Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC B 630 DHANWANTRI NAGAR JABALPUR M P 482003 | JABALPUR | MADHYA PRADESH | 482003 | ₹2.1 Cr | L1 | Accepted-AOC As per CWC-I decision |
| 2 | L2₹2.1 CrRejected-AOC JABALPUR | ₹2.1 Cr | L2 | Rejected-AOC As per CWC-I decision |
| 3 | L3₹2.5 CrRejected-AOC | ₹2.5 Cr | L3 | Rejected-AOC As per CWC-I decision |
| 4 | L4₹2.6 CrRejected-AOC DIWANBADA MANEGAON POST OFFICE KHAMARIA JABALPUR 482005 M P | JABALPUR | MADHYA PRADESH | 482005 | ₹2.6 Cr | L4 | Rejected-AOC As per CWC-I decision |
| 5 | Rejected-Technical | - | - | Rejected-Technical As Per CWC I Decision |
| Sl No | Description | Qty | Unit | C L BHATIA L4 | dinesh mishra L1 | M/S BRIJESH SONKER L2 | SANJAY KUMAR THAKUR L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of brick work or stone/ boulder masonry built in cement or cement lime mortar, including all quoins, arches, pillars, etc. as per the directives of EIC. | 400 | Cum | 1,500 ₹6 L | 500 ₹2 L | 1,100 ₹4.4 L | 1,500 ₹6 L |
| 2.00 | Demolition of brick work or stone/ boulder masonry built in cement or cement lime mortar, including all quoins, arches, pillars, etc. as per the directives of EIC. | 100 | Cum | 1,500 ₹1.5 L | 500 ₹50,000 | 1,000 ₹1 L | 1,400 ₹1.4 L |
| 3.00 | Removing cement or cement lime mortar from and cleaning bricks, stacking for measurement including all extra handling and removal and disposing off rubbish | 200 | Per 1000 Nos. | 1,500 ₹3 L | 700 ₹1.4 L | 900 ₹1.8 L | 1,100 ₹2.2 L |
| 4.00 | Demolition of Concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level). | 115 | Cum | 1,500 ₹1.7 L | 500 ₹57,500 | 1,200 ₹1.4 L | 1,200 ₹1.4 L |
| 5.00 | Demolition of Cement Concrete (unreinforced) of any description and in any position not otherwise specifically provided for. | 100 | Cum | 2,000 ₹2 L | 500 ₹50,000 | 1,200 ₹1.2 L | 1,500 ₹1.5 L |
| 6.00 | Demolition of Reinfiorced Cement Concrete (Reinforcement cut as required to facilitate demolition)) in Roofs, floors (other than ground floors), beams, staircases, landing, chajjas and similar suspended work. | 40 | Cum | 2,000 ₹80,000 | 500 ₹20,000 | 1,500 ₹60,000 | 2,000 ₹80,000 |
| 7.00 | Dismantling of concentrina coil along with maximum 16 nos. RBT from the angle frame, removal to store and re-fixing in same location after completion of work and after necessary strainghtening, any repair as per the directives of EIC. | 250 | Rm | 200 ₹50,000 | 50 ₹12,500 | 550 ₹1.4 L | 525 ₹1.3 L |
| 8.00 | Dismanling of Angle frame any type embedded in cement concrete, removal to store and re-fixing in same location after completion of work and after necessary strainghtening, any repair as per the directives of EIC. | 200 | Each | 150 ₹30,000 | 80 ₹16,000 | 220 ₹44,000 | 225 ₹45,000 |
| 9.00 | Dismantling structural steel work including doors, gates but excluding framed
truss etc. | 63 | Qtl | 800 ₹50,400 | 200 ₹12,600 | 600 ₹37,800 | 500 ₹31,500 |
| 10.00 | Dismantling plain or corrugated steel sheeting any gauge, thickness, any pattern in roof coverings. | 60 | Sqm | 1,200 ₹72,000 | 20 ₹1,200 | 25 ₹1,500 | 30 ₹1,800 |
Tender Value
₹2.5 Cr
EMD Value
₹3.2 L
Closing Date
22 Sept 2025, 2:00 pmClosed
CHIEF GENERAL MANAGER
ORDNANCE FACTORY KHAMARIA JABALPUR M.P 482005
Re-construction/ renovation of watch tower, rest room, perimeter wall, gate offices and connected toilets at OFK
2025_MIL_247774_1
3520/EO/CONT/ND2317/25-26/09
Open Tender
Civil Works
180 days
ORDNANCE FACTORY KHAMARIA
Please refer tender documents
9 documents required · 9 mandatory
₹0
₹3.2 L
Yes
26 Feb 2026
6 Sept 2025
23 Sept 2025
6 Sept 2025
22 Sept 2025
6 Sept 2025
6 Sept 2025 - 21 Sept 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid