Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
89 live60 closing this weekmost from Karnataka Neeravari Nigam Limited and Water Resources Department Karnataka
89 results • Latest
Providing Computer Operator, Driver and Group-D Workers to SLIS Division No.1, Office and Sub Division No-1, Singataluru, Canal Sub Division No-2 Mundaragi, Sub Division No-3 Alawandi, Sub Division Gadag Branch, Gadag, R&R Sub Division, Mundaragi of SLIS for the Year 2026-27 on Out Source Basis
Reconstructin of Rear & Front head walls from 1 to 7 minor in 3rd zone under DBC.
Construction of Compound wall and Drain around Nallur Samudaya Bhavana at Nallur village under Channagiri constituency Bhadra project
Manning Operation and Maintenance of Substations, Pump houses, Jack wells in Stage-1 Halasabalu, Stage-2 Mallashettihalli & Haluvarthi and Monitoring of Raising / Gravity Pipelines up to Terminal Tanks in Rajanahalli Lift Irrigation Scheme in Davanagere Dist. under KNNL for the year 2026-27.
Facility Management Services - LumpSum Based - Office of the Executive Engineer KNNL, Kalsa Project Division Khanapur Belagavi; DEO 02 Nos and Driver 02 Nos and Group D 04 Nos; Consumables to be provided by buyer
Supply of various categories of manpower (Group-D (Attender/ Watchman) and Computer Operator/Typist ) through Manpower agency required for Annual maintenance of office at Quality Control Division Shivamogga and Sub-division offices at No.3 Gajanuru, Bhadravati, Ranebennuru and no.1 Siddapura for the year 2026-27.
AME of Providing Man power for the Maintenance work of Varahi Diversion Weir at Horribbe site near Siddapura for the year 2026-27
Repairs to damaged roofing sheets provided to hoisting arrangements of canal sluice gates at Varahi diversion weir at Horiabbe in Hoasanagadi Village, Kundapur Taluk. Udupi District
AME of Providing Man power for Water Management from ch.0.00 to 18.725km of Varahi Right Bank Common Canal for the year 2026-27
AME of Providing Man power for Water Management from ch.38.00 to 43.694km (including Canal Syphon at ch. 37.498km) of Varahi Left Bank Canal for the year 2026-27
Earthwork excavation, formation of embankment, providing lining to canal damaged portion due to rain flooding and control of seepage to adjacent affected land, improvements to S.R and I.P side of the canal Repairs and improvements to the damaged canal structures of Direct minor 25, box culvert in Sub dy-3 their corresponding CD works of Sub Distributary-3 canal under UTP Canal network.
Earthwork excavation, formation of embankment ,providing lining to canal damaged portion due to rain flooding and control of seepage to adjacent affected land, improvements to S.R and I.P side of canal ,Repairs and improvements to the damaged canal structures of Minors 5, 6 & 7 (Proposed minors 12, 13 and 14 under Dy-3 & Minor-7 under Dy-1) and their corresponding CD works of Distributary-3 canal under UTP Canal network.
Restoration and Protection works to existing SP cum CTC at Ch 159.490 km & 160.200 km due to rain flooding and repairs of head regulator gate at ch 165.075 km and corresponding CD works under UTP Canal network (Proposed Canal Improvement from ch 166.000 to 166.390)
Earthwork excavation, formation of embankment, providing lining to canal damaged portion due to rain flooding and control of seepage to adjacent affected land, improvements to S.R and I.P side of canal ,Repairs and improvements to the damaged canal structures of UTP main canal from Ch 160.690 Km to Ch 161.450Km and Ch 167.500 Km to Ch 167.700 Km under UTP canal network.
Construction of draft canal to biduruhalla from Ch 0.00 to 570.00 mtr of Gopala colony in Tarikere taluk(570.00mtrs)
Protection work to Biduruhalla left side bank to Sy no.23 of Gopala Colony in Tarikere Taluk.
Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Tank Filling Scheme (Head Works consisting of construction of Intake forebay, Jack well cum pump house, Vertical Turbine Pumps coupled to Motors, Pump house electrical works, Necessary valves, Delivery Pipe, Manifold system, electrical panel, soft starter, capacitors, 33 kV transformer, 33/6.6 kV sub-station, Rising Main, Pressure Distribution) for Filling of MI/ZP tanks in Byadagi taluka by utilising and rejuvenating existing infrastructure of Guddadamallapura Lift Irrigation Scheme in Byadagi taluk of Haveri district including Operation and Maintenance for a period of 5 years after successful completion of work for GUDDADAMALLAPURA TANK FILLING SCHEME on Turn-Key Basis.
Supply of various catagories of man power like Computer operator and Group D for Office of Assistant Executive Engineer, KNNL, LIS, Sub division, Hangal coming under UTP division Ranebennur for the year 2026-27
Providing Watchman and Sowdies for water management of Madag Masur Tank for the year 2026 27 pertaining to LIS sub division Hangal under UTP Ranebennur division.
Providing Sowdies, Watchman for water management of Dharma canal network under Dharma project for the year 2026-27 pertaining to LIS sub division Hangal under UTP Ranebennur division
Construction of Concrete Road connecting the of Pump House of the Shiggaon Lift Irrigation Project in Savanur taluk of haveri District
Road work connecting the old Bankapura junction Road to the Pump-cum-Jackwell of the Shiggaon Lift Irrigation 13-Tank filling project in Shiggaon Taluk of Haveri District
Road improvement work from the power substation of the Shiggaon Lift Irrigation Project to Tevaramellihalli village in Savanur Taluk of Haveri District.
Hiring of Agency for IT Projects- Milestone basis
Construction of Samudaya Bhavan Near shree Yellappa Talawar house in Harobelavadi village of Dharwad taluk
AME of UTP Colony Honnali for the year 2026-27(January 2027 to March 2027)
Providing Irrigation Facility to 20 Beneficiaries farmers through Openwell of Gundewadi, Parthanahalli, Kiranagi, Balligeri, Malabad, Madabhavi, Anantapur, Chemakeri, Mole, Pandegaon, Hanamapur, Tavashi, Kalluti, Abbihal villages and providing Motors, Rising Main, Electricity Arrangements of Kagwad Constituency, Belgaum Dist.including construction of openwell, pipeline, pumping machineries, Electrical work successful testing and commissioning scheme including successful running and maintaining the unit two years on Turn key basis
Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Tank Filling Scheme Head Works consisting of construction of forebay, Jack well cum pump house, Vertical Turbine Pumps coupled to Motors, Pump house electrical works, Necessary valves, Delivery Pipe, Manifold system, electrical panel, soft starter,capacitors,11kV transformer,11/0.433 kV sub-station,11 kV power line and 11 kV Terminal bay, Rising Main, Pressure Distribution for Filling up of 9 Nos of MI/ZP tanks by lifting water from Malaprabha Right Bank Canal at Ch 129.000 Km near Savadi village in Ron Taluk, Gadag District including Operation and Maintenance for a period of 5 years after successful completion of work for RON TANK FILLING SCHEME on Turn-Key Basis
Providing Basic Aminities to Shri. Virupaksheswar Veerakt Math Located on the Bank of Thupparihalla Near Uppinbetgeri village of Dharwad Taluk
Construction of Raitha Bhavan near Dundi Basaveshwara Swami Temple in Gulgunji Koppada at Laxmeshwar, Gadag Dist
Maintenance of Roads, Drains, Water supply line and Public Buildings of Gummagola RC Center colony in Mundargi Taluk Gadag District for the year 2025-26.
Improvements of Office Road and Clearing of Jungle in AEE office colony at Singatalur for the Year 2025-26
Improvements of Distributaries Canal Nos 5, 7, 7A, 8 & 17 in Selected Reaches of RBC of HHP
Providing Labours for Maintaining Tank filling Schemes for the year 2025-26
SURVEY INVESTIGATION DESIGN SUPPLY ERECTION TESTING AND COMMISSIONING OF KALAGHATGI TANK FILLING SCHEME FOR FILLING UP OF 107 TANKS LOCATED ON LEFT BANK AND RIGHT BANK OF RIVER BY LIFTING WATER FROM BEDTHI RIVER IN KALAGHATAGI TALUK ON TURN-KEY BASIS PHASE 1 WORK CONSISTING OF FOLLOWING COMPONENTS CONSTRUCTION OF JACK WELL CUM PUMP HOUSE VERTICAL TURBINE PUMPS COUPLED TO HT MOTORS, POWER TRANSFORMERS 33 6.6 KV ELECTRICAL SUBSTATION 33 KV TRANSMISSION LINE AND 33 KV TAPPING POINT RISING MAIN PRESSURE DISTRIBUTION NETWORK FOR FILLING UP OF 30 TANKS ON LEFT BANK THROUGH MS HDPE PIPES WITH INSTALLATION OF SURGE PROTECTION SYSTEM INCLUDING OPERATION AND MAINTENANCE FOR FIVE YEARS AFTER SUCCESSFUL COMMISSIONING OF THE ENTIRE SYSTEM ON TURNKEY BASIS
Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Tank Filling Scheme (Head Works consisting of construction of Intake well, Jack well cum pump house, Vertical Turbine Pumps coupled to Motors, Pump house electrical works, Necessary valves, Delivery Pipe, Manifold system, electrical panel, soft starter, capacitors, 100 kVA transformer, 11 kV power line and Rising Main for Filling up of Kempkere Tank by lifting water from Shalmala halla in Hubli Taluk of Dharwad District. Including Operation and Maintenance for a period of 1 years after successful completion of work on Turn-Key Basis
Survey,Investigation,Design,Supply,Erection,Testing & Commissioning of Lift Scheme For Supplementing Water to the Suffering Atchkat in D-36 from ch 842 to ch 1280 (TEWC),Under TLBC by Lifting Water From Tungabhadra River Near Salagunda in Sindhanur TQ,Raichur Dist On Turnkey Basis,PHASE I WORK Comprising of Construction of Intake Structure,Jackwell cum Pumphouse, Pumping Machineries, 33/6.6kV Electrical Substation,33kV Transmission Line,110/33kV Transformer Bay with 33kV Terminal Bay Rising Main(2.74Km) Including Supply of Spare Parts & Tools, O & M for Five Years After Successful Commissioning of the Work Under Salagunda LIS Phase-I works on turnkey basis
Survey, Investigation, Design, Supply, Erection, Testing and Commissioning of Lift Scheme comprising of Construction of Bridge cum Barrage(BCB), Intake Structure, Pumping Machineries, 11/0.443Kv Electrical Substation, Transmission Line, Terminal Bay, Rising Main, Delivery Chamber, for Supplementing Water to the suffering atchkat of tail End portion of Sub Distributary 54/3R of Distributary-54 under TLBC by Lifting water from Sindhanur Halla near Mullur Village in Sindhanur Taluk, Raichur District including supply of spares parts and tools, O&M for five years after successful commissioning of the work for Sindhanur LIS Cum BCB works on Turnkey Basis.
Diversion of Flood water from Maski nala to Kanakanala Valley near Aryabhogapura Village, Kustagi Taluk, Koppal District and Modernization of Kanakanala Project.