Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.6 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹12.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹14.2 LAdmitted-Fee/PreQual/Technical/Finance | -4.01% | ₹14.2 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹14.2 LAdmitted-Fee/PreQual/Technical/Finance AT P O TOPE P S ATTABIRA DIST BARGARH | BARGARH | ODISHA | 768027 | -3.99% | ₹14.2 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.8 L
EMD Value
₹14,828
Closing Date
6 Aug 2026, 5:00 pmClosed
Block Develoment Officer Attabira
attabira
Construction of Additional Classroom at Govt. UP School, Tope GP of Attabira Block for the year 2024-25.
2026_PRBA_136726_1
01/2026-27
Open Tender
Civil Works - Buildings
Percentage
4 days
Attabira Block
building
3 documents required · 3 mandatory
₹6,000
Yes
₹14,828
Yes
7 Aug 2026
23 Jul 2026
7 Aug 2026
23 Jul 2026
6 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK
Earth work in excavation in foundation in hard soil within 50m initial lead and 1.50m lift including rough dressing breaking clods maximum 5cm to 7cm & laying in layers not exceeding 0.3m depth and as per specification approvede by the department. | 39.37 | Cum | 269.72 | ₹10,618.88 |
| 2 | Filling with sand in foundation and plinth with sand including cost conveyance taxes of all material and labour T & P etc. complete in all respect. | 43.38 | Cum | 777.85 | ₹33,743.13 |
| 3 | cement concrete of proportion(1:3:6) in F & P using 40mm size bhg metal of approved quality including all cost, conveyance and royality of all materials and labour with T & P etc. complete in all respect. | 16.1 | Cum | 5,880.84 | ₹94,681.52 |
| 4 | Reinforced Cement Concrete work of M20 grade with 20mm and down grade black and hard granite(Crusher broken) stone chips including hoisting and laying including all cost, conveyance and royality of all materials and labour with T & P etc. complete in all respect. {Column Base & Plinth} | 13.82 | Cum | 7,253.97 | ₹1,00,249.87 |
| 4.01 | Column and Beam | 8.94 | Cum | 17,904.97 | ₹1,60,070.43 |
| 4.02 | Lintel | 2.4 | Cum | 13,995.72 | ₹33,589.73 |
| 4.03 | Roof Slab & Chajja | 13.78 | Cum | 13,561.29 | ₹1,86,874.58 |
| 5 | Straighting, Cutting, bending, binding of steel rods, cranking, hooking, tying the grills & placing in proper position for R.C.C work, including cost of binding wires of 18 to 20 gauge, cost,conveyance, taxes of steel and other materials etc. | 38.93 | Qntl | 7,989.44 | ₹3,11,028.9 |
| 6 | Fly ash brick work in cm (1:6) with brick size 23*11*8 cm etc. complete in Foundation. | 16.57 | Cum | 5,601.68 | ₹92,819.84 |
| 7 | Fly ash brick work in cm (1:6) with brick size 23*11*8 cm etc. complete in Super Structure. | 26.47 | Cum | 5,635.01 | ₹1,49,158.71 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
Tendernotice_2.pdf
PDF • 1.54 MB
BOQ_602796.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].