Karnataka Neeravari Nigam Limited
Sri.Ravi Arasikeri
Tank filling schemes
KNNL/2025-26/LI/WORK_INDENT3799/CALL-4
KNNL/2025-26/LI/WORK_INDENT3799/CALL-4
Open
Lift Irrigation Scheme
Two Tender Document System(Two Cover)
KNNL Division SLIS Div Dharwad
18 documents required · 18 mandatory
The intending Bidder should have successfully commissioned not less than 11/0.433 kv sub-station with minimum 2 Nos of 315 kVA capacity transformer & erection of not less than 11 kv SC Line for a length of 5.60 KM during the last 5 years (i.e. from 2021-22 to 2025-26) The necessary work done certificate issued by an officer not below the rank of Executive Engineer and countersigned by the Superintending Engineer of the same circle should be uploaded.
To qualify for award of this contract, each tenderer in his / her name in the last five years (2021-22 to 2025-26) should have satisfactorily completed (at least 90% of contract value) as a prime contractor, at least One lift irrigation / Tank filling scheme of value not less than Rs. 206.42 Lakhs (usually 50% of the amount put to tender under this contract). Work done certificate issued by an officer not below the rank of Executive Engineer of the concerned Division and Countersigned by the Superintending Engineer of the concerned circle is to be uploaded for the technical bid. The cost of completed works of the previous year shall be given a weightage of 10% per year to bring it to the price level of financial year in which tenders are invited.
For construction of Transmission line/Substation Works, the contractor shall engage only those agencies who are licensed to do the power line construction works in Karnataka. They should have constructed at least one similar single power line equal to 80% of the length of power line for the work tendered in a single contract. The details of the transmission line construction contractor with registration certificate and certificates of experience signed by an officer of not below the rank of Executive Engineer of KPTCL shall be submitted for KNNLs verification post award of the work.
A copy of the valid Karnataka PWD Class-1 (Civil) Registration Certificate.
The Bidder/ Tie up partner shall not be under Corporate Debt Restructuring (CDR) / Strategic Debt Restructuring (SDR) or Bureau of Industrial and Financial Reconstruction (BIFR) in the last 5 Years prior to bid submission date. In this regard, the Bidder shall submit along with Bid, a certificate from their Statutory Auditor with a declaration that, the Bidder is not under CDR / SDR or BIFR.
Each Tenderer should further demonstrate Availability by owning 50% of the required/specified flowing key and critical equipment for this work and the remaining 50% can be deployed on lease/hire basis for all works provided, the relevant documents (Commitment agreements etc.) for availability for the work are furnished (Documents to be scanned and enclosed)The intending bidder/firm/company should furnish details of ownership/ lease certificate of the following minimum requirement of machineries.i)Excavator-1 No Own & 1 No Hire/Lease ii)Tipper- 1 No Own & 1 No Hire/Lease iii)Concrete mixer- 1 No Own & 1 No Hire/Lease iv)Crane-Capacity 8 Tonnes & above - 1 No Hire/Lease
The intending Bidder / Tie-up partner should have supplied and successfully commissioned at least 3 numbers of Submersible Centrifugal or VT Pumps with a capacity (flow rate) not less than 0.07 cumecs for each pump with a head not less than 49.0 m for each pump during the last 5 years (i.e., from 2021-22 to 2025-26). The necessary work done certificate issued by an officer not below the rank of Executive Engineer and countersigned by the Superintending Engineer of the same circle should be uploaded.
Tenders from a Tie-up proposed in this bid, the bidder shall upload an agreement with only one pump manufacturer on Rs 500-00 stamp paper in the prescribed format which shall be concluded prior to the bidding and enclosed to the bid document. For proof of the Tie up, in the Technical bid, the prescribed format under section 2 instruction to bidder shall be followed (multiple tie up not allowed).
The scanned signature of the bidder /authorized representatives of the bidder shall be attached while uploading the bid document.
The intending bidder/firm/company should furnish list of Man power, machinery available with them for taking up the work
Technical details containing document with preliminary designs, working methodology in support of their bid as per the bidding document.
Copy of Valid GST Registration Certificate.
Copy of Valid Employees Provident Fund Registration Certificate.
Bids not satisfying minimum duty point parameters, efficiency parameters of pumps and motors and velocity parameters as specified in bid document shall be rejected.
The bidder should enclose the detailed methodology of execution of the scheme as per the scope of work.
Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will calculated as under-Assessed available tender capacity -AxNx1.5 - B, Where A -Maximum value of civil engineering works executed in any one year during the last five years (updated to 2026-27 price level) taking into account the completed as well as works in progress.N -Number of years prescribed for completion of the works for which tenders are invited.B -Value, at 2026-27 price level, of existing commitments and on going works to be completed during the Period of completion of the works for which Tenders are invited
Liquid asset and/or availability of credit facilities of not less than Rs.128.72 Lakhs (Unconditional credit lines/letters of credits/certificates from nationalized banks) for meeting the fund requirement etc. The contractor should upload necessary documents issued by the nationalized banks as per prescribed format enclosed as Annexure I to the notification.
The annual turnover from all classes of civil engineering works should be costing not less than Rs.825.66 Lakhs, (usually not less than two times the estimated annual payments under this contract) in any of the two financial years during the last five years (2021-22 to 2025-26). Audited profit and loss account certified by a practicing Chartered Accountant along with the copy of income tax returns filed for the years indicated above should be furnished. Duly mentioning UDIN on Turnover certificate (from CA). (The annual turnover of previous year shall be updated to the year of tender invitation at 10% per annum).
The intending bidders are advised to visit the site of work, make themselves familiar with local situation about the availability of construction materials, work men, land required for construction activities, etc.
₹5,000
₹5.3 L
17 Jun 2026
17 Jun 2026
30 Jun 2026
20 Jun 2026
20 Jun 2026
Filling up of additional 26 tanks under Shiggaon LI Scheme (Extension of Hotanhalli and Chandapur Tank Filling Scheme) Package-1 Pumping Machinery and construction of sum cum pump house and construction of substion and construction of tapping point and erection of 11kv Sc Line and O&M For 5 years on Turn key basis
Filling up of additional 26 tanks under Shiggaon LI Scheme (Extension of Hotanhalli and Chandapur Tank Filling Scheme) Package-1 Pumping Machinery and construction of sum cum pump house and constructi...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
DTP_Package-1_Hotanahalli Extension.docx
Tender Document • 20.47 MB
E- Bank Guarantee Reg.pdf
Tender Document • 1.06 MB
Arbitration clause.pdf
Tender Document • 0.36 MB
Hotanahalli Chandapura TFS Index Map R1.pdf
Tender Document • 7.16 MB
Royalty Rate_new.pdf
Tender Document • 3.35 MB
Debarment circular.pdf
Tender Document • 0.60 MB
Drawings package-1.pdf
Tender Document • 1.28 MB
FD 54 Exp12 2022.pdf
Tender Document • 0.46 MB
3799.pdf
pdf • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .