
| 1.2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size). | 7.33 | Cum | 7,294.7 | ₹53,470.15 |
| 1.3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 1 | Cum | 9,045.75 | ₹9,036.7 |
| 1.4 | Reinforced cement concrete work in walls (any thickness), includingattached pilasters, buttresses, plinth and string courses, fillets, columns,pillars, piers, abutments, posts and struts etc. above plinth level up tofloor five level, excluding cost of entering,shuttering, finishing andreinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stoneaggregate 20 mm nominal size) | - | Cum | 10,852.95 | - |
| 1.5 | Brick work with common burnt clay modular bricks of class designation7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | 1 | Cum | 6,504.9 | ₹6,498.4 |
| 1.6 | Brick work with common burnt clay machine moulded perforated bricks of class designation 12.5 conforming to IS: 2222 in superstructure above plinth level up to floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) :With Modular brick | 1 | Cum | 8,942.35 | ₹8,933.41 |
| 1.7 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1:4 (1 cement :4 coarse sand) | - | Sq.m. | 1,123.8 | - |
| 1.8 | Providing and laying Gypsum panel partitions 100 mm thick with water proof Gypsum panels of size 666x500x100 mm, made of calcite phosphor Gypsum fixed with tongue and groove edges and jointed with bonding plaster asper manufacturer’s specifications in superstructure above plinth level up to floor V level. Gypsum blocks will have a minimum compressive strength of 9.3 kg/cm2 | - | Sq.m. | 1,023.6 | - |
| 1.9 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) | 1 | Sq.m. | 357.35 | ₹356.99 |
| 2 | Providing and fixing 12 mm thick prelaminated particle board flat pressed three layer or graded wood particle board conforming to IS: 12823 Grade l Type ll, in panelling fixed in aluminum doors, windows shutters and partition frames with C.P. brass / stainless steel screws etc. complete as per architectural drawings and directions of engineer in-charge. Pre-laminated particle board with decorative lamination on one side and balancing lamination on other side | - | Sq.m. | 1,139.3 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
ToiletRajpuradhobighat.pdf
Tender Documents • 1.51 MB
BOQ_115873.xls
BOQ • 0.27 MB
corrigedamBOQWITHTAX.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .