Loading…
Loading…
96 live69 closing this weekmost from Karnataka Neeravari Nigam Limited and Water Resources Department Karnataka
96 results • Latest
Providing Computer Operators, Driver and D Group Employee services on Contract Basis to offices of Executive Engineer, KNNL, HBC division, Athani & Assistant Executive Engineer, KNNL, W&M Sub Division, Athani for the year 2026-27
Providing Computer Operators, Driver and D Group Employee services on Contract Basis to offices of Superintending Engineer, KNNL, KNNL R & R Circle, Athani for the year 2026-27
Facility Management Services - LumpSum Based - Office of the Executive Engineer KNNL MBC Division No 01 Gaddanakeri Camp Bagalkote; Services required fro a period from 1st April 2026 to 31st March 2027 for DEO 05 Nos and Driver 3 Nos and Group D ..
Improvements to road from Girish Gowda patil farm to Ghataprabha river in vantagudi village of Mudhol taluk under GRBC
Construction of SP/CTCs in Km-10, km-11 & km-12 of Avaradi Distibutary under G.R.B.C.
Construction of SP/CTCs in Km-2, km-3 and raising of embankment from 0.500 to 2.250 of Avaradi Distibutary under G.R.B.C.
Construction of SP/CTC in km 1.00 of Kulgod dy Under GRBC Main canal
Sub Estimate for Shifting of Electrical poles all along Bennihalla for safer execution of channelization and widening work of Bennihalla.
Facility Management Services - LumpSum Based - Office of the Executive Engineer KNNL GRBCC Division No 2 Hidkal Dam; Computer operators with relevant certificates 12 nos And Driver with HMV or LMV Licenses 04 Nos and Group D workers 07 Nos; C..
Consultancy services for Detailed Survey, Investigation, preparation ofdesign, drawings, estimates, Detailed Project Report, Package Estimate, DTP for intake structure, pumping machineries,electrical works,delivery chamber,raising main with surge protection works etc. with detailed cost estimates for supplement the water to suffering atchkat area around 3000 acres of tail end portion (beyond 3.25km) of Ittigi Branch of Sugur Distributory under RBLLC by Lifting Water from Tungabhadra River near Ittigi Village in Kampli taluk of Ballari District
Providing CC Lining and Improvements to Service Road for DP-32, DP-33, DP-34 & DP-35 under RBLLC of Ballari Dist.
Reconstruction of Structures and Improvements to Service Road for DP-30 & DP-31 under RBLLC of Ballari Dist.
Supplying and fixing new pump and motor in Kolur LIS D-7 under Tungabhadra RBHLC.
Improvement to Hagari Aqueduct K.m. 8.00 to 9.00 of distributary no 16(A) under RBHLC including Approches.
Improvements to Distry 14A of RBHLC from km 0.002 to 1.50 by constructing RCC Trough, CD Works, Pipe Outlets and Drops passing Ballari CMC.
Improvements to Canal network,Drops and Reconstruction of Head sluice,Bridge,Superpassage and other structural works of Tungabhadra RBHLC
Providing CC lining in between km 0.00 to 0.60 & improvements to structures in 2L minor under D 16 of RBHLC
Providing C.C lining and improvements to structures in 8L Minor of chaganur branch under D-14 of RBHLC
Improvement to Rupanagudi spring canal under D-16A of RBHLC in Ballari Tq
Providing cc lining & Improvements to structures in between at km 2.50 to 4.00 D 16A under RBHLC .
Repairs to structure and improvements to Service Road From Ch 0.00 KM to 3.00KM of Kuriganuru Distributory under RBLLC of Ballari Dist.
Providing CC Lining in between Km 9.10 to 10.80 under distributary no 16A of RBHLC including Improvements to structures.
Providing C.C lining and improvements to structures in 5TE Minor and 14L minor of B D halli branch under D-14 of RBHLC
Providing CC lining in between Km 21.50 to 22.00 under distributary no 16A of RBHLC including Improvements to structures.
Improvements to Yerramanahalla Pickup and Pickup Canal under D-15 of RBHLC
Providing CC lining and RCC trough to Jeeriganur canal and Repairs to Sluice gates of Daroji tank and Ayacut roads from Sy no 184 to Sy no 161, Sy no 382 to Sy no 373, Sy no 1084 to Sy no 636 and Sy no 65 to Sy no 262 of Daroji village in Sandur taluk.
Providing CC Lining and Reconstruction of Structures for Distributory No-5 and Distributory No-6 under RBHLC of Thimmalapura Ayacut roads from Sy no.135 to Veereshappa field, from Sy no. 164 to Banni mahankali temple of Yelubenchi village in Sandur taluk.
Providing Bitumen road to tank bund of Daroji tank and Ayacut road from survey no 585 to Madapura masjid and from Survey no 429 to Kampli road of Daroji village in Sandur Taluk.
Providing CC Lining and RCC Trough to Hosa Canal of Daroji tank and Ayacut roads from Sy no.196 to Huligamma field, from Sy no. 153 to Veerabadrappa field, Sy n.303 to Agasara bonesha of Yelubenchi village in Sandur taluk
Providing UW Cementitious Grout, Deeper Cavity Filling & UW Pointing to the balance Portion of Bhadra Dam on Upstream Side from Level 2066 ft to 2000 ft & Reaming of Porous Holes, Foundation Drainage Holes, Stability & Resetting of Saddle 1 &2. 2) Construction of CC Roads & Drain works at Bhadra Dam premises. 3) Replacement of electrical cables for operation of gates & in drainage gallery. 4) Catwalk connecting spillway piers/abutments at trunnion platform level of Bhadra Dam on Upstream side of Bhadra Reservoir (Part A)
PROVIDING INTERIORS AND FURNITURES TO VVIP GUEST HOUSE AT KAILASA, MUNIRABAD.
CONSTRUCTION OF APPROACH ROAD, RCC DRAIN, LANDSCAPE DEVELOPMENT WORKS, VEHICULAR PARKING AND STREET LIGHT WORKS FOR VVIP GUEST HOUSE AT KAILASA, MUNIRABAD IN KOPPAL TALUK & KOPPAL DISTRICT.
PACKAGE NO.3 A) Improvement of road connecting from Belagali Mahalingpur main road ( Dwarabagilu ) to Belagali Nandaganv road ( Banada vasti road ) 4.164 km length. B)Improvement of road connecting from Belagali- Nandaganv road to Akkimaradi- Mahalingpur road 4.0 km length for Balance Portion
SURVEY INVESTIGATION DESIGN SUPPLY ERECTION TESTING AND COMMISSIONING OF KALAGHATGI TANK FILLING SCHEME FOR FILLING UP OF 107 TANKS LOCATED ON LEFT BANK AND RIGHT BANK OF RIVER BY LIFTING WATER FROM BEDTHI RIVER IN KALAGHATAGI TALUK ON TURN-KEY BASIS PHASE 1 WORK CONSISTING OF FOLLOWING COMPONENTS CONSTRUCTION OF JACK WELL CUM PUMP HOUSE VERTICAL TURBINE PUMPS COUPLED TO HT MOTORS, POWER TRANSFORMERS 33 6.6 KV ELECTRICAL SUBSTATION 33 KV TRANSMISSION LINE AND 33 KV TAPPING POINT RISING MAIN PRESSURE DISTRIBUTION NETWORK FOR FILLING UP OF 30 TANKS ON LEFT BANK THROUGH MS HDPE PIPES WITH INSTALLATION OF SURGE PROTECTION SYSTEM INCLUDING OPERATION AND MAINTENANCE FOR FIVE YEARS AFTER SUCCESSFUL COMMISSIONING OF THE ENTIRE SYSTEM ON TURNKEY BASIS
Estimate for checking health status of spillway gates and its embedded parts of hagaribommanagalli dam
Estimate to check health status of spillway gates and its embedded parts, dam break analysis, EAP& O&M manual of Narihalla dam
Reconstruction of Pipe outlets, guide wall, Providing gates, Repair of UTs and removal of silt and jungle in M1 and M2 distributory under RBLLC
Clearing of jungle at spillway and embankment portion and repair to toe darin, surface drain and V notech of hagaribommanahalli dam
Improvements to kamalapur tank & Allikere tank and repair to sluice gates
Repairs to Electrical system, and refilling of Fire Extinguisher Arrangements of Hagaribommanahalli Dam (ST)
Improvements to Ayacut roads under command area of D5 and D6 of RBHLC in Sandur taluk
Improvements to Service Road from 0.00 to 6.50 Km of M2 Distributary of RBLLC under Kampli Constituency
Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Tank Filling Scheme Head Works consisting of construction of forebay, Jack well cum pump house, Vertical Turbine Pumps coupled to Motors, Pump house electrical works, Necessary valves, Delivery Pipe, Manifold system, electrical panel, soft starter,capacitors,11kV transformer,11/0.433 kV sub-station,11 kV power line and 11 kV Terminal bay, Rising Main, Pressure Distribution for Filling up of 9 Nos of MI/ZP tanks by lifting water from Malaprabha Right Bank Canal at Ch 129.000 Km near Savadi village in Ron Taluk, Gadag District including Operation and Maintenance for a period of 5 years after successful completion of work for RON TANK FILLING SCHEME on Turn-Key Basis
Construction of Bridge cum Barrage in Selected reaches of Varada and Dandavathi River in Soraba taluk of Shivamogga District
work comprising of construction of Intake structure, Jack well cum pumphouse, Pumping machineries (2 pumps), 33/6.6kV Electrical substation with power transformer, 33kV Transmission line, 110/33kV Transformer bay with 33kV Terminal bay, Rising main Including supply of spare parts and tools, O and M for five years after successful commissioning of the entire scheme on turnkey basis
Survey, Investigation, Preparation of Design & Drawings, Installation, Testing and commissioning of Lift Irrigation Scheme consisting Intake Canal, Jackwell Cum Pump House, Pumping Machinery, Rising Main, Bleeders and Manifolds, Pipe Distribution Network with MS/HDPE/O-PVC pipes including Structures all along the pipe distribution network for Providing irrigation facility to 1765.0 Ha of left out area in Jamakhandi and Mudhol Taluks, Bagalkot District including filling up of 7 no MI/ZP tanks by lifting water from Krishna River under Mareguddi Lift Irrigation Scheme and Filling of Galagali Barrage by lifting water from Downstream to Upstream from Krishna River including Supply of Spares, Accessories and Tools including Operation and Maintenance of the Entire System for Five years from the date of Successful Commissioning of the entire system on Turnkey Basis