Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| Sl No | Description | Qty | Unit | REJI T.A L2 | Jayan V T L1 |
|---|---|---|---|---|---|
| 1.00Construction of Drain | |||||
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 28 | cum | 380 ₹10,640 | 371 ₹10,388 Lowest |
| 1.00 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 | 2.8 | cum | 7,741 ₹21,674.8 | 7,562 ₹21,173.6 Lowest |
| 1.00 | 12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204<br> For height upto 5 m <br> III. R.C.C grade M 20 | 14 | cum | 8,994 ₹1,25,916 | 8,785 ₹1,22,990 Lowest |
| 1.00 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 | 0.6 | cum | 8,503 ₹5,101.8 | 8,305 ₹4,983 Lowest |
| 1.00 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 0.94 | tonne | 86,797 ₹81,415.59 | 85,000 ₹79,730 Lowest |
| 1.01 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.05 | tonne | 86,376 ₹4,146.05 | 85,000 ₹4,080 Lowest |
| 1.01 | 3.15.2:Compacting Original Ground<br> (ii) Compacting original ground supporting subgrade<br> Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | 25.2 | cum | 59 ₹1,486.8 | 58 ₹1,461.6 Lowest |
| 1.01 | OD202732/2026-2027:Filling with Quarry Muck
Filling up low lying and water logged areas with local material/ quarry muck, spreading in
layers, leveling the top at site and consolidation by ramming, etc complete for improving the
CBR value of subgrade | 42 | cum | 815 ₹34,230 | 800 ₹33,600 Lowest |
| 1.01 | 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil. | 16.8 | cum | 2,137 ₹35,901.6 | 2,087 ₹35,061.6 Lowest |
Tender Value
₹6.1 L
EMD Value
₹15,341
Closing Date
29 Oct 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Asst.Engineer LSGD section cherpu gp
Asst.Engineer LSGD section cherpu gp
Annual Plan-Cherpu GP 2026-27 PRO.NO. 147/2026-27 -Ceramic road maintenance ward 3
2026_LSGD_880654_1
159/ETR2/AELSGD/CHP/12/2026
Open Tender
Civil Works - Roads
Item Rate
CHERPU
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,355
Yes
₹15,341
Yes
10 Nov 2026
22 Oct 2026
31 Oct 2026
22 Oct 2026
29 Oct 2026
22 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Drain | |||||
| 1.001 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 28 | cum | - | - |
| 1.002 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 | 2.8 | cum | - | - |
| 1.003 | 12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204<br> For height upto 5 m <br> III. R.C.C grade M 20 | 14 | cum | - | - |
| 1.004 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 | 0.6 | cum | - | - |
| 1.005 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 0.94 | tonne | - | - |
| 1.006 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.05 | tonne | - | - |
| 1.007 | 3.15.2:Compacting Original Ground<br> (ii) Compacting original ground supporting subgrade<br> Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | 25.2 | cum | - | - |
| 1.008 | OD202732/2026-2027:Filling with Quarry Muck
Filling up low lying and water logged areas with local material/ quarry muck, spreading in
layers, leveling the top at site and consolidation by ramming, etc complete for improving the
CBR value of subgrade | 42 | cum | - | - |
| 1.009 | 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil. | 16.8 | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
afdvt.pdf
Tender Documents • 0.24 MB
epay.pdf
Tender Documents • 0.23 MB
fot.pdf
Tender Documents • 0.25 MB
remit.pdf
Tender Documents • 0.26 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 1.98 MB
agt.pdf
Tender Documents • 0.25 MB
BOQ_1497682.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .