Loading…
Loading…
Tender Value
Refer Docs
Closing Date
1 Sept 2026, 3:00 pm
NIREEKSHANA RAO K
GAIL Jubilee Tower, Sector-1, Noida- 201301, State Uttar Pradesh, India
ARCHITECTURAL CONSULTANCY, CONSTRUCTION SUPERVISION SERVICES AND LIAISONING WITH STATUTORY BODIES FOR CONSTRUCTION OF INTEGRATED RESIDENTIAL TOWNSHIP AND OTHER FACILITIES AT GAIL USAR, MAHARASHTRA
2026_GAIL_286994_1
GAIL/NOIDA/CnP/CIVIL/26-41
Open Tender
Consultancy
Item Rate
1350 days
As mentioned in SoW
As per tender
9 documents required · 9 mandatory
₹0
Exempted
Virtual mode through MS teams
11 Aug 2026
11 Aug 2026
2 Sept 2026
11 Aug 2026
1 Sept 2026
18 Aug 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Architectural Consultancy, Construction supervision services and Liasoning with Statutory Bodies for Construction of Integrated residential township & other facilities at GAIL, Usar | - | - | - | - |
| 2 | Percentage fees for the complete Architectural Consultancy services as stated in the Tender document including site data collection, concept development Engineering, Designing, Preliminary and detailed estimation, recommendations of award of works for various packages, GRIHA/ IGBC registration and documentation and final GRIHA/ IGBC certificate, if required and, review of residual engineering, if any, being carried out by the contractor, engineering coordination and discussions with GAIL, Terms and Conditions and details as laid down in the tender document listed in Terms of reference Clause C.1, Section V of the contract | 1 | LUMPSUM PERCENTAGE | 2,07,65,40,739.27 | ₹2,07,65,40,739.27 |
| 3 | Percentage fees for Project management and Construction supervision of work by deploying Technical manpower as per scope Terms and conditions and details laid down in the tender document in Terms of reference Clause C.2, Section V of the contract detailing the manpower to be deployed at site before arriving at rates. The manpower is to be deployed for a period of 36 months from the award of first package of the works tender. | 1 | LUMPSUM PERCENTAGE | 2,07,65,40,739.27 | ₹2,07,65,40,739.27 |
| 4 | Percentage fees for complete liasoning services for getting master plan approval and land conversion from Industrial to Residential from MIDC, building plan approval/ building construction commencement along with all applicable NoCs from respective Local/ State/ Central authorities/ agencies and getting occupation certificate/ completion certificate along with all applicable NoCs from respective Local/ State/ Central authorities/ agencies as per scope Terms and conditions and details laid down in the tender document in Terms of reference Clause C.3, Section V of the contract. | 1 | LUMPSUM PERCENTAGE | 2,07,65,40,739.27 | ₹2,07,65,40,739.27 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tender.pdf
Tender Documents • 13.08 MB
BOQ_335134.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].