| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹8.4 L+₹1.6 L (24.2%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹4.8 L
EMD Value
₹9,600
Closing Date
4 Dec 2020, 5:00 pmClosed
Executive Engineer, HPPWD Division Sangrah
Executive Engineer, HPPWD Division Sangrah
C/O PWD Office building at Sangrah (SH C/O PCC R/Wall in Front of office building and Type-ll Qtr. at Sangrah)
2020_PWD_42635_7
Sangrah 7487-7537 dated 10.11.2020
Open Tender
Civil Works
Item Rate
90 days
Sangrah
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹9,600
29 Jan 2021
20 Nov 2020
5 Dec 2020
20 Nov 2020
4 Dec 2020
20 Nov 2020
Amount
Excatation in soil in hilly area in all depths using all means as per drawing and technical specification ministry of Rural Development for rural roads August 2004 (Two thousands four) clause 305.1 (three hundred five point one) including setting out, coustruction of shoring and bracing, removal of stumps and other deleterious materials including dressing of sides and bottom and back filling in trenches with excavated suitable materials and stacking of materials useful for construction at suitable sites and safe dispoal of unsuitable cut materials by all modes of transportations in all leads and lifts at specified places in specified manner, systematically with level consideration to avoiding adverse effects on environment, trimming filling of unevenness blind age and finishing of the road to specified dimension or as directed by the Engineer-in-charge. any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases.
Earth work in excavation for structures in all depths as per drawing and Technical specification of Ministery of Rural Development for rural roads August 2004 (Two thousand four) C-305-1(Clause-three hundred five point one) including setting out construction of shoring and bracing, removal of stumps and other deleterious materials including dressing of sides and botttom and back filling in tranches with excavated suitable materials all work of rock cutting by blasting shall be carried out by taking all necessry precaution against soil erosion damages to hill side water pollution etc. and to protect stability of hill side rock shall be excavated with chiesling and wedging out rock (where blasting is prohibited) all earth work in cutting.excavation including rock excavation shall be carried out true to lines grades,side slopes, width, camber super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials by all modes of transportations in all leads and lifts at specified places, in specified manner systemathically with due consideration to avoiding adverse effects on environment, trimming filling of unevenness blind age and finishing of the road to specified dimension to the entire satisfaction as directedby the Engineer-in-charge. If the foundatioin of the structure is in an area with stangnat water or water is met with in the excavation due to spring seepage rain and other courses it shall be remove by suitable diversion boilingout or pumping as directed and the area of foudation or embankment shall be kept dry any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases.
Providing and laying plain cement concrete 1:6:12 (One cement is to six sand is to twelve graded hard crushed stone aggregate nominal mix) mechanically mixed and vibrated in foudation or similar works complete works complete as per drawings and technical specification of ministery of rural Development for rural road August 2004(Two thousand four) clause 802-803, 1202 and 1203 (eight hundred two, Eight hundred three , One thousand two hundred two and one thousnad two hundred three) and curing complete including cost of form work and hauling/ carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire specifications as per direction of Engineer- in-Charge
Providing and laying cement concrete plain/reinforced concrete in open foundatiion and substructure upto all heights as per the drawing and techical specification clause 802-803 1202. &1203 in cement concrete 1:4:8 ( One cement: four sand: eight graded stone aggegate 40mm nominal size, including all leads,lifts and carriage of materials as per HP.PWD specification including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge
Back filling behind abutment, Wing wall &Return wall complete as per drawing and technical sepecification clause 1204.3.8 including carriage of materials with in all leads,lifts and other incidentals complete as per entire satisfaction of the Engineer-in-charge.
Providing weep holes in brick masonry/stone masonery plain/reinforced concrete abutment wing wall ruturn wall with 100mm dia PVC pipe extending throught the full width of the structure with slopes of i(V):20(H) towards drawing face complete as per drawing and technical specification clause 614,709,1204.3.7 . including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge .
VIJENDER SHARMA
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .