Loading…
Loading…
102 live69 closing this weekmost from Karnataka Neeravari Nigam Limited and Water Resources Department Karnataka
102 results • Latest
Repairs to main gate,outlet gates, Head walls of CD & outlets and repairs to CC lining in selcted reaches of Distributory No-1 under GLBC
Engaging of Hydraulic excavator and tractors for maintenance of canals for the year 2026-27
Repairs of damaged Head walls, Piers and Parapet walls of cross regulators, Culverts and outlets in the canal network coming under Ghataprabha subdivision
Annual Maintenance and minor repair works to Dhupdal Weir for the Year 2026-27
Annual maintenance to Dhupadal Colony and Inspection Bungalow for the year 2026-27
Repairs to Gates on Raibag High Level Distributory, Clearing Jungle and Removal of Silt in Selected Reaches of D Block canal and Other works
AME of Gurlapur GLBC Inspection Bunglow for the year 2026-27
AME of Raibag GLBC Inspection Bunglow and Colony for the year 2026-27
Repairs to Gate & Bed Lining in vulnerable reaches of Chinchali main canal and Other connected works.
Excavation of Silt and Removal of Jungle in selected reaches of Raibag dy from Km No. 8.000 to 15.000 for the year 2026-27
APPOINTMENT OF INTERNAL AUDITORS FOR THE FINANCIAL YEARS 2026-27 & 2027-28
Providing Vetrified Flooring for SE TCCC Office Yermarus Camp.
Improvements to SR Road from Chainage 5 km to 8 km in Dy 100 of TLBC.
Rising of Embankment on IP Side in Dy 102 from Chainage 5.50 Km to 7.50 Km of TLBC.
Removal of Silt in Dy 99 from Chainage 5.20 Km to 15.00 Km (in Selected Reaches) of TLBC.
Improvements to SR Road in Dy 102 from Chainage 8 km to 11 km (in selected Reaches) of TLBC.
Improvements to SR Road from Chainage 0 km to 1.6 km in Dy 99A of TLBC.
Rising of Embankment on IP Side in Dy 102 from Chainage 9 Km to 10.50 Km of TLBC.
Removal of jungle and silt in distributaries 10 and10A (in Selected reaches) of RDS canal and removal of jungle from Km 15 to 30 in RDS main canal (in Selected reaches) and construction of gauge room at Distributary 10A of Tq.Dist Raichur.
Removal of Silt in Dy 102 from Chainage 0 Km to 0.8 Km (in Selected Reaches) of TLBC.
Removal of Silt from Mile 127 to 130 (in selected reaches) of TLBC.
Removal of Silt and Jungle From Chainage 2.00 Km to 4.00 Km in Dy 100 of TLBC.
Removal of Jungle from Mile 112 to Mile 117 (in selected Reaches) of TLBC.
Removal of jungle and silt in distributaries 1,2,3 & 4 (Selected reaches) and RDS main canal from Km 0 to 15 km and repair of SR of RDS main canal from KM.0.0 to 15 (selected reaches) and construction of gauge room at Distributary 2 Tq.Dist Raichur.
Restoration of Rear head walls of Distributary No 6 of RDS Canal Tq.Dist Raichur.
Removal of jungle and silt in distributaries 10B,11 and 12 (in Selected reaches) of RDS main canal and removal of jungle from Km.30 to 43 in RDS main canal (in Selected reaches) and construction of gauge room at Distributary 11 of Tq Dist Raichur.
Removal of Silt in Dy 102 From Chainage 12.50 Km to 14.00 Km (in selected Reaches) of TLBC.
Removal of Jungle from Mile 117 to Mile 122 (in selected Reaches) of TLBC.
Removal of jungle and silt in distributaries 5,6 and 7 (Selected reaches) of RDS main canal and construction of gauge room at Distributary 6 of Tq Dist Raichur.
Construction of gauge room at Border of Karnataka at Km 42.50 of RDS Main Canal of Tq Dist Raichur.
Removal of Silt from PO. No.5 to Sub distributary 102/A/2 of Distributary 102/A of TLBC.
Removal of Jungle from Mile 122 to Mile 127 (in selected Reaches) of TLBC.
Repairs to Gauge Room at Mile 128 of TLBC.
Repairs of PO at ch 126 R/S and Removal of silt and jungle and improvement of SR in balance portion in Distributary 96 of TLBC (in selected reaches).
Reconstruction of CTC at Ch 54 and 87.5 Improvements of SR and removal of silt and jungle in distributary 94 under TLBC (in selected reaches)
Reconstruction of CTC at 5.15 and 10.05 km and Removal of silt and jungle in distributary 95 of TLBC(in selected reaches).
Construction of Compound wall in the premesis of Kallur camp under TLBC.
Improvements of Service Road, protective work and removal of jungle & silt in Sub-Disty 98/4L &98/5L in Distributary of 98 of TLBC(in selected reaches)
Repair of pipe outlets ,Removal of silt and jungle from km 0.00 to 15.00 and improvement of service road from km 14.00 to 15.00 of distributary 98 0f TLBC (in selected reaches)
Construction of Retaining wall in distributary 98 for embankment reaches to avoid overflow at PO 13A and gate repairs under TLBC.
Improvements of Service road and removal of jungle & silt in Sub- Disty 98/2L & 98/3L and construction of CTC at ch 1.00 in 98/2L in Distributary of 98 of TLBC (in selected reaches)
Renovation of AEE Quarters in Kallur camp under TLBC.
Renovation of D-type Quarters in the premises of Kallur camp.
Improvements of Service road and removal of jungle & silt in distributary of 98 A & 98 B of TLBC(In selected reaches)
Supply of Computer Operator, Driver and D-Group workers for annual maintenance of Division office and 03 Sub division offices for the year 2026-27 under DRP Division Shikaripura (From 01-04-2026 to 31-03-2027)
Facility Management Services - LumpSum Based - Office of the Executive Engineer KNNL GRBCC Dn No 5 Koujalagi; Computer operator 01 nos Driver 01 nos and 02 Group d and for a period of 1st April 2026 to 31st March 2027; Consumables to be provided by b..
Facility Management Services - LumpSum Based - Office of the Executive Engineer KNNL GRBCC Dn No 5 Koujalagi; Computer operator 06 nos Driver 04 nos and 06 Group d and for a period of 1st April 2026 to 31st March 2027; Consumables to be provided b..
Consultancy services for Detailed Survey, Investigation, preparation of design, drawings, estimates, Detailed Project Report, Package Estimate, DTP and LAQ proposals for intake structure, pumping machineries, electrical works, delivery chamber, raising main with surge protection works etc. with detailed cost estimates for supplement the water to suffering atchkat area (around 927.70 acres) of Sub Distributary D25/11 and tailend portion of Distributary 25 of TLBC by Lifting Water from Tungabhadra River near Mustoor-daggi Villages in Karatagi taluk of Koppal District
Providing Computer Operators and Driver Employee services on Contract Basis to offices of Assistant Executive Engineer, KNNL, HBC Sub Division No-1 Athani Camp Tikota for the year 2026-27
Providing Computer Operators, Drivers and Group D Employee services on Contract Basis to offices of Assistant Executive Engineer, KNNL, GRBCC Sub Division No-10 Ainapur and Assistant Executive Engineer, KNNL, HBC Sub Division No-3 Hipparagi for the year 2026-27