| 1 | L1₹50.4 LAccepted-Finance ERNAKULAM | KERALA | 680667 | ₹50.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹55.2 L+₹4.8 L (9.56%)Rejected-Finance | ₹55.2 L+₹4.8 L (9.56%) | L2 | Rejected-Finance L2 |
| 3 | L3₹55.6 L+₹5.1 L (10.2%)Rejected-Finance | ₹55.6 L+₹5.1 L (10.2%) | L3 | Rejected-Finance L3 |
| 4 | L4₹57.0 L+₹6.5 L (12.9%)Rejected-Finance | ₹57.0 L+₹6.5 L (12.9%) | L4 | Rejected-Finance L4 |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Sufficient tender fee not paid |
| Sl No | Description | Qty | Unit | SALAHUDEEN L4 | DINISH P S L2 | K.M shamsudheem L3 | SREERAM K NANDAN L1 |
|---|---|---|---|---|---|---|---|
| 1.00Ground Floor | |||||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 3.38 | cum | 3,671.89 ₹12,392.63 | 3,561.73 ₹12,020.84 | 3,200 ₹10,800 Lowest | 3,500 ₹11,812.5 |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 278.1 | sqm | 961.24 ₹2,67,317 | 932.4 ₹2,59,296.71 | 925 ₹2,57,238.8 | 750 ₹2,08,572 Lowest |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 136.91 | sqm | 762.88 ₹1,04,444.38 | 739.99 ₹1,01,310.55 | 762 ₹1,04,323.9 | 550 ₹75,299.4 Lowest |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 180.57 | sqm | 1,008.55 ₹1,82,113.87 | 978.29 ₹1,76,649.83 | 980 ₹1,76,958.6 | 750 ₹1,35,427.5 Lowest |
| 1.00 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 12.04 | sqm | 824.81 ₹9,934.84 | 800.07 ₹9,636.84 | 810 ₹9,756.45 | 750 ₹9,033.75 Lowest |
| 1.01 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 56.56 | sqm | 1,021.94 ₹57,800.93 | 991.28 ₹56,066.8 | 980 ₹55,428.8 | 900 ₹50,904 Lowest |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 79.8 | metre | 228.13 ₹18,204.77 | 221.29 ₹17,658.94 | 228 ₹18,194.4 | 200 ₹15,960 Lowest |
| 1.01 | OD132243/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess cement used as per design mix not payable separately as per Circular No. CE/BL/GL/6541/2015 dated 30/8/2017 of CE buildings PWD. All work above plinth level upto floor V level | 78.7 | cum | 12,924.06 ₹10,17,110.6 | 12,536.34 ₹9,86,597.42 | 12,250 ₹9,64,062.75 | 10,000 ₹7,86,990 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 8,207.01 | kilogram | 112.43 ₹9,22,713.8 | 109.06 ₹8,95,056.18 Lowest | 110 ₹9,02,770.77 | 112 ₹9,19,184.78 |
Tender Value
₹57.0 L
EMD Value
₹50,000
Closing Date
28 Jul 2026, 2:00 pmClosed
Executive Engineer PWD Building Divsion,EKM
Executive Engineer PWD Building Divsion,EKM
The provisions proposed in second floor RCC columns, beams, roof slab
2026_PWD_860530_1
PWD/BLDG/TR/16036/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
365 days
Padamugal, Kakkanad
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
11 Sept 2026
14 Jul 2026
30 Jul 2026
14 Jul 2026
28 Jul 2026
14 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Ground Floor | |||||
| 1.001 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | - | cum | - | - |
| 1.002 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 0.4 | sqm | - | - |
| 1.003 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 0.2 | sqm | - | - |
| 1.004 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 1 | sqm | - | - |
| 1.005 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 1 | sqm | - | - |
| 1.006 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | - | sqm | - | - |
| 1.007 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 1 | metre | - | - |
| 1.008 | OD132243/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess cement used as per design mix not payable separately as per Circular No. CE/BL/GL/6541/2015 dated 30/8/2017 of CE buildings PWD. All work above plinth level upto floor V level | 0.6 | cum | - | - |
| 1.009 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.8 | kilogram | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_1455184.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 2.91 MB
BOQ_1455184.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .