Dy.Minicipal Commissioner - West Zone
Making New footpath and Repair Old footpah Under MP,MLA,Counciller,Revnu and Other Budget at Diff.Places in Navarangpura West Zone.(ARC)
367846
3/26-27 (T.N.64)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹3,600
Municipal Commissioner, Ahmedabad
₹1.5 L
23 Nov 2026
23 Nov 2026
23 Nov 2026
26 Nov 2026
23 Nov 2026
120 days
2. Tender Estimated Cost Rs. 1,50,00,000.00 (exclusive of GST). GST will be paid extra by
AMC/Authority at prevailing rate to the contractor
1% of the Tender Cost in the form (Rs.1,50,000/-)
3. Earnest Money
(D.D./Pay Order / Local Micr Check/B.G.)
4 Tender Fee Rs Demand Draft of Rs.3600.00
6. Time-Limit 12 months
7. Validity Period 120 Days
(i) Last Date of Online Submission
a) In Sealed cover in duplicate copies by Registered
(ii) Mode of Sending Post A.D, or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to be
a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in
The Price bid shall be submitted online only.
Schedule of Quantities and Rates It shall not be submitted Physically.
9. Date of Opening Dt.27.11.2026 , 15:00 hrs.
Submission of EMD. Tender fee and other Documents
during office hours: On date.27-11-2026, 12:00 pm
Place of Submission & Opening of
10. West Zone, 2nd Floor, A.M. Office, Stadium Sub Zonal
Tender Office, Nr. Panchshil Water Tank, Naranpura Railway
Crossing Ahmedabad
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2) Rs.2500
11. Penalty Due to Delay of work per day (for tenders amounting above 10 Lakhs and upto 30 Lakhs), (3)
Rs.5000 per day (for all tenders amounting above 30 Lakhs) but not more
then 10% of the remaning bill
12. Defect Liability As per ‘B-1 Form Close
Whenever a work is allotted by Engineering staff, whether minor or
major of part thereof of any amount, the contractor shall be bound
Time permitted to start parts of
13. to start the works within 48 hours of intimation of work.
Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for the
same. Failure of comply to start the works in 48 hours of intimation
as above by contractor the contractor shall be levied penalty of (1)
Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
30 Lakhs). Three times failures by contractor shall make
contractor responsible to be black listed unless and otherwise
justified properly in writing / binding within 15 days of last notice of
14. ftuLx[t¾xhlu «J<obtl GST yjd&e åþfJJtbtk ytJNu
The staff of the contractor shall wear safety jackets,
shoes, helmets etc. while on duty and any violation will attract
a fine of Rs. 5,000/- for each incident.
15 Safety Failure to erect safety signage or trying to carry out
the works without proper precautions/safety measures as
required will attract a fine of Rs. 5,000/- for each incident.
Contractor's Sign Addl.C.E.(west zone)
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl - vrùbÍtul
y.Bgw.ftu. Ítul Ítulj ytuVem,
ztuo.hbKCtE vxuj CJl, WMbtlÃþht ath hM<t vtmu, ybœtJtœ. vrùb Ítul xuLzh ltuxem
lk-03/2026-27 btk ytJhe juJtguj ftbtule ÂJd<
1. Wvhtuf< xuLzhtu su btLg hSMx[uNl ^htJ<t ftuLx[t¾xh©eytuyu ztWljtuz fhe ChJt.
2. yt xuLzhtu zwÃjefux ftuveytu mt&u Chelu Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk
btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, xuLzh ftuve <&t yLg vwhtJt mt&u
yawf mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu. su ftuLx[tfxh©eytuyu
hSMx[uNl heLgw fhtJuj l ntug.
4. ftuLx[tfxhtuyu xuLzhbt cukfl wltb, Ft<t lkch, btEfh lkch ylu mhltBþ MvÐ yûthu jFÔþ.
5. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
6. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
7. xuLzh mt&u BþfJtbtk ytJ< hfblt ftb btxu htufzt, jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t
Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk
8. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
9. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<&t btuctRj lkch yJ~g jFJtltu hnuNu.
ftuLx[t¾xhu vtu<&t ze.ze. xuLzh R~gw > <theF ct>lt s ytvJt.
10. Nh<e xuLzh hœ ct<j dKtNu.
11. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u
mbglu ftble BþÆ<btk bkswhe ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ œhuf
12. xuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrl.rmvj frb§h©ele hnuNu.
13. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykdu xuLzh Ch<t vnujt AuÕju r>Jmu rlg< JucmtEx y&Jt fauheyu sYhe <vtm
fhelu s xuLzh btufjÔþk.
14. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mw^ele ykœtS< hfblt ftb btxu htufzt, jtufj btRfh auf,
rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/
vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
15. mœh xuLzhbtk " GST rlgb Bþsc jtøþ vzNu. " <u Bþsc dKºte fhe xuLzh ChJtlt hnuNu.
zebtLz z[tVx / auf “Bgwrlrmvj frb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
As per Government of Gujarat G.R.No.- EMD/10/2021/7729/DMO Dt.28/06/2021 & Circular of
Finance Department, AMC No.10, Date: 05.08.2024, approved Banks are...
A. Guarantees issued by following banks will be accepted as SD/EMD on permanent basis.
B. All nationalized Banks
C. Guarantees issued by following banks will be accepted as SD/EMD for the period up to March-
2025. The validity cut-off date in the GR is with respect to the date of issue of Bank Guarantee
irrespective of the date of termination of Bank Guarantee.
1. Commercial Banks :-
1. A U Small Finance Bank
3. Bandhan Bank
4. City Union Bank
6. DBS Bank India Limited
8. Equitas Small Finance Bank
9. Federal Bank
14. IDFC First Bank
15. IndusInd Bank
16. Jana Small Finance Bank
17. Karnataka Bank
18. Karur Vysya Bank
19. Kotak Mahindra Bank
20. South Indian Bank
21. Tamilnadu Mercantile Bank
22. Utkarsh Small Finance Bank
2. Co-operative and Rural Banks Of Gujarat :-
1. The Ahmedabad Mercantile Co-operative Bank Limited
2. Kalupur Commerical Co-operative Bank Limited
3. Nutan nagrik Sahakari Bank Limited
4. Rajkot Nagarik Sahakari Bank Limited
5. Saraswat Co-operative Bank
6. SVC Co-operative Bank
7. The Cosmos co-opretive Bank
8. Baroda Gujarat Gramin Bank
9. Saurashtra Gramin Bank
10. The Gujarat State Co-Operative Bank
11. The Mehsana Urban Co-operative Bank Limited
12. The Surat District Co-operative Bank
13. The Surat Peoples Co-operative Bank
bu.Bgwrl.frb§h©e, ybœtJtœ Bgwrl. ftuvtuhuNllt mhfgwjh lk.-81, Bþsc <btb
«fthle fLMx[¾Nlle yu¾xeJexebtk BþÏg ftuLx[t¾xh, mc ftuLx[t¾xhlt su bswhtu ftbdehe fh<t
ntug <u <btb bswhtuLþk øþsht< rcÕz´d yuLz y^h fLMx[¾Nl Jfombtk hSMxuNl fhtJÔþ
AHMEDABAD MUNICIPAL CORPORATION
WEST ZONE ENGINEERING DEPARTMENT
Name of Work :- Making New footpath and Repair Old
footpah Under MP,MLA,Counciller,Revnu and Other Budget
at Diff.Places in Navarangpura West Zone.(ARC)
Sr. Quantity Item Description Rate Per Amount
1 1600.00 Box cutting the road surface to proper slope and
camber for making a base for road work
including removing the excavated stuff and
depositing on the road side slope as directed
upto 50Mt.lead. (EXECUTED WITH
MANUAL LABOUR)(R&B SOR 23-24 ITEM
CODE 26B008 PN 109 )
2 Dismantling the following including loading,
unloading and disposal of unserviceable
material for all lead or as directed by Engineer-
In-Charge and stacking the serviceable material
and backfilling the resulting trenches and pits
i 7000 Dismantling tiled or stone floors laid in mortar
including stacking of serviceable material and
disposal of uservicalble material with all lead
and lifts. SOR 23-24 IT CD NO:20005 47.25 Smt
ii 50 Demolition & disposal of unservisable material
with all lead and lift for unreinforeced concrete.
SOR 23-24 IT CD NO:20001B 603.23 Cmt
iii 30 Demolition of brick work & stone masonry
including stacking of serviceable materials and
disposal of unserviceable materials with all lead
and lift (1) In cement mortar. SOR 23- 24 IT
CD NO:20003B 544.95 Cmt.
iv 20 Demolition including stacking of serviceable
materials and disposal of unserviceable
materials with all lead and lift. (I) R.C.C work.
SOR 23-24 IT CD NO:20002 1047.38 Cmt
3 Conveyance charge of earth, lime, murrum,
building rubbish, manual garbage, sludge,
excavated rock , fly ash, aggregate of any kind
etc complete up to 10.0 KM lead. (R&B SOR
23-24, P-6 - Item code- 030201A1)
(J) 2500 Up to 5 Km. lead
(K) 500 Add Extra On j For Lead More Than 5 km up to
4 Extra rate over item of excavation of earth for
excavation of asphalt pavement of thickness
upto 0.20 meter including demolishing the
asphalt carpet,metal,soiling etc.comp. with
stacking the material as directed.
(a) 1500.00 0.20 to 0.30 meter (By any type of Breaker
Machine or R.C.C.Cutter machine including
cost of operator, fuel, & transportation etc
complete. Sor 21-22 200.00 Smt
(b) 500.00 0.30 meter & above (By any type of Breaker
Machine or R.C.C.Cutter machine including
cost of operator,fuel, & transportation etc
complete.Sor 21-22 350.00 Smt
5 Providing, laying, spreading and compacting
graded stone aggregate to wet mix macadam
specification including premixing the Material
with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site,
laying in uniform layers in sub- base / base
course on well prepared surface and compacting
with vibratory roller to achieve the desired
density as per Codal Provision.Approved Rate -
(a) 450 Production & Supply of WMM 1975.00 Cmt
(b) 450 Laying of WMM
6 Repairing damaged M.H. incl. removing
damaged brick and repairing by masonry in
C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I.
steps and M.H. and carting the same as directed.
Approved Rate - Road Project
(a) 100.00 (A) up to 0.15 mt. (@ Two Coarse) 728.82 No.
(b) 30.00 (B) up to 0.35mt. (@ Four Coarse) 1155.44 No.
7 100.00 Repairing damaged I.C./ Raising removing
damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and
fixing C.I. steps and existing chamber sheet
cover, removing the debris from chamber and
carting the same as directed.Approved Rate -
Road Project 399.96 No.
8 300.00 Providing, supplying and fixing precast C.C.
blocks (M-20) edge kerb having size of 75 x
300 x 300 mm depth and as per design
conveying it to the site, jointing into C:M 1:3
and racking out the joints incl. necessary
excavation of asphalt, soil etc..completed. SOR
9 4000.00 Pre cast concrete kerb Providing and fixing M25
Grade of concrete precast exposed / Fair finish /
texture finish kerb stones of approved make as per
approved sample of any size and any type.Kerbs
shall be fixed on the foundation prepared as per
approved design. The rate shall also include for
erecting and fixing the pieces in position for
complete kerb system with chamfered type of
including necessary accessories of kerb like
radius kerbs, angles and quadrant kerbs, droplet
kerbs etc. complete as per drawing. Kerb shall be
fixed as paper joint without any jointing
material.However cement mortar shall be
provided at the kside of kerb stone joint. (Sample
must be approved) Cost of excavation, cutting
base , side filling shall includes as directed
engineer - incharge in above item description as
per BOQ (b) 380 x 600 x 150 mm high Footpath
kerb.Approved Rate - Road Project 912.50 Rmt
10 1000.00 Providing and fixing pre-cast concrete kerb
stone of gray cement based concrete block 30cm
length,30cm height and 15cm thick of M200
grade concret as per approved design and
including excavation for fixing in proper line
and level,filling the joint with C:M 1:3
(1cement:3fine sand) etc complete.Item Code-
14023A (Rate in Rs.for 2023-24) SOR 376.43 Rmt
11 100.00 Supplying and fixing of 450 mm H x 300 mm L
x 150 Below..100 mm B Above Double Teper
Kerb block for footpath/Central Verge in M-20
grade using 20 mm nominal size black trap
aggregate of Sevaliya/Timba or equivalent
quality for pre-cast blocks, reasonably exposed
finish/ formwork, mould with well equipped
with vibratory system for kerb stones of
approved design including curing, etc. complete,
including the cost of formwork etc. complete.
The rate shall also include fixing the Kerb
stones in line and level on 5 cm thick sand
bedding with necessary equipments and
materials. The rate shall also include the flush
pointing in CM (1:3) for all joints of the
kerbstones. 525.00 Rmt
12 5500.00 Paver Block Providing and laying shot blasted
Non - interlocking, Paver blocks of specified
thickness, size, grade of concrete and colour
machine made and blasting by automatic shot
blasting machine and high density of as per
approved sample of approved make for footpath,
parking areas, service lanes,cross over and other
areas as mentioned in the drawing. Including
providing and laying 50 mm thick averave
bedding layer of coarse sand below paver block
as per required grading and specification. Laid
paver block shall be mechanically compacted.
The work of the paving blocks shall be executed
in line and level by skilled mason of flooring
work only. Small size of paver block with same
specification shall be used at residue or at end. It
should be laid in such a way that the no cutting
of the paver block to be necessary. If cutting of
paver block shall be required , than cut by
machine only and laying to be done by skilled
flooring mason. The finished surface of the
paver block shall have coarse sand Texture
Finish. Pave blocks shall be compacted and
shall be re-laid if necessary. Actual laid area
shall be measured and paid without any wastage.
(A) 60 mm thick M-35 grade Grey Paver block
of size 200mm x 200mm. Approved Rate - Road
Project 669.65 Smt
13 1500.00 Providing and fixing pre-cast Rubber Dye / steel
Dye inter locking concrete block 60mm thick
with grade of concrete M300 pnumatic
compressed / vibrated mechanically and as per
approved design Confirming to IS 15658 :
including 35 mm Sand layer for levelling and
filling the joint with sand in proper line and
level as per guidlines of IRC : SP 63- 2018 etc.
Complete. Item Code-14033 (Rate in Rs.for
14 10.00 Constructing Bombay Pattern Type Catch Pit of
size 0.60 x 0.60 depth up to 1 mt including
excavation, B.B.C.C. (1:5:10), 23 cms thick
brick maso. wall in the prop. of CM (1:6) with
40 mm thick IPS flooring in the prop M15 at
bottom and 15 mm thick cement plaster inside
the catch pit in the proportion of CM (1:3) with
out jali etc. comp. as directed.Approved Rate -
Road Project 3110.80 No.
15 10.00 CatchPit Jali (Heavy duty) Fixing P/F FRC
catch pit jali with frame 600mm x 600mm clear
opening etc. comp.. As directed by engineer in
charge. 1377.64 No.
16 Providing F.R.C. MH seat cover incl. carting to
the work site etc. comp. Directed.
a 20.00 (SET cover and frame) F.R.C. Heavy Duty
[HD-20] Machinehole Covers & Frames-
560mm ø clear opening, The dimension of
frame and cover as per mentioned in Amend
No.1 to IS 12592 :2002 table 1Approved Rate -
Road Project 3255.62 Set
17 24.00 Providing and fixing Swiss type bollard made
out of 1.5mm CRC sheet ,height 140cms,bottom
dia 23cm,top dia 12cm with direction plate of
cm dia fabricated necessary anchors as directed
and also provide through out lengh pipe of
NB for the strenthing of bollard and
reflectorised Micro Prismatic Grade Sheet (Type
XI)and three yellow strip 6 Inches wide of Type
XI Retro reflective Sheeting, fixing with P.C.C
M25 grade concrete(Foundation size
18 6154 Filling of Zari along the sides of the kerbstone
fixed, prepared with Bituminous Concrete
mixed in proper proportion as directed by
Engineer- In -Charge to form a pourable
mixture.sor 2021-22 50.00 Rmt
19 24.00 Construction of RCC nosing in central verge
using M-200 grade cement concrete. The item
includes cost of centering & shuttering,
reinforcement, both side cement plaster in C:M
1:3 mortar & curing etc. complete. Half round
portion of the nosing shall be made by using
mild steel.sor 2021-22 5469.00 no.
20 1000.00 Painting one coats (excluding priming coat) on
previously painted steel and other metal surface
with enamel paint, brushing to give an even
shade including cleaning the surface of all dirt,
dust and other foreign matter...(R&B SOR
2023-24 ITEM CODE 19003 PAGE NO-136) 54.35 Smt
21 1000.00 Extra over item every subsequent coat of
paint.((R&B SOR 2023-24 ITEM CODE
PAGE NO 136) 50.40 Smt
22 3000.00 Painting Two Coats on divider and footpath
curb surface / New Concrete Surface ( Painting
two coats after filling the surface with synthetic
enamel paint in all shades on new plastered
concrete surfaces) (AMC approved Rate ) 71.86 Smt
23 3000.00 Applying priming coat over old kerb surface
and including,preparing the surface with ready
mixed priming paint brushing red lead 19.46 Smt
24 Providing F.R.C. MH seat cover incl. carting to
the work site etc. comp. directed.
50.00 (SETcover and frame) F.R.C. Extra Heavy Duty
[EHD-35] Machinehole Covers & Frames-
560 mm ø clear opening, The dimension of
frame and cover as per mentioned in Amend
No.1 to IS 12592:2002 table1 (As per Central
Store Approve Rate Circular dated 21/04/2025,
Item No. 1, without GST) 6165.25 Set
25 500.00 Providing and fixing tree guard with grey
exposed finish in grade M20 with nominal steel
and wall thickness of 80 mm outer size
800X800mm Approved Rate - Road Project 794.64 No.
26 Supplying, labour for break down repairing
work for activities like excavation, disliting,
removing debris from trench back filling etc.
comp. as directed by Eng.in charge.
27 300.00 Labour charges - Mazdoor (Male) It Code -1051
28 50.00 Labour charges - Mason 1st ClassIt Code -1047
29 50.00 Providing formwork of ordinary timber planking 171.68 smt
so as to give a rough finishi ncluding centering
shuttering strutting and propping etc.Height of
propping and centering belows up porting floor
to ceiling not exceeding 4M. and removal ofthe
same for in situ reinforced concrete and plain
concrete work in.(A)Foundations Footings
Bases of Columns etc. and Mass concrete. Item
Code -09001AA SOR 2023-2024
30 671.89 Providing TMT Bar FE 500D reinforcement for 75.46 Kg
R.C.C.work including bending, binding and
placing in position complete up to floor two
level (SOR BUILDING WORKS
AHMEDABAD CITY (WITHOUT GST)
YEAR:- 2023-24, Item code 05014C, PN 54)
31 300.00 Providing and laying cement concrete 1:2:4 (1-
Cement : 2- Coarse sand : 4- graded stone
aggregates 20 mm nominal size) and curing
complete excluding cost of formwork in (A)
Foundation and Plinth, tem Code- 05010AA
(Rate in Rs.for 2023-24) SOR 3661.30 Cmt
32 15.00 Providing and Laying ordinary cement concrete 6241.78 cmt
1:2:4(1-Cement2- coarsesand:4-gradedstone
aggregates 20 mm nominal size) and finishing
smoothwithcuringetc.completeincludingthecost
of formwork but excluding the cost of
reinforsement for R.C.Cwork in (iv) Slabs
having more than 13 cm and upto
cm.thickness. tem Code- 05026D (Rate in Rs.for
33 15.00 Providing and laying in position Ready Mixed 4793.10 cmt
M-200 grade concrete for reinforced cement
conctere work , using cement content as per
approved Design Mix manufactured in fully
automatic batching plant and transported to site
of work in transit mixer for a lead up to 10 kms
having continuous agitated mixer, manufactured
as per mix design of specified grade for
reinforced cement concrete work including
pumping of R.M.C. from transit mixer to site of
laying, excluding the cost of centering
shuttering finishing and reinforcement including
cost of admixtures in recommended proportions
as per IS: 9103 to accelerate/ retard setting of
concrete, improve workability without impairing
strength and durability as per direction of the
Engineer - in - charge. Without Fly Ash (Min
cement level as per latest IS 456 shall be
maintained) Item Code - 5055 SOR 2023-2024
34 100.00 P/A Trimix with dewatering machine and floater 54.00 smt
machine on constructed RCC work incl.cost of
machine and labour etc comp as directed.
(Approved Rate)
35 20.00 Making 15 mm groove in RCC work on road 30.00 rmt
and filling it with polysulfied sealant and
finished it good incl. all labour charges etc comp
as directed. (Approved Rate)
36 100.00 Providing and laying for approved quantity (ISO
Certified brand) floor hardener @
kg/Smt.Approved Rate - Road Project 60.00 smt.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at
different sites simultaneously. Contractor's having labour force available during festivals
shall only apply. Contractor can not stop the work due to on availably of labour force. In case
progress is delayed, contractor shall be penalized 0.1% of Tender amount per day for work
done after time limit, maximum up to 10% for remaining work.
5. Bitumen rate difference will be paid as per tender conditions, if applicable.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate
bills of contractors.
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then
contractor shall not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as
directed"/approved" by the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points, or
aspects in the relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest
to the following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route
and not necessarily the route actually taken. The decision of the Engineer-in-charge in this
regard shall be taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of
work is in the form of a designation containing the number of the specification of the
material and prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not
absolve the contractor from the responsibility of replacing defective material brought on site
or materials used in the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-
23. Collection of approved materials shall be done at site of work in a systematic manner.
Materials shall be stone at site of work in a systematic manner. Materials shall be stored in
such a manner as to prevent damage, deterioration or intrusion of foreign matter and to-
ensure the preservation of their quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed
from the site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the
particular item.
27. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works during execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or
over loading of the various components of the structure during execution or after completion
of the structure.
29. All necessary safety measures and precaution (including those laid down in the various
relevant Indian Standards) shall be taken to ensure the safety of men, materials and
machinery on the works as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one
percent towards testing charges is separately made.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar
days (120) from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall
furnish to the Corporation Security Deposit of 5% (Five Percent) of the contract price cheque or
Bank Guarantee, pay order, or demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 month period after the order to start the works. Progress of work
should be in proportion to time limit.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of
work. In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall
be final. The contractor shall have to give site clean of all rubbish during the work and at the time of
completion of work and hand over the site with final finishing of the work as directed. All the
rejected materials shall be removed from site within 24 hours by contractor at this risk and cost.
Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to
prepare through of bigger size and mix the mortar in the required proportion. In on case he shall be
allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to make
his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor
and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if
item is not available in SOR than based on current market rates. In case of extra item decision of
Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra
and the contractor will have to carry out the works and he will be paid at the rate quoted by him. No
claim for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall
have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will
be fully responsible for compliance of the various provisions under contract Act. 1970 and the Rules
framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of the
tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on
his own during the period. If any tenderer withdraw or makes any modifications or addition in the
terms and conditions of his tender not acceptable to the Municipal Corporation the Municipal
Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said
earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work
the penalty of Rs.- (As per Form - B1) per day of delay shall be recovered from the immediate bills
payable to the contractor. Contractor has to make his own arrangement for procurement of steel and
Contractors should note the following conditions carefully:-
1. Conditional tender shall not be accepted.
2. All tenders are to be submitted in duplicate without which the tenders are liable to be
3. In case of tender downloaded from website, tender fee & EMD should be submitted in form
of demand draft or in cash.
4. Condition of Form - B1 Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B Dept.
- Govt. of Gujarat booklets of Building Works & and Road Works Specifications published
by Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child
Labour Prohibition and Regulation Act 1986. Hon'ble Supreme Court has given certain guide
lines and as per the guide lines. If child labour is employed on the site work, the contractor
shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child labour
welfare fund. If the employer refuses to deposit then action will be taken for contempt of
Supreme Court Judgement and also will be prosecuted by concerned authority. Because of
the breach of any provision of child labour prohibition and regulation Act 1986 by the
Contractor & Municipal Corporation becomes liable to pay any amount then the Municipal
Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as
per its Reso. No. 1783 Date 06--02-97, but the Municipal Corporation Board has recently
decided that the actual testing charge is taken and the remaining amount is refundable at the
time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register
acordingly,and has to follow other govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim
shall be entertain regarding QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be
made by A.M.C. The same shall be placed on A.M.C website which may be downloaded by the
tendrers enclosed along with the tender duly signed. These shall form a part of tender. The tenderer
shall not add or amend the text of any of the documents except in so far as may be necessary to
comply with any addendum.
* ADDENDAUM / CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the
part of the contract documents. The full consideration shall be given to such addendum or
corrigendum or correction before submission tender duly filled in by the contractor. Therefore, the
contractor shall have to watch such addendum or corrigendum or correction published by A.M.C
through its website www.egovamc.com. Tenderes shall verify the number of addendum issued and
enclose the same with the tender documents,failing which the tender shall be liable for rejection and
no any complaint in respect to this shall be entertained under any circumstances.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNI CIPAL CORPO RATI ON ENGI NEER DEP ARTMENT
NAVRANGPURA WARD
TECHNICAL SPECIFICATION
Name of Work ;- Making New footpath and Repair Old footpah Under
MP,MLA,Counciller,Revnu and Other Budget at Diff.Places in Navarangpura
West Zone.(ARC)
General Technical Specification Section
Following technical specifications shall be applicable to the relevant items of BOQ
Box cutting the road surface to proper slope and camber for making a base for road
work including removing the excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead
Any soil which generally yields to the application of pickaxes and shovels, spades, rakes
or any such ordinary excavating implement or organic soil, gravel, silt, sand turf loam,
clay, peat etc. falls under this category. For materials and workmanship for earthwork
and excavation, relevant specification IS: 3764 & IS 1200 (Part I) shall be followed.
To protect persons from injury and to avoid damage to property, adequate
barricades, construction signs, red lanterns and guards as required shall be placed and
maintained during the progress of the construction work and until it is safe for the traffic
to use the roadways. The relevant Indian standards and the rules and regulations of
local authorities in regards to safety provisions shall be observed.
The depth of the excavation shall be as required. The site shall be cleared and all
obstructions, loose stones, materials and rubbish of all kind, bush; wood and all type
trees shall be removed, as directed. The materials so obtained shall be the property of
AMC and shall be conveyed and stacked as directed, within 50-m. lead. The roots of the
trees coming in the sides of the trenches shall be cut and coated with hot Bitumen.
All types of trees, woods etc. which requires prior permission of Govt./ Forest
Authority / Municipal Commissioner, before cutting shall be cut after obtaining such
permission from them. The rate of site clearance is deemed to be included in the rate of
The excavation shall be carried out in true line and level and having width and
depth, as shown in the drawings or as directed. The Contractor shall do the necessary
shoring and strutting or shall provide necessary slopes to a safe angle or steps, as
required or directed, at his own cost. No extra payment shall be made for such
precautionary measures, taken. The bottom of the excavated area shall be leveled both
longitudinally and transversely, as directed, by removing excess soil and watering, as
required. No earth filling will be allowed for bringing it to level, if by mistake or any
other reason, excavation is made deeper or wider than shown on the drawings or as
directed. The extra depth or width shall be made up with sand filling, as specified for the
bottom level of the subsequent finishing at the cost of the Contractor or as directed by
Engineer-In-Charge.
The Contractor shall at his own expense and without extra charge make provision
of supporting all utility services, lighting the excavated areas, separating and stacking
serviceable materials nearly, shoring, timbering, strutting, bailing out water either sub-
soil or rainwater, including pumping at any stage of the work. all Excavation work must
executed with manual labour only.
4.2. Precautions :
The blasting operation shall remain in charge of competent and experienced supervisor
and workman who are thoroughly acquainted with the details of handling explosives and
blasting operations. The blasting shall be carried out during fixed hours of the day,
preferably during the mid-day-lunch hours or at the close of the work as ordered in
writing by the Engineer-in-charge. The hours of blasting shall be notified in advance to
the people in the vicinity. All the charges shall be prepared by the man in charge only.
Red danger flags shall be displayed prominently in all directions during the blasting
People except this who actually light the fuse shall be prohibited from entering into this
area. The flag shall be stationed as 200 m. from the firing site in all directions and all
persons including workmen shall be excluded from the flagged area at least 10 minutes
before the firing warning whistle being sounded for this purpose.
During excavation in rock by blasting, the lowest 15 cm. of the stratas shall be blasted
with light charges so as not to shatter or weaken the underlying rock on which the
foundation will be actually laid. If excavation in rock is done to larger width and lengths
than those shown on the drawings or as directed, no payment shall be made for such
over break. If excavation is done to depth grater than shown on the drawings or
directed, excess depth shall be made up with foundation grade concrete as directed at
the contractor’s cost.
The charged hole shall be drilled to the required depth and in suitable places when
blasting Is done with powder, the fuse cut to the required length shall be inserted in the
holes and the powder dropped in. The powder shall be gently tamped with copper rod
with rounded ends. The explosive powder shall then be covered with trapping materials
which shall be tamped lightly but firmly. When blasting is done with dynamite and other
high explosive dynamite cartridges shall be prepared by inserting the square cut ends of
fuse into the detonator, and finished with dippers at the open ends. The detonator
should be gently pushed into the premier leaving one third of the copper exposed
outside. The primer shall be housed into the explosive. Bore holes shall be of such size
that the cartridges can be easily passed down. The primer shall be cleared of all debris
and explosive inserted. The space for about 20 cms. above the charge shall then be
gently filled with dry clay pressed home and rest of the tamping is firmed with any
convenient materials gently packed with a wooden cover.
At a time, not more than 20 such charges shall be prepared and fired. The man in
charge shall blow a whistle in a recognised manner for cautioning the people. All the
people shall then be required to move to safe distances. The charges shall be lighted by
the man in charge only. The man-in-charge shall count the number of explosions. He
shall satisfy himself that the charges have been exploded before allowing the workman
to go to the work site.
The contractor shall be fully responsible to strictly follow the prevailing rules and
procedures regarding blasting procedures.
In case of a misfire the following procedure shall be observed :
Sufficient time shall be allowed to account for the delayed blast. The man in charge shall
inspect all the charges and determine the missed charge.
If it is the blasting powder charge, it shall be completely flooded with water. A new hole
shall be drilled at about 45 cm. from the old and fired. This should blast the old charge.
Should it not blast the old charge. Should it not blast the old charge, the procedure shall
be repeated till the old charge is blasted.
In case of charge of gelatin, dynamite etc. the man in charge shall gently remove the
tamping and the primer with detonator. A fresh detonator and primer shall then be used
to blast the charge. Alternatively the hole may then be drilled 15 cm. away and parallel
to it. This hole shall then be charged fired when the misfired hole should explode at the
same time. The man in charge shall report to the office at once all cases of misfire, the
cause of the same and what steps were taken in connection therewith.
If a misfire has been found to be due to defective detonator or dynamite, the whole
quantity in the box from which defective article was taken must be sent to the authority
as directed for inspection to ascertain whether all the remaining materials in the box are
also defective or not.
4.3. Accidents :
The contractor shall be solely responsible for any accident during the entire procedure of
handling explosive and blasting and shall pay necessary compensation to persons
affected or damage t lands or properly etc., due to the blasting without extra claims on
the department.
A careful and day-to day account of explosives shall be maintained by the contractor in
an approved manner and shall be open to inspection of the Engineer-in-charge at all
times. Surprise visit may also be paid by the Engineer-in-charge to the storage and in
case of any unaccountable shortage or unsatisfactory accounting, the contractor shall be
liable to be penalised by forfeiture of part or whole of his Security Deposit or by
cancellation of tender in which case be shall not be entitled for any compensation.
4.5. Disposal of Excavated materials :
No materials excavated from foundation trenches of whatever kind they may be, are to
be placed even temporarily nearer than1.5m. of distance prescribed by the Engineer
from the outer edges of excavation. All materials excavated shall remain the property of
Government. Rate for excavation includes sorting out of useful materials and stacking
them separately as directed within the specified lead. Materials suitable and useful for
back filling or other use shall be stacked in convenient places but not in such a way as to
obstruct free movement of men, animals and vehicles or encroach upon the area
required for constructional purpose. The site shall be left clean of all debris on
Disposal of excavated materials is subject to the following :
Unsuitable materials obtained from clearing site and excavation shall be disposed off
within a lead of 50 meters as directed. useful materials obtained from clearing site and
excavation shall be stacked within a lead of 50 M. beyond the building area as directed.
Materials suitable for back filling shall be stacked at convenient places within a lead of
50 M. from the structure for reuse. Useful stones from rock excavation shall be stacked
neatly within a lead of 50 M. and will be allowed to be used by the contractor on
payment at rates laid down in the contract or if not so aid down, at schedule of rates of
the Division or at a mutually agreed rates if there are no such rates in the Schedule of
If surplus materials are required to be conveyed beyond 50 M. conveyance will be paid
for under a separate item.
4.6. Mode of measurement and payment :
The work shall be measured for the work limited to the dimensions shown on drawings
or directed, Excavation to dimensions in excess of the above will not be measured or
paid for and if so ordered by the Engineer the contractor shall have to fill up the excess
depth with cement concrete specified for foundation without extra payment.
Driving of sounding bards, drill holes to explore the nature of substratum upto a total
length of meter distributed in 2 or 3 places in each foundation if necessary, will be
considered incidental work and eill not be paid for separately.
Removal of slips and blows in the foundation trenches will not be measured or paid for.
If it is necessary in the opinion of the Engineer-in-charge to carry foundation below the
levels shown on the plants the excavation for the first 1.5 M. of additional depth will be
included in the quantity for the particular classification and will be paid for as extra work
at rate to be decided under the general conditions of contract unless the contractor
unless the contractor is willing to accept payment as tendered rates.
The rate shall be for a unit of one cubic meter.
Dismantling the following including loading, unloading and disposal of unserviceable
material for all lead or as directed by Engineer-In-Charge and stacking the serviceable
material and backfilling the resulting trenches and pits complete.
a. central verge -kerb stone.
b. Dismantling tiled or stone floors laid in mortar including stacking of
serviceable material and disposal of unserviceable material with all lead and
c. Demolition & disposal of unserviceable material with all lead and lift for
unreinforced concrete.
d. Demolition of brick work & stone masonry including stacking of serviceable
materials and disposal of unserviceable materials with all lead and lift (1) In
e. Demolition including stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift. (I) R.C.C work.
The demolition shall consist of demolition of one or more parts of the structure as specified
or shown in the drawings. Demolition implies taking up or down or breaking up. This shall
consist of demolishing whole or part of work including all relevant item as specified or shown in
The demolition shall always be planned before hand and shall be done in reverse order of
the one in which the structure was constructed. Contractor is fully responsible for proper and safe
Necessary dropping, shoring and under pinning shall be provided for the safety of the
adjoining work or property, which is to be left intact, before dismantling and demolishing is
taken up and the work shall be carried out in such a way that no damages is caused to the
adjoining property.
Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary
precautions shall be taken to keep the dust nuisance down as and where necessary.
Dismantling shall be commenced in a systematic manner. All materials which are likely to
be damaged by dropping from a height or demolishing roof, masonry etc. shall be carefully
dismantled first. The dismantled articles shall be properly stacked as directed. All materials
obtained from demolition shall be the property of Government unless otherwise d shall be kept in
safe custody until handed over to the Engineer-in-charge.
Any serviceable materials, obtained during dismantling or demolition shall be separated out
and stacked properly as directed, with all lead and lift. All unserviceable materials, rubbish etc.
shall b stacked as directed by the Engineer-in-charge.
On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
Mode of measurements & payment :
Measurements of all work except hidden work shall be taken before demolition
dismantling and no allowance for increase in bulk shall be allowed. The demolition of lime
concrete shall be measured under this item. Specification for deduction for voids, openings etc.
shall be on same basis as that employed for construction of work.
All work shall be measured in decimal system as fixed in its place subject to the following
limits, unless otherwise stated hereinafter : (a) Dimensions shall be measured to the nearest
mt. (b) Area shall be worked out to the nearest 0.01 sq. mt. (c,d,e) Cubical connection shall be
worked out to the nearest 0.01 Cu.m.
The rate shall include cost of all labour involved and tools used in demolishing and
dismantling including scaffolding. The rate shall also include the charges for separating out and
stacking the serviceable materials properly and disposing the unserviceable materials with all
lead and lift. The rate also includes for temporary storing for the safety of the portion not
required to be pulled down or of adjoining property and providing temporary enclosures or
partitions where considered necessary.
The rate shall be for a unit of
one cubic metre. For
Dismantling of Tiled Floor:
The relevant specifications shall be followed except the dismantling of tiled or stone floors
laid on mortars shall be done Dismantling implies carefully taking up or down or these are fixed
by nail screws bolts etc. the shall be taken out with proper tools.
Mode of measurement & Payment :
The supporting materials such as joints beams if any etc. shall be measured separately. The rate
shall include stacking the unserviceable materials as directed will lead and lift.
The rate shall be for a unit of (a) RMT (b) one sq. Meter (C) CMT(d)Cu.m(e)Cu.m
Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage, sludge,
excavated rock, fly ash, aggregates of any kind Including spreading & levelling etc.
e) Lead From 5 Km to 10 Km.
f) Lead From 10 Km to 15 Km.
All the surplus earth etc. shall be carried away immediately from the site of work
to a place within 5km.distance or as directed and ordered by the Engineer, so as not
to cause any inconvenience to the public traffic finding which in view of public safety
and traffic convenience. The corporation shall carry out the work byany other
agency at the contractor’s risk and cost. If the instructions are not completed within
days from the date of order to cart the surplus materials and clear the site, the
said work shall be carried out by the Municipal Corporation at the risk and cost of
the contractor and no claim or dispute shall be entertained in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be
done and the same shall be carried out by the contractor without asking any extra
rate. The contractor shall have to cart the surplus earth after the trenches we will
watered and refilled with the sand. The rate of carting including carting of brickbats,
metal, rubble vegetable and garbage, if necessary to clear the road surface.
The rate shall be for a unit of one cubic meter.
Extra rate over item of excavation of earth for excavation of asphalt pavement / RCC of
thickness up to 0.20 meter including demolishing the asphalt carpet, metal, soiling/cutting
Reinforcement etc. comp. with stacking the material as directed. (a) up to 0.20 meter
thickness (By Manual)(b) 0.20 to 0.30 meter (By any type of Breaker Machine or
R.C.C.Cutter machine including cost of operator, fuel, & transportation etc complete.(c)
0.30 meter & above (By any type of Breaker Machine or R.C.C.Cutter machine including
cost of operator, fuel, & transportation etc complete.
The Item shall be carried out as per Item description and as per instruction of Engineer-in-Charge
and/or his authorized representative.
The rate includes the cost of excavation of bituminous macadam i.e. bituminous layers only
like DBM, BC etc including the labours, tools, equipment and all other incidental expenses. Non
Bituminous Sub-layer/Sub base are not considered in this item.
Work shall be carried out manually or by Machinery as
per site requirements. The mode of payment for this
item shall be on Smt. Basis.
Providing and laying cement concrete 1:3:6 (1- Cement : 3- Coarse sand : 6- Hand
broken stone aggregates 40mm nominal size) and curing complete.
Before starting the concrete the bed of the foundations trenches shall be cleared
of all loose materials and watered and rammed as directed .
The proportion of cement, sand and coarse aggregate shall be one part of
cement, 3 parts of sand, 6 parts of stone aggregates and shall so measured by volume.
The concrete shall be mixed in a mechanical mixer at the site of work. Hand
mixing may however be allowed for smaller quantity of work if approved by the
Engineer-incharge. When hand mixing is permitted by the Engineer-in-charge incase of
breakdown of machinery’s and in the interest of the work. it shall be carried out on a
water tight platform and care shall be taken to ensure that mixing is continued until the
mass is uniform in colour and consistency. However in such cases 10% more cement
than otherwise required shall have to be used without any extra cost. The mixing in
mechanical mixer shall be done for a period 1 to 2 minutes. The quantity of water shall
be sufficient to produce a dense concrete of required workability for the purpose.
The concrete shall be handled from the place of mixing to the final position in not
more than 15 minutes by the method as directed and shall be placed into its final
position, compacted and finished within 30 minutes of mixing with water i.e. before the
setting commences.
The concrete shall be laid in layers of 15 cms. to 20 cms.
The concrete shall be rammed with heavy iron rammers and rapidly to get the
required compaction and to allow all the interstriees to be filled with mortar.
After the final set, the concrete shall be kept continuously wet, if required by pounding
for a period of not less than 7 days from the date of placement
The concrete shall be measured for its length breadth and depth, limiting
dimensions to those specified on plan or as directed.
The rate shall be for a unit of one cubic meter.
Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick
work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I.
steps and existing MH sheet cover, removing the debris from MH and carting the same as
a. up to 0.15 mt. (@ Two Coarse)
b. up to 0.35mt. (@ Four Coarse)
The rate shall be for a unit of no.
Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing chamber
sheet cover, removing the debris from chamber and carting the same as directed.
The rate shall be for a unit of no.
Providing, supplying and fixing precast C.C. blocks (M-20) edge kerb having size of 75 x
300 x 300 mm depth and as per design conveying it to the site, jointing into C:M 1:3 and
racking out the joints incl. necessary excavation of asphalt, soil etc..completed.
The rate shall be for a unit of RMT
Pre cast concrete kerb Providing and fixing M25 Grade of concrete precast exposed /
Fair finish / texture finish kerb stones of approved make as per approved sample of any
size and any type.Kerbs shall be fixed on the foundation prepared as per approved
design. The rate shall also include for erecting and fixing the pieces in position for
complete kerb system with chamfered type of including necessary accessories of kerb
like radius kerbs, angles and quadrant kerbs, droplet kerbs etc. complete as per
drawing. Kerb shall be fixed as paper joint without any jointing material.However
cement mortar shall be provided at the kside of kerb stone joint. (Sample must be
approved) Cost of excavation, cutting , base , side filling shall includes as directed
engineer - incharge in above item description as per BOQ (b) 380 x 600 x 150 mm high
Footpath kerb.Approved Rate - Road Project
The rate shall be for a unit of RMT
Providing and fixing pre-cast concrete kerb stone of gray cement based concrete block
30cm length,30cm height and 15cm thick of M200 grade concret as per approved design
and including excavation for fixing in proper line and level,filling the joint with C:M 1:3
(1cement:3fine sand) etc complete.Item Code-14023A (Rate in Rs.for 2023-24) SOR
The rate shall be for a unit of RMT
Supplying and fixing of 450 mm H x 300 mm L x 150 Below..100 mm B Above Double
Teper Kerb block for footpath/Central Verge in M-20 grade using 20 mm nominal size
black trap aggregate of Sevaliya/Timba or equivalent quality for pre-cast blocks,
reasonably exposed finish/ formwork, mould with well equipped with vibratory system
for kerb stones of approved design including curing, etc. complete, including the cost of
formwork etc. complete. The rate shall also include fixing the Kerb stones in line and
level on 5 cm thick sand bedding with necessary equipments and materials. The rate shall
also include the flush pointing in CM (1:3) for all joints of the kerbstones.
Trenches of specified width and depth shall first be made along the edges of the
wearing course of the road or along the line of pave block flooring to receive the
restraint blocks. The bed of the trenches shall be compacted manually with steel
rammers to a firm and even surface and then stones shall be set in P.C.C.
The edge restraint blocks shall be laid with their length running parallet to the
paving edge, true in line and gradient. The joints of blocks shall be not more than
mm and filled with the CM 1:3 ( 1 cement : 3 fine sand ) which shall be cured for
Finishing The edges shall be restored and all surplus earth including rubbish etc.
disposed off as directed by the Engineer-in Charge.
Measurements Length of the finished work shall be measured in running metre
along the edge of the paving correct to a cm.
Rate The rate shall include the cost of the materials and labour including stone of
specified material involved in all the operation described above. The rate shall be for a
unit of one meter basis.
Paver Block Providing and laying shot blasted Non - interlocking, Paver blocks of
specified thickness, size, grade of concrete and colour machine made and blasting by
automatic shot blasting machine and high density of as per approved sample of
approved make for footpath, parking areas, service lanes,cross over and other areas as
mentioned in the drawing. Including providing and laying 50 mm thick averave bedding
layer of coarse sand below paver block as per required grading and specification. Laid
paver block shall be mechanically compacted. The work of the paving blocks shall be
executed in line and level by skilled mason of flooring work only. Small size of paver
block with same specification shall be used at residue or at end. It should be laid in such
a way that the no cutting of the paver block to be necessary. If cutting of paver block
shall be required , than cut by machine only and laying to be done by skilled flooring
mason. The finished surface of the paver block shall have coarse sand Texture Finish.
Pave blocks shall be compacted and shall be re-laid if necessary. Actual laid area shall
be measured and paid without any wastage. (A) 60 mm thick M-35 grade Grey Paver
block of size 200mm x 200mm. Approved Rate - Road Project
1.0 The scope of work: It includes supplying and laying of Precast shot blasted by automatic shot blasting
factory (not on site) paver blocks at footpath, parking area, service lane and other areas.
The work includes:
1.1 Paver block should be laid over prepared sub grade.
1.2 Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks.
1.3 Manufacturing of paver blocks by one of the approved suppliers as per requirements intechnical
1.4 Supplying of paver blocks at site, including handling at both ends. The type of paver block may be
interlocking or noninterlocking.
1.5 Providing and laying average 50 mm coarse sand bedding for laying blocks.
1.6 Laying of paver blocks at site as per requirement in technical specification, within shortest possible time.
1.7 Testing of paver blocks through reputed Govt. /Non Govt. Test house and submission of test results as
requirements in Technical Specifications. Client reserves the right to carryout test at random. Cost for such
borne by contractor.
1.8 The contractor shall guarantee that all material and components designed, fabricated, supplied and laid
be free from any type of defect due to faulty material and/or workmanship/erection for a period of five year
date of completion of work at individual sites. However, the contractor for five years shall render free
2.0 Technical Specifications:
2.1 Paver Block Manufacturing Facilities:
The Paver Block shall be made in factory with following minimum facilities:
Concrete Block making Machines:
The machine should be capable of producing high quality Paver Blocks by obtaining high level of compaction
application of hydraulic compaction and also by high intensity vibration to the moulds. The machine should
automatic control panel for uniformity in strength.
Concrete Batching & Mixing Plant: (Not essential) The concrete Mix Design should be followed for each batch
materials. The concrete ingredient should be mixed in concrete Batching & Mixing plant with minimum
cum/hour. The plant should be equipped with automatic control panel for maintaining water cement ratio from
batch to obtain concrete of uniform quality and strength.
The plant should be equipped with adequate mechanism for mechanized loading of raw materials into mixer
conveyor belt for transportation of concrete from mixer to concrete block making machine to maintain quality
The factory should have well designed curing area to ensure adequate curing of paver blocks. Steam curing
facility of the
paver blocks is preferable.
Laboratory (Desirable but not essential) :
The factory should have the following:
Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
(1) Systematic record of test results of various paver blocks manufactured in the factory.
(2) Concrete Mix Design for various grade of concrete used for making of paver blocks.
2.2 Specifications for Coloured Paver Blocks:
Colour concrete paver blocks shall be manufactured as per attached specifications using approved colour
Pigment of iron
oxide of approved brand like Bayer, Tata etc. with minimum colour pigment of 3% by weight of cement. The
shall be as selected by Architect before commencement of the work. The job also includes providing 50 mm
bedding to match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from the
of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of Color pavers will be as per
2.3 Paver Block Characteristics:
The concrete pavers should have perpendicularities after release from the mould and the same should be
The surface should be reasonably smooth and of anti skid and anti glare type. The paver should have uniform
facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand filling after
the paver Surface.
The concrete mix design should be followed for each batch of materials separately and automatic batching
used to achieve uniformity in strength and quality.
The pavers shall be manufactured in Double layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying, desired shape of the
adequate compaction of the sand in the joints.
2.4 Paver Block Dimensions:
Layers Double layered, top layer minimum 8 to 10 mm
Shape Irregular (Uniform Shape with no Hollow Or Cracks) / as per drawing
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey Colour without use of any pigment.
For Colour pavers refer “specifications for Colour pavers”
Dimensional (+/-) 2mm for length & width,
Tolerance (+/-) 3mm for Height (Thickness)
2.5 Testing of Paver Blocks:
* Sampling and testing procedure as per enclosed specifications
3.0 Sampling & Testing Procedures for Paver Blocks:
3.1 Sample Size:
INTERNAL – Average of minimum 3 samples per 10000 Blocks for compressive strength and water
EXTERNAL – Minimum 2 Blocks per 10000 blocks for abrasion and flexure.
3.2 Sampling For Testing: Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
Compressive Strength: Testing for compressive strength shall be undertaken in accordance with Appendix-B.
compressive strength of the blocks tested shall be 30/40 N/Sq.mm as per thickness.
Abrasion Resistance: Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement
Flexural Strength: Testing for flexural shall be in accordance with IS 1237 (Specifications for Cement Concrete
Water Absorption: Testing for water absorption shall be in accordance with IS 2185:1979: Part I (Specifications
Concrete Masonry Units).
Method of sampling: Before laying paver blocks, each designated section comprising not more than
be divided into five approximately equal groups. One block shall be drawn from each group i.e. 3 for internal
for external testing.
Marking and identification: All samples shall be clearly marked at the time of sampling in such a way that the
sections of part thereof, and the consignment represented by the sample, are clearly defined.The sample
dispatched to the approved test laboratory taking precaution to avoid damage to the paving in transit. Protect
from damage and contamination until they have been tested. The testing shall be carried as soon as possible,
sample has been taken. As soon as practicable after sampling. The samples shall be stored in water at
hours prior to testing.
SR.NO. * TEST SPECIFICATION Average Values
(Average of Minimum Five Samples/Site)
1. Compressive Strength Min. 30 N/Sq.mm for 60mm thick and Min. 40 N/Sq.mm
2. Flexural Strength Minimum 3.80 N/Sq.mm and 4.5 N/ Sq. mm for 60 and
mm thick paver block respectively.
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
5. Minimum Cement Content 380 Kg/Cum for M 30 concrete and 430 Kg/Cum for M 40 concrete
3.0 Sampling & Testing Procedures for Paver Blocks:
3.1 Sample Size:
INTERNAL – Average of minimum 3 samples per 10000 Blocks for compressive strength and water
EXTERNAL – Minimum 2 Blocks per 10000 blocks for abrasion and flexure.
3.2 Sampling For Testing: Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
Compressive Strength: Testing for compressive strength shall be undertaken in accordance with Appendix-B.
compressive strength of the blocks tested shall be 30/40 N/Sq.mm as per thickness.
Abrasion Resistance: Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement
Flexural Strength: Testing for flexural shall be in accordance with IS 1237 (Specifications for Cement Concrete
Water Absorption: Testing for water absorption shall be in accordance with IS 2185:1979: Part I (Specifications
Concrete Masonry Units).
Method of sampling: Before laying paver blocks, each designated section comprising not more than
be divided into five approximately equal groups. One block shall be drawn from each group i.e. 3 for internal
for external testing.
Marking and identification: All samples shall be clearly marked at the time of sampling in such a way that the
sections of part thereof, and the consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid damage to the
transit. Protect the paving from damage and contamination until they have been tested. The testing shall be
soon as possible, after the sample has been taken. As soon as practicable after sampling. The samples shall
water at 20 degree C 5 degree C for 24 hours prior to testing.
Test For Compressive Strength:
Testing Machine: The testing machine shall be of suitable capacity for the test and capable of applying the load
rate specified. It shall comply, as regards repeatability and accuracy, with the requirements of clause 2.1 of
Procedure: The sample specimen shall be tested in a wet condition after being stored for at least 24 hours in
maintained at a temperature of 20 C + or – 5 C. Before thespecimens are submerged in water, the
necessary area shall
The plates for testing machines shall be wiped clean and any loose grit or other material removed from the
of the specimen. Plywood, nominally 4 mm thick shall be used as packing between the upper and lower faces
specimen and the machine plates and these boards shall be larger than the specimen by the margin of at
at all points. Fresh Packing shall be used for every specimen tested.
The specimen shall be placed in the machine with the wearing surface in the horizontal plane and in such a
axes of the specimen are aligned with those of the machine plates.
The load shall be applied without shock and increased continuously at the rate of approximately 15 N/ Sq.mm
until no greater load can be sustained. The maximum load applied to the specimen shall be recorded.
Calculation of corrected strength for individual Blocks: The compressive strength of each block specimen shall be
calculated by dividing the maximum load by full cross section area of the block and multiplying with an
appropriate factor
a) For 100 mm thick blocks –
b) For 80 mm thick blocks –
c) For 60 mm thick blocks –
Ahmedabad Municipal Corporation
Compressive Strength Calculation: The average corrected compressive strength for the designed block section
4.0 Method of laying:
Blocks shall be placed on the sand bedding etc. which were well rammed so as to act as firm bed. Blocks
shall be laid in
such manner that no gap shall be left in between. Blocks so laid shall be compacted by means of mechanical
equivalent compacting method so as to obtain required finished surface. All the joints shall be matched and if
manufacturing defect is detected the lot shall be replaced and relaying shall be done with out any extra cost
satisfaction of Engineer in charge.
50 to 80mm thick coarse sand shall be laid as cushioning layer for arranging the paver blocks. Joints of the
shall be filled with the sand.
The paver blocks shall be laid properly on the prepared sub-base as per manufacturer's specification and as
and Engineer-in-charge's instruction.
Paver block shall be laid by the approved agency only. If manufacturer of the paver block providing the laying
then it shall be laid through the supplying agency only. The labourers for paver block fixing shall be skilled
only. Only cutting tool shall be used for cutting the paver block. Full depth cutting toll shall be used for proper
surface after cutting. Manual cutting or breaking of the paver block is not permitted.
After laying of the paver block fine sand shall be spread over it and paver block shall be compacted with
compactor. Any settlement or undulation in the laid area shall be repaired immediately.
5.0 Mode of Measurement and payment:
Measurement shall be done as per actual area laid without considering any wastage.
The Measurement of the item shall be in Sqmt basis.
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete
block 60mm thick with grade of concrete M300 pnumatic compressed / vibrated
mechanically and as per approved design Confirming to IS 15658 : 2006 including
mm Sand layer for levelling and filling the joint with sand in proper line and level
as per guidlines of IRC : SP 63- 2018 etc. Complete. Item Code-14033 (Rate in
Rs.for 2023-24) SOR
The Measurement of the item shall be in Sqmt basis.
Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to
mt including excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the
prop. of CM (1:6) with 40 mm thick IPS flooring in the prop M15 at bottom and
mm thick cement plaster inside the catch pit in the proportion of CM (1:3) with out
jali etc. comp. as directed.Approved Rate - Road Project
The Measurement of the item shall be in no.
CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with frame 600mm x
600mm clear opening etc. comp.. As directed by engineer in charge.
The Measurement of the item shall be in no.
Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.
(SET cover and frame) F.R.C. Heavy Duty [HD-20] Machinehole Covers & Frames- 560mm ø
clear opening, The dimension of frame and cover
(SET cover and frame) F.R.C. Medium Duty [MD-10] Machinehole Covers & Frames- 560mm
ø clear opening, The dimension of frame and cover
(SET cover and frame) F.R.C. Medium Duty [MD-10] Chamber Covers & Frame- 600 x
mm clear opening, The dimension of frame and cover
Providing and fixing Swiss type bollard made out of 1.5mm CRC sheet ,height
140cms,bottom dia 23cm,top dia 12cm with direction plate of 30 cm dia fabricated
necessary anchors as directed and also provide through out lengh pipe of 25 NB for
the strenthing of bollard and reflectorised Micro Prismatic Grade Sheet (Type
XI)and three yellow strip 6 Inches wide of Type XI Retro reflective Sheeting, fixing
with P.C.C M25 grade concrete(Foundation size 30cm×30cm×35cm). sor 21-22
The Measurement of the item shall be in no.
Filling of Zari along the sides of the kerbstone fixed, prepared with Bituminous
Concrete mixed in proper proportion as directed by Engineer- In -Charge to form a
pourable mixture.sor 2021-22
The Measurement of the item shall be in rmt.
Construction of RCC nosing in central verge using M-200 grade cement
concrete. The item includes cost of centering & shuttering, reinforcement, both side
cement plaster in C:M 1:3 mortar & curing etc. complete. Half round portion of the
nosing shall be made by using mild steel.sor 2021-22
The Measurement of the item shall be in no.
Painting one coats (excluding priming coat) on previously painted steel and other
metal surface with enamel paint, brushing to give an even shade including cleaning the
surface of all dirt, dust and other foreign matter...(R&B SOR 2023-24 ITEM CODE
19003 PAGE NO-136)
The Measurement of the item shall be in Smt
Extra over item every subsequent coat of paint.((R&B SOR 2023-24 ITEM CODE
19004 PAGE NO 136)
The Measurement of the item shall be in Smt
Painting Two Coats on divider and footpath curb surface / New Concrete Surface (
Painting two coats after filling the surface with synthetic enamel paint in all shades
on new plastered concrete surfaces) (AMC approved Rate )
The Measurement of the item shall be in Smt
Applying priming coat over old kerb surface after and including,preparing the surface
with ready mixed priming paint brushing red lead
The Measurement of the item shall be in Smt
Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. directed.
(SETcover and frame) F.R.C. Extra Heavy Duty [EHD-35] Machinehole Covers &
Frames- 560 mm ø clear opening, The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592:2002 table1 (As per Central Store Approve
Rate Circular dated 21/04/2025, Item No. 1, without GST)
The Measurement of the item shall be in Set
Providing and fixing tree guard with grey exposed finish in grade M20 with nominal
steel and wall thickness of 80 mm outer size 800X800mm Approved Rate - Road
The Measurement of the item shall be in No.
Supplying, labour for break down repairing work for activities like excavation,
disliting, removing debris from trench back filling etc. comp. as directed by
The Measurement of the item shall be in No.
Labour charges - Mazdoor (Male) It Code -1051 SOR 2023-2024
The Measurement of the item shall be in No
Labour charges - Mason 1st ClassIt Code -1047 SOR 2023-2024
The Measurement of the item shall be in No
Providing formwork of ordinary timber planking so as to give a rough finishi
ncluding centering shuttering strutting and propping etc.Height of propping and
centering belows up porting floor to ceiling not exceeding 4M. and removal ofthe
same for in situ reinforced concrete and plain concrete work in.(A)Foundations
Footings Bases of Columns etc. and Mass concrete. Item Code -09001AA SOR 2023-
The Measurement of the item shall be in smt.
Providing TMT Bar FE 500D reinforcement for R.C.C.work including bending,
binding and placing in position complete up to floor two level (SOR BUILDING
WORKS AHMEDABAD CITY (WITHOUT GST) YEAR:- 2023-24, Item code
The Measurement of the item shall be in Kg.
Providing and laying cement concrete 1:2:4 (1-Cement : 2- Coarse sand : 4- graded
stone aggregates 20 mm nominal size) and curing complete excluding cost of formwork
in (A) Foundation and Plinth, tem Code- 05010AA (Rate in Rs.for 2023-24) SOR
The Measurement of the item shall be in cmt.
Providing and Laying ordinary cement concrete 1:2:4(1-Cement2- coarsesand:4-
gradedstone aggregates 20 mm nominal size) and finishing
smoothwithcuringetc.completeincludingthecost of formwork but excluding the cost of
reinforsement for R.C.Cwork in (iv) Slabs having more than 13 cm and upto
cm.thickness. tem Code- 05026D (Rate in Rs.for 2023-24) SOR
The Measurement of the item shall be in cmt.
Providing and laying in position Ready Mixed M-200 grade concrete for reinforced
cement conctere work , using cement content as per approved Design Mix
manufactured in fully automatic batching plant and transported to site of work in
transit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured
as per mix design of specified grade for reinforced cement concrete work including
pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering
shuttering finishing and reinforcement including cost of admixtures in recommended
proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve
workability without impairing strength and durability as per direction of the Engineer
- in - charge. Without Fly Ash (Min cement level as per latest IS 456 shall be
maintained) Item Code - 5055 SOR 2023-2024
The Measurement of the item shall be in cmt.
P/A Trimix with dewatering machine and floater machine on constructed RCC
work incl.cost of machine and labour etc comp as directed. (Approved Rate)
The Measurement of the item shall be in smt.
Making 15 mm groove in RCC work on road and filling it with polysulfied
sealant and finished it good incl. all labour charges etc comp as directed. (Approved
The Measurement of the item shall be in rmt.
Providing and laying for approved quantity (ISO Certified brand) floor
hardener @ 3.0 kg/Smt.Approved Rate - Road Project
The Measurement of the item shall be in smt.
Seal and Signature of the Bidder Add.City Engineer(West Zone)
Amdavad Municipal Corporation
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl – vrùbÍtul
vrùb Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg<
mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg
vwhtJt mt&u) yawf mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^
fhJh Wvh xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb <&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkch yJ~g
œNtoJJtlt hnuNu. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu mhltb wMvÐ yûthtubtk jFJw.
4. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
5. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
6. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh
auf&e s MJefthJtbtk ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele
ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e
Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch
yJ~g jFJtltu hnuNu. ftuLx[t¾xhu vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u
mbglu ftble BþÆ<btk bshu ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^
>huf xuLzhh ujuJe.
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe
<vtm fhelu s xuLzh btufjJw.
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf,
rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe
zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto
Jdhle mne mefft fhe mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. dwsht< mhfth ©b,ftuiNÕg ylu htusdth rJCtd îtht XhtJ ¢btf:LED/WRT/e-file/11/2024/0293/M2
mraJtjg ,dtk^eldh <t.15.02.24 lt XhtJ v{btKu yusLme/¢tuLx[fxhtulu îtht ©bgtude ftgœtle studJtR vhevqKo
&tg <u mwrlµ< fhJtlwk hnNu.
16. ybœtJtœ Bgwrlrmvj ftuvtuohuNl îtht ybœtJtœ Nnuh lt ltdheftulu vwhe vtzJtbtk ytJ<e mwrJ^tytulu jd<e Vhegtœ
ltuk^Jt btxu me.me.yth.yum «tusufx ybj bwfJtbtk ytJuj Au.su yk<do< su <u zevtxobuLx JtRÍ le fuxdhe lt «tuçjb
lt rlhtfhK btxu yum.yuj.yu mbg dt¤tu rl^tohe< fhJtbtk ytJuj Au.su yk<do< vrµbÍtullt lJhkdvwht Jtuzolt htuz
ylu Vwxvt< Jtr»tof huRx xuLzhbtk bhtb<-rlCtJltk htuz ylu Vwxvt& buLxulLm lt swœt swœt ftbtu btxu ltdhef
yr^fth vºtfbtk sKtJuj mbg bgtoœtbtk Vhegtœltu rlftj fhJt <ubs muJtfeg ftbdehe mbg bgtoœtbtk vqKo &tg <u
btxu R-dJolLm me.me.yth.yum. «tusufx yk<do< <t.21.08.2021 lt mhfgwjh <&t mexe Rsluh Ft<w vrhvºt
lk.2,<t.07.10.2023 lt vrhvºt,Bgw frb.©ebe <t.23.04.2026 le belexm ytuV bexekd lt bwœt lk.21
ylwmk^tlu leau bwscle mtbuj fhuj Nh<tu bwscle vulÕxe Jmwj fhJtle Nh<u bkswhe y&uo mtœh fhuj Au
xuLzhbtk mtbuj fhuj Nh<tu yt «btKu Au
me.me.yth.yum.btk ltu^t<e Vhegtœ Jtuzolt Rsluh MxtV îtht ftuLx[tfxh/yusLmelu Jtuxmyuv/xujeVtulef btægb&e
y&Jt YcY juFe<btk Vhegtœ ytvJtbtk ytJNu.mœh Vrhgtœle ftbdehe yum.yuj.yu. le mbg bgtoœtbtk
ftbdehe vqKo > ctœ <ult Vtuxtud{tV,mxeoVefux ylu ftbdehe vqKo > le òK yum.yuj.yu. mbg bgtoœtbtk
Jtuzolt MxtVlu fhJtle hnuNu
stu ytvlu ytvuj Vrhgtœ yum.yuj.yu. mbg bgtoœtbtk vqKo lne &tg <tu vulÕxe le hfb ytvlt cejbtk&e Jmwj
ytvlu mtuvJtbtk ytJuj me.me.yth.yum. Vrhgtœtu ltu hevtuxo yXJtzef ^tuhKu rlg< Vtubuoxbtk «btrK< fhe Jtuzo
ytuVemu hsw fhJtltu hnuNu.
ftuLx[tfxh îtht yhsœthlu Vtul fgto ctœ mœh Vrhgtœ yLg Jtuzo fu yLg rzvtxobuLx fu y.Bgw.ftuvtuohuNl lt
ftgoûtuºtbtk l ytJ<e ntuR <ule òK Jtuzo MxtV lu <tðftrjf fhJtle hnuNu.
ftuLx[tfxhle mrn <&t me¬tu yuze.mexe Rsluh (v.Ítul)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 64.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .