Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹13.8 L
EMD Value
₹13,900
Closing Date
27 Nov 2026, 6:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Officer Kadi nagarpalika
PROVIDING, SUPPLYING AND TESTING OF PUMPING MACHINARY FOR BORE, SUMP & UNDER BRIDGE FOR KADI NAGARPALIKA, AT KADI. DIST. MAHESANA UNDER 15TH FINANCE COMMISSION 2025-26 GRANT.
364484
1313/7/2026-27
Open
Mechanical Works
Works
Mehsana
12 documents required · 11 mandatory · 1 optional
₹1,062
Chief Officer Kadi nagarpalika
₹13,900
7 Nov 2026
7 Nov 2026
7 Nov 2026
27 Nov 2026
7 Nov 2026
120 days
NAME OF WORK : PROVIDING, INSTALLING AND TESTING OF PUMPING MACHINARY FOR BORE, SUMP &
UNDER BRIDGE FOR KADI NAGARPALIKA, AT KADI. DIST. MAHESANA UNDER 15TH
FINANCE COMMISSION 2025-26 GRANT.
Schedule No Name of work Amount
PROVIDING, INSTALLING AND TESTING OF PUMPING MACHINARY FOR
KADI NAGARPALIKA, KADI
PROVIDING, INSTALLING AND TESTING OF PUMPING MACHINARY AT
UNDER BRIDGE FOR KADI NAGARPALIKA, KADI
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing
charges, after deducting the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted
from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all
2) conditions, site moisture weather etc.
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the
difference in consumption of cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender.
However no extra payment shall be made for use of additional Quantity of cement as per actual concrete mix design. Concrete mix
design shall be done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details
4) of work and amount involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be
5) paid by the CHIEF OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills
of the works. (As per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of
7) the Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation
of equipments and conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes excluding GST and department will not entertain any contractor
representation to reimburse any financial burden due to applicable taxes.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
KADI NAGARPALIKA
PROVIDING, INSTALLING AND TESTING OF PUMPING MACHINARY FOR KADI NAGARPALIKA, KADI.
DIST. MAHESANA UNDER 15TH FINANCE COMMISSION 2025-26 GRANT
SCHEDULE - "B-1"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1 2.00 Electric motor driven borewell submersible pump set 67501.33 Rupees Sixty Seven Thousand No.
confirming to IS 8034 and motor confirming to IS Five Hundred One and Thirty
9283 working at 3 phase 400 / 440 volt 50 Hz AC Three Paise
supply & 2900 RPM
(33) 60 HP Cat 8.5, 800 LPM @198 m Head
2 4.00 Monoset Sub. Pump 3 phase 400/440 vott, 50c/s. A.C. 47558.88 Rupees Forty Seven Thousand No.
supply & 2900 RPM as per IS 14220 MOC : Casing : Five Hundred Fifty Eight and
CI-FG260, Impeller : Bronze & Shaft : SS:410 Eighty Eight Paise
(17) 25 HP Cat. SM 4.7, 1860 LPM & 34 m Head
3 2.00 Auto Transformar starter suitable for local & remote 46700.38 Rupees Forty Six Thousand Seven No.
pump control application consisting of Auto Hundred and Thirty Eight Paise
transformer (vaccum impregnated, air cooled having
three (3) tapping at 50%, 65% and 80%), incomer
MCCB / MPCB, overload relay and contactors as per
Type II coordination including digital MFM with RS
485 communication port, analogue type ammeter with
selector switch, run hour meter, required protective
relay & control accessories.
(a) A.T.S. from 51 to 60 HP
4 4.00 Auto Transformar starter suitable for local & remote 24518.76 Rupees Twenty Four Thousand No.
pump control application consisting of Auto Five Hundred Eighteen and
transformer (vaccum impregnated, air cooled having Seventy Six Paise
three (3) tapping at 50%, 65% and 80%), incomer
MCCB / MPCB, overload relay and contactors as per
Type II coordination including digital MFM with RS
485 communication port, analogue type ammeter with
selector switch, run hour meter, required protective
relay & control accessories.
(a) A.T.S. from 21 to 30 HP
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting
the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
KADI NAGARPALIKA
PROVIDING, INSTALLING AND TESTING OF PUMPING MACHINARY FOR KADI NAGARPALIKA, KADI.
DIST. MAHESANA UNDER 15TH FINANCE COMMISSION 2025-26 GRANT
SCHEDULE - "B-1"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions, site moisture
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in consumption of
cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra payment shall be made for use of
additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work and amount
4) involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by the CHIEF
5) OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the works. (As per G.R. (R&B) Deptt.,
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat
7) Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments and conditions of
service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes excluding GST. and department will not entertain any contractor representation to reimburse any
9) financial burden due to applicable taxes.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
KADI NAGARPALIKA
PROVIDING, INSTALLING AND TESTING OF PUMPING MACHINARY AT UNDER BRIDGE FOR KADI
NAGARPALIKA, KADI. DIST. MAHESANA UNDER 15TH FINANCE COMMISSION 2025-26 GRANT
SCHEDULE - "B-2"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1 1.00 Supply, installation, testing & commissioning of 799518.02 Rupees Seven Lac Ninety Nine No.
sewage submersible, non clog type suitable for Thousand Five Hundred Eighteen
working on three phase, 50 Hz ± 3%, 415 V ± 10%, and Two Paise
AC supply, 1450 RPM synchronous speed with 3 core
flat copper cable from pump to starter panel with cable
end terminations, all supports, clamps, pipe fittings
along with mechanical seal, bearing bush, strainer etc.
complete set & following M.O.C: Casing: CI,
Impeller: SS CF8M, Wearing ring & Bearing bush:
Bronze, TC mechanical seal, CS / SS bearing, SS shaft
with sleeve, SS strainer & MS motor body.
2 1.00 Auto Transformar starter suitable for local & remote 46700.38 Rupees Forty Six Thousand Seven No.
pump control application consisting of Auto Hundred and Thirty Eight Paise
transformer (vaccum impregnated, air cooled having
three (3) tapping at 50%, 65% and 80%), incomer
MCCB / MPCB, overload relay and contactors as per
Type II coordination including digital MFM with RS
485 communication port, analogue type ammeter with
selector switch, run hour meter, required protective
relay & control accessories.
(a) A.T.S. from 51 to 60 HP
3 30.00 PVC insulated flat / round submersible copper cables 658.52 Rupees Six Hundred Fifty Eight Rmt.
PVC insulated flat submersible cable as per details and Fifty Two Paise
technical specification of R/C of GWSSB conforming
to IS 694, IEC 60227 /
4 1.00 Lowering of openwell Horizontal submersible pump 1010.00 Rupees One Thousand Ten Only Job
set/bore well pump set in Well/Sump with HDPE
pipe/GI/MS column pipe by means of chain pulley
block/fixture & jointing the cable with fuse unit /
Control panel board including fitting accessories &
making it in working condition including satisfactory
(C) Above 20 HP
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting
the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
KADI NAGARPALIKA
PROVIDING, INSTALLING AND TESTING OF PUMPING MACHINARY AT UNDER BRIDGE FOR KADI
NAGARPALIKA, KADI. DIST. MAHESANA UNDER 15TH FINANCE COMMISSION 2025-26 GRANT
SCHEDULE - "B-2"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions, site moisture
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in consumption of
cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra payment shall be made for use of
additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work and amount
4) involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by the CHIEF
5) OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the works. (As per G.R. (R&B) Deptt.,
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat
7) Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments and conditions of
service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes excluding GST. and department will not entertain any contractor representation to reimburse any
9) financial burden due to applicable taxes.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
00 TITLE Page.pdf
01 Kadi Index.pdf
02 Kadi Pg 2 to 13.pdf
03 SBD Form.pdf
04 Specifications of Electrical Work.pdf
05 General Specification of Electrical Wiring in Govt Building.pdf
06 Electric Volume C 2012-2013.pdf
07 E2 Electrical Make List.pdf
08 Vendor-List-Mechanical.pdf
09 Civil-Vendor-List.pdf
10 Schedule B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .