Loading…
Loading…
242 results • Latest
Maintenance work
Maintenance work
Annual maintenance work
Improvements to road from Kudaremani Village main road to Shinoli-Surute main road and Shinoli-Surute main road Sonoli Village limits in Belagavi Taluka Belagavi District.
Improvements to road from Belavatti village to Karle-Kawalewadi Main road in Belagavi Taluka Belagavi District
Improvements to road from Beejagarni village to Janewadi village in Belagavi Taluka Belagavi District
Engaging Light Motor Vehicle (with AC) on Rental Basis for Office of AEE, KNNL, Bennithora Project Reh. Sub-Division, Hebbal for the year 2026-27
Providing Light Motor Vehicle (With AC) on rental basis to the office of AEE , KNNL , Chandrampalli Project Sub Divn Chandapur for the year 2026-27
Providing Light Motor Vehicle (With AC) on rental basis to the office of AEE KNNL Bennethora Project LBC Sub Divn. Hebbal for the year 2026-27
Construction of CTC Near Surannavar Tota in Raibag ( R ) Village on Raibag Dy & other works
Construction of Pipe Cut and Cover at Km No-1 of minor -3 of Dy-4 Under UTP Main Canal, Construction of Embankment , CC Lining at breached /damaged portion of canal from Ch 1.660 to 1.70 Km /Minor-3 of Dy-4 and Construction of additional SP/CTC at Ch 4.800 Km, 4.90 Km, 4.95 Km, ch 6.050 Km, Ch 8.260 Km ,Ch 9.40 and 12.825 Km of Dy-6 offtaking at Ch 244.450 Km of UTP Main Canal and Construction of RCC trough on Both sides of canal to pass side drain water at road bridge at Ch 9.220 km of Dy-6 of UTP Main canal
Construction of Cut and Cover from Ch 1.480 km to 2.225 km of minor-5 of Dy-4 Offtaiking at Ch 201.055 KM of UTP Main canal
Construction of Sub-surface drainage works at various survey nos coming under UTP main canal Km 194 to 196 near Kurugunda Village in Haveri Taluk to stop seepage to adjacent fields and Drainage works on affected lands for the year 2024-25
Protection Wall and development works near Bhuvaneshwari Devasthana, Vandaru under Varahi Lift Canal Command Area.
Providing repairs & supplying parts to CT panal and out door VCB Rustumpur 1st & 2nd stage LIS for the year 2025-26
Re-Construction of Syphon Super Passage at Ch. 87.90 Km under Davanagere Branch Canal (Reserved for SC)
Construction of CD at Ch2.400 under Raibag High level distributary near Pathan Hall Shadi Mahal Raibag D Block
Mamadapura Disty and Betgeri-1 Disty Gate Repairs at GRBC Main Canal.
Head work for Mamadapura Disty and Maradishivapura Sub Disty including Gates at 1.800 km of Mamadapura Disty
Gate repairs to Akkisagar-1 Disty and Akiisagar-2 Disty of GRBC Main Canal
Repairs to Escape Gates at 65.550km in GRBC Main Canal
Facility Management Services - LumpSum Based - offices of Executive engineer KNNL MRBCC division No 1 Nargund; Data Entry Operator; Consumables to be provided by buyer
Hiring of Agency for IT Projects- Milestone basis
Hiring of Agency for IT Projects- Milestone basis
Hiring of Agency for IT Projects- Milestone basis
Raising of embankment on service road from Ch 14 to 66 R/S in selected reaches of Distributory 36 and Raising of embankment on inspection path from Ch 272 to 391 L/S in selected reaches of Sub Distributory 36/1 of Distributory 36 of TLBC
Raising of embankment on service road from Ch 547 to 550 R/S, on inspection path from Ch 577 to 587 L/S, Ch 599 to 618 L/S, Ch 650 to 656 L/S and Removal of silt from Ch 512 to 540 in selected reaches of Distributory 36 of TLBC
Improvement to Aycut road from Hebbandi main road to Padattadakatte kere in Hebbandi village of Bhadravathi Taluk
Improvement to Aycut road from Noorulla Land to Chowdeshwari Temple of Siddapura Hosur of Bhadravathi Taluk
Providing partitions to all branches,electrical repairs,interior works to EE Chamber, repairs of doors,windows, ventilators, repainting and maintainance to bhadra canal No.3 Division office for the year -2025-26
Operation and Maintenance of Pumping Machinaries, Transformer Yard of Devalapur LIS for the year 2025-26
Consultancy Services For Third Party Inspection, Supervision And Submission of Reports etc Complete For The Work of Hangaraga Tank Filling Scheme in Belagavi Taluka Belagavi District.
Restoration of Chummery Block in GRBC Colony in Gokak & Restoration of Electrical,Plumbing and Sanitary work in Chummery Block in GRBC Colony in Gokak.
Removal Silt and jungle of Avaradhi Distributary from Km 6 to 13 and its Laterals Coming under GRBC For the year 2025-26.
Facility Management Services - LumpSum Based - Office of the Executive engineer, IPC Division; Group D; Consumables to be provided by buyer
Restoration of Existing Check Dam Near Ramenahalli Village Including Extension of Body Wall, Key Wall, Wing Wall, Returns Wall, Protection Wall, Pitching and Formation of Embankment in Shirahatti Constituency Gadag Dist
Construction of statue of Late Shri K.H Patil, Ex-Minister, Government of Karnataka in rehabilitation centre of Shirur village of Kukanoor taluka in Koppal District (Phase-II)
Construction of operator cum watchman quarters at LIS Km 9.10D/S of Hagari Aqueduct Under D-16A of RBHLC.
Repairs to Abutment & pier of Road Bridge at km 4.40 of D-14 RBHLC (passing NH 150A at Havambavi)
Repairs to Pumps & motors in jalibenchi Lis near Jalibenchi village in Ballari Tq & Dst to Suppliment to tail end ayacut of D-14 of RBHLC.
Operation & Maintenance(Man Power) of Renuka, Katamalli, Yaragatti, Singarkoppa, Lift Irrigation Schemes on Right bank foreshore of Malaprabha Reservoir Under Malaprabha project Zone for the year 2025-26.
Hiring of Agency for IT Projects- Milestone basis