Loading…
Loading…
242 results • Latest
Construction of CC Lining to Irrigation Canal Under Right Hickle No. 03 of 13th Z/D of MBC
Providing Infrastructure facility to Halaga Village coming under Bagewadi TFS in Belagavi Taluka Belagavi District.
Improvements to Roofing of quarters No JM 35/1 & 2 in Hunnur colony of Jamkhandi and re electrificians to SE & TAs chamber of circle office for the year 2025-26
Supply of Manpower for essential Quality Control works in the jurisdiction of KNNLQuality Control Division Munirabad For the year 2025-2026.KNNL/2025-26/SE0366/CALL-2
Minor Repairs to SE quarters at Hidkal Dam & Providing New Computer to SE Office at Hidkal Dam for the year 2025-26
Mahindra & Mahindra Passenger Car SUV (Sports Utility Vehicle) Diesel
Third party consultants for Inspection, testing, quality control & monitoring and construction supervision for the work of Mahalaxmi Lift irrigation scheme phase-1 in Chikkodi taluk, Belagavi District
Construction of supervpassage at Ch 20.20Km of Gondi RBC and feeder canal to Hirekere tank of Hosamane Thammana Colony of Bhadravathi taluk.Widening of GONDI CANAL FROM CH 19.500 to21.380km
Repairs to Aquaducts at Ch.1635 , Ch.1666 and Ch.1715 of Main Canal of TLBC
Survey Work for Detailed layout plan of Rehabilitation Centre for Awarkhod, Nagnoor Pk and Dodwad villages at R.C.No 3. near Redderhatti Village under H.B.P Of Athani Taluka, Dist Belgaum
Third party consultants for Inspection, testing, quality control & monitoring and construction supervision for the work of Providing community irrigation facility to 9950 Ha of leftout area in Athani Taluk, Belagavi District Including Filling up of 17 Nos MI/ZP tanks by lifting water from Krishna River near Zunjurwad Village of Athani taluk Belgaum District for the work of Ammajeshawari (Kottalagi) LIS Phase-I
Consultancy services for preparation of design, drawings, gravity distribution network system and package estimate & DTP for Mareguddi Lift Irrigation System by Lifting water from Krishna river for Providing irrigation facility in Jamkhandi taluka, Bagalkot district
Survey, Investigation, design, Supply, Installation, Testing and Commissioning of Lift Irrigation system (Head Works consisting of Intake canal, Jack well cum pump house, Power supply including substations and Transmission lines, Rising Main and Delivery chamber etc,) and Construction of Gravity Distribution System including structure for filling, 29 tanks comes under Shirahatti, Mundargi and Mundargi taluk of Gadag district by lifting the water from Tungabhadra River near Hammagi village Mundargi taluk, Gadag district Including Operation and Maintenance for a period of 5 years after successful commissioning on Turn-Key Basis under Jalwadagi tank filling scheme
REPAIRS TO DAMAGED CTC AT CH 19.00 KM OF ALLAGI MAIN CANAL AT UDACHAN VILLAGE DUE TO FLOOD UNDER BLIS AFZALPUR.
Manpower Outsourcing Services - Fixed Remuneration - Admin; Driver - LMV; Not Required, Manpower Outsourcing Services - Fixed Remuneration - Admin; Computer Operator; Not Required, Manpower Outsourcing Services - Fixed Remuneration - Admin; Office Helper; Not Required
Supply and supervision of various categories of man power for the work Annual maintenance of Jambadahalla Reservoir Project pertaining to AEE No.1 BRLBC Sub division, B.R Project for the year-2026-27.
Maintenance work
Repairs to Stone Masonry at Left Side Wing Wall at Ch 480 m near Spillway of Lower Mullamari Dam
Repairs and improvements of service roads at selected flood damaged reaches from 64.00 to 72.00 km of RBC of LMP.
Repairs and improvements of service roads at selected flood damaged reaches from 57.00 to 64.00 km of RBC of LMP.
Repairs and improvements of service roads at selected flood damaged reaches from 50.00 to 57.00 km of RBCof LMP
Repairs to Template Walls from Ch 105 to 550 m of Earthern Embankment of Lower Mullamari Dam
Repairs & Improvements of Service Roads at Selected Flood Damaged Reaches from 39.00 to 46.00 Km of RBC of LMP
Removal of Silt from Km. 0.00 to 15.00 of LBC of Amarja Project
Repairs & Improvements of Service Roads at Selected Flood Damaged Reaches from 7.00 to 16.00 Km of RBC of LMP
Repairs of flood damaged works
Repairs of SR & IP Side Breached Embankment at Ch 0.190 Km, 2.30 Km, 5.750 Km, 29.850 Km of RBC of Amarja Project in Aland Taluka Kalaburagi District
Providing basic amenities to Bhagirathi Temple, Patil, Kurane, Chougule and Khot and other colonies on Walaki- Kanagala Road in Chikkodi Taluk.
Man power
Supplying of Computer Operator and Driver to Mahalingapur MQC Sub Division office for the year 2026-27
Supplying of Computer Operator, Driver and D-Group Employees to Harugeri GLBC Sub division Office for the year 2026-27
Supplying of Computer Operator, Driver and D-Group Employees to KNNL GLBC Sub division No-5, Jamkhandi Office for the year 2026-27
Supplying of Computer Operator, Driver and D-Group Employees to KNNL GLBC Div No-2 Jamakhandi Office for the year 2026-27
Supplying of Computer Operator, Driver and D-Group Employees to KNNL GLBC Circle Office Jamakhandi for the year 2026-27
Repairs to Capacitor bank unit & Transformer oil filtration work at Halyal Lift Irrigation Scheme Stage-I and Stage-II
Supplying of Driver Employees to Raibag GLBC Sub division Office for the year 2026-27
Supplying of Computer Operator and Driver to Kankanawadi GLBC Sub division Office for the year 2026-27
Supplying of Computer Operator, Driver and D-Group Employees to Ghataprabha GLBC division Office for the year 2026-27
AME of Kudachi GLBC Inspection Bunglow and Yalparatti Bunglow and Colony for the year 2026-27
Supplying of Computer Operator and Driver to Kudachi GLBC Sub division Office for the year 2026-27
Excavation of Silt and Removal of Jungle in selected reaches of Raibag dy (from Km No. 1 to 7) and other repair works
APPOINTMENT OF INTERNAL AUDITORS FOR THE FINANCIAL YEARS 2026-27 & 2027-28
Construction of Bridge at Ch.12.20 Km of BRLBC Main canal near Kalanakatte village of Bhadravathi Taluk
REPAIRS TO CANAL LINING DAMAGE AT 10.50 KM TO 11 KM OF ALLAGI MAIN CANAL DUE TO FLOOD UNDER BLIS AFZALPUR.
REPAIRS TO ALLAGI MAIN CANAL SUPER PASSAGE DAMAGED AT CH 3.00 KM DUE TO FLOOD UNDER BLIS AFZALPUR.
CONSTRUCTION OF PROTECTION WALLS A U/S & D/S SIDE OF AQUEDUCT AT CH 47.632 KM OF BALUNDAGI MAIN CANAL UNDER BLIS AFZALPUR.
CONSTRUCTION OF PROTECTION WALLS TO BALUNDAGI LIFT MAIN CANAL ON U/S & D/S SIDE OF SP AT CH 23.328 KM UNDER BLIS AFZALPUR.
REPAIRING DAMAGE TO DY-15 & ITS MINOR GATES OF BLMC DUE TO FLOOD UNDER BLIS AFZALPUR.
REPAIRING DAMAGE TO SUPER-PASSAGE AT DY-2 OF BLMC MAIN CANAL DUE TO FLOOD UNDER BLIS AFZALPUR.
CONSTRUCTION OF PROTECTION WALLS TO BALUNDAGI LIFT MAIN CANAL ON U/S & D/S SIDE OF SP AT CH 36.823 KM UNDER BLIS AFZALPUR.