Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC | ₹4.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.4 L+₹861.94 (0.19%)Rejected-AOC | ₹4.4 L+₹861.94 (0.19%) | L2 | Rejected-AOC L2 |
Tender Value
₹5 L
EMD Value
₹12,500
Closing Date
22 Feb 2022, 10:00 amClosed
Assistant Engineer
Assistant Engineer LID and EW Sub Division, Block Panchayath Malappuram
Malappuram Block Panchayath Annual plan 2021-22- Neendarathil Moochikkal Drinking water scheme in Pookkottur GP
2022_LSGD_474530_1
04/AEE/LID and EW/MPM/ET/2021-22
Open Tender
Civil Works - Water Works
Item Rate
180 days
Malappuram
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,180
Yes
₹12,500
Yes
30 Apr 2022
14 Feb 2022
22 Feb 2022
14 Feb 2022
22 Feb 2022
14 Feb 2022
Amount
Well renovation
od1610400/2021_2022 : Earth work excavation for well up 6.00m to 7.50
od1610466/2021_2022 : Earth work excavation for well at a depth of 7.50 to9.00
5.7 : Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size)
5.9.12 : Centering and shuttering including strutting, etc. and removal of form for:Well steining
50.2.3.1 : Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
10.25.2 : Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
50.6.7.1 : Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
J and J CONSTRUCTIONS
Bidder Name
J and J CONSTRUCTIONS
ABDUL NAZAR K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_680742.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .